An Coimisiún Pleanála - Case reference: PA06F.312131
Townlands of Clonshagh, Dubber and Newtown, County Fingal and Dublin City
Fingal County Council
Description
Greater Dublin Drainage Project consisting of a new wastewater treatment plant, sludge hub centre, orbital sewer, outfall pipeline and regional biosolids storage facility
Case type
Private Development - Application
Decision
Grant Perm. w Conditions
Date signed
09/07/2025
EIAR
Yes
NIS
Yes
Parties
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Active)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
~Commission for Railway Regulation
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
-
Irish Water (Applicant)
History
-
09/07/2025
Grant Perm. w Conditions
-
07/12/2021
Lodged
-
07/12/2021
Reactivated case, Old Number ABP-301908-18.
Documents
Inspectors Report (312/R312131-(R301908).pdf, .PDF format 2249KB)
Additional Inspectors Report (312/R312131_App3.pdf, .PDF format 376KB)
Additional Inspectors Report (312/R312131_App4.pdf, .PDF format 211KB)
Additional Inspectors Report (312/R312131_App5.pdf, .PDF format 196KB)
Additional Inspectors Report (312/R312131A.pdf, .PDF format 2755KB)
-
Case Documentation
- View associated documents
- Appellant Third Party Docs
- 27.02.25 - Email from EPA agreeing with request for extension of time to submit observations.pdf [PDF]
- ABP-312131-21 - Further information Submissions
- ABP-312131-21 - FI Submission - Barbara & Niall Connolly.pdf [PDF]
- ABP-312131-21 - FI Submission - Catherine McMahon.pdf [PDF]
- ABP-312131-21 - FI Submission - Chambers Ireland.pdf [PDF]
- ABP-312131-21 - FI Submission - Development Applications Unit (DAU).pdf [PDF]
- ABP-312131-21 - FI Submission - Dublin Airport Authority.pdf [PDF]
- ABP-312131-21 - FI Submission - Elaine Murray.pdf [PDF]
- ABP-312131-21 - FI Submission - EPA.pdf [PDF]
- ABP-312131-21 - FI Submission - Fingal County Council.pdf [PDF]
- ABP-312131-21 - FI Submission - HSE.pdf [PDF]
- ABP-312131-21 - FI Submission - IBEC.pdf [PDF]
- ABP-312131-21 - FI Submission - Irish Aviation.pdf [PDF]
- ABP-312131-21 - FI Submission - Joyce Kemper Sabrina
- ABP-312131-21 - FI Submission - Meath Co.Co.pdf [PDF]
- ABP-312131-21 - FI Submission - NTA.pdf [PDF]
- ABP-312131-21 - FI Submission - Peter Sweetman and Wild Ireland.pdf [PDF]
- ABP-312131-21 - FI Submission - Samantha Brown.pdf [PDF]
- ABP-312131-21 - FI Submission - Sean Lyons.pdf [PDF]
- ABP-312131-21 - FI Submission - South Dublin County Council.pdf [PDF]
- ABP-312131-21 - FI Submission - Sports Ireland.pdf [PDF]
- ABP-312131-21 - FI Submission - Terri Gray & Paul Burke.pdf [PDF]
- ABP-312131-21 - FI Submission - TII.pdf [PDF]
- ABP-312131-21 - FI Submission - Vivienne Burch.pdf [PDF]
- ABP-312131-21 - Invalid FI Submissions
- ABP-312131-21 - Invalid Submissions
- ABP-312131-21 - Submission - Joyce Kemper Sabrina
- ABP-312131-21 - Submission - Sabrina Joyce-Kemper.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A1 and A2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A10.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A11.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A12.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A13.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A14.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A15.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A16.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A17.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A18.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A19.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A20.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-1.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-3.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-4.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A22.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A23.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A24.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A26.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A27.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A3.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A4.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A5-1.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A5-2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A6.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A7.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A8-1.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A8-2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A9.pdf [PDF]
- ABP-312131-21 - Submission - Sabrina Joyce-Kemper - Searchable PDFs
- ABP-312131-21 - Submission - Joyce Kemper Sabrina - 1 of 3.pdf [PDF]
- ABP-312131-21 - Submission - Joyce Kemper Sabrina - 2 of 3.pdf [PDF]
- ABP-312131-21 - Submission - Joyce Kemper Sabrina - 3 of 3.pdf [PDF]
- ABP-312131-21 - Submission - Sabrina Joyce-Kemper.pdf [PDF]
- Appendices
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A1 and A2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A10.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A11.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A12.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A13.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A14.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A15.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A16.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A17.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A18.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A19.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A20.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-1.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-3.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-4.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A22.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A23.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A24.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A26.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A27.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A3.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A4.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A5-1.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A5-2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A6.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A7.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A8-1.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A8-2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A9.pdf [PDF]
- ABP-312131-21 - Submissions
- 18.12.24 - CRR Response received.pdf [PDF]
- ABP-312131-21 - Submission - Burch Vivienne and Others.pdf [PDF]
- ABP-312131-21 - Submission - Chambers Ireland.pdf [PDF]
- ABP-312131-21 - Submission - Development Applications Unit.pdf [PDF]
- ABP-312131-21 - Submission - Gray Terri and Burke Paul.pdf [PDF]
- ABP-312131-21 - Submission - Hart Eamonn.pdf [PDF]
- ABP-312131-21 - Submission - Haughey Sean .pdf [PDF]
- ABP-312131-21 - Submission - Joyce Kemper Sabrina
- ABP-312131-21 - Submission - Sabrina Joyce-Kemper.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A1 and A2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A10.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A11.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A12.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A13.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A14.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A15.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A16.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A17.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A18.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A19.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A20.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-1.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-3.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A21-4.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A22.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A23.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A24.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A26.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A27.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A3.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A4.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A5-1.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A5-2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A6.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A7.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A8-1.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A8-2.pdf [PDF]
- ABP-312131-21 - Submission Sabrina Joyce-Kemper - Appendix A9.pdf [PDF]
- ABP-312131-21 - Submission - Lyons Sean.pdf [PDF]
- ABP-312131-21 - Submission - McGuinness Garrett.pdf [PDF]
- ABP-312131-21 - Submission - McMahon Catherine.pdf [PDF]
- ABP-312131-21 - Submission - Mitchell Denise TD and Others.pdf [PDF]
- ABP-312131-21 - Submission - Murphy Anne.pdf [PDF]
- ABP-312131-21 - Submission - Murphy Maria.pdf [PDF]
- ABP-312131-21 - Submission - Portmarnock Beach Committee.pdf [PDF]
- ABP-312131-21 - Submission - TII.pdf [PDF]
- ABP-312131-21 - Submission - Walsh Bernadette.pdf [PDF]
- ABP-312131-21 Submission- EPA.pdf [PDF]
- ABP-312131-21-Submission from EPA.pdf [PDF]
- Applicants Documents
- 17.10.24 - ABP-312131-21_GDD Response to Submissions Report.pdf [PDF]
- 17.10.24 - ABP-312131-21_Letter to ABP 17 October 2024.pdf [PDF]
- 17.10.24 - email received from applicant attaching response to submission report.pdf [PDF]
- 27.02.24 - Letter from Applicant seeking extension of time to respond to FI.pdf [PDF]
- 30.10.24 - Letter received from Irish Water on 30.10.24 and Boards Response.pdf [PDF]
- ABP-301908-18 - Complete Site
- ABP-301908-18 - (PA) - Applicants - Irish Water - Response to Submissions.pdf [PDF]
- ABP-301908-18 - Additional Information submitted by Applicant
- ABP-301908-18 - CFI Submission - Annabella Rushe and Rushe Family.pdf [PDF]
- ABP-301908-18 - CFI Submission - Arthur O'Kelly.pdf [PDF]
- ABP-301908-18 - CFI Submission - Betty Browne and Co.pdf [PDF]
- ABP-301908-18 - CFI Submission - Betty Ennis and Alvis Crawford.pdf [PDF]
- ABP-301908-18 - CFI Submission - Brendan Regan.pdf [PDF]
- ABP-301908-18 - CFI Submission - Donabate and Portrane Community Council.pdf [PDF]
- ABP-301908-18 - CFI Submission - Dr Alex Mc Donnell.pdf [PDF]
- ABP-301908-18 - CFI Submission - Eamon Hart.pdf [PDF]
- ABP-301908-18 - CFI Submission - Eileen Cantwell and Others.pdf [PDF]
- ABP-301908-18 - CFI Submission - Failte Ireland.pdf [PDF]
- ABP-301908-18 - CFI Submission - Howth Sea Angling Club.pdf [PDF]
- ABP-301908-18 - CFI Submission - Jennifer Lyons.pdf [PDF]
- ABP-301908-18 - CFI Submission - John Cuddy and Others.pdf [PDF]
- ABP-301908-18 - CFI Submission - Karen Yeates and Others.pdf [PDF]
- ABP-301908-18 - CFI Submission - Maire Dunne.pdf [PDF]
- ABP-301908-18 - CFI Submission - Meakstown Community Council.pdf [PDF]
- ABP-301908-18 - CFI Submission - Michelle Burnett and Conor O'Malley.pdf [PDF]
- ABP-301908-18 - CFI Submission - Niamh Dunne.pdf [PDF]
- ABP-301908-18 - CFI Submission - Orla O'Kane and Others.pdf [PDF]
- ABP-301908-18 - CFI Submission - Peter Coyle.pdf [PDF]
- ABP-301908-18 - CFI Submission - Richard Bruton.pdf [PDF]
- ABP-301908-18 - CFI Submission - Sabrina Joyce Kemper.pdf [PDF]
- ABP-301908-18 - CFI Submission - Sean Haughey TD.pdf [PDF]
- ABP-301908-18 - CFI Submission - Sean Lyons.pdf [PDF]
- ABP-301908-18 - CFI Submission - Siobhan Hyde.pdf [PDF]
- ABP-301908-18 - CFI Submission - Siobhan O'Brien.pdf [PDF]
- ABP-301908-18 - CFI Submission - Terri Gray and Paul Burke.pdf [PDF]
- ABP-301908-18 - CFI Submission - Transport Infrastructure Ireland.pdf [PDF]
- ABP-301908-18 - CFI Submission - Velvet Strand Sea Swimmers - Overall Project Context Map.pdf [PDF]
- ABP-301908-18 - CFI Submission - Velvet Strand Sea Swimmers and Beach Users.pdf [PDF]
- ABP-301908-18 - Dublin City Council Report.pdf [PDF]
- ABP-301908-18 - Fingal County Council Report.pdf [PDF]
- ABP-301908-18 - Oral Hearing Attendance Sheets.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 47 - James Wade.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 1 - Irish Water - Sean Laffey.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 10 - Bette Browne.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 11 - Irish Water - Dara White.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 12 - Irish Water - Richard Hamilton.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 13 - Irish Water - Martin Hogan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 14 - Irish Water - Tom Cannon.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 15 - Irish Water - Imelda Shanahan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 16 - Irish Water - Imelda Shanahan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 17 - Irish Water.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 18 - Irish Water - James McCrory.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 19 - Irish Water - Richard Barker.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 2 - Irish Water - Ciaran O'Keefe.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 20 - Irish Water - Faith Bailey.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 21 - Irish Water - Kieran O'Dwyer.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 22 - Irish Water - Eoin Wyse.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 23 - Irish Water - Phillip Farrelly.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 24 - Irish Water - Damien Grehan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 25 -Irish Water - Damien Grehan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 26 - Irish Water - Ciaran O'Keefe.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 27 - Irish Water - Ross Kinsella.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 28 - Irish Water - Sarah Kiernan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 29 - Irish Water - Legal Submission.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 3 - Irish Water - Lara Gough.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 30 - Irish Water - Lara Gough.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 31 - Irish Water - Tom Cannon.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 32 - Irish Water - Ian Wilson.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 33 - Irish Water - Dara White.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 34 - Irish Water - Ciaran O Keefe.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 35 - Irish Water - Lara Gough.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 36 - Irish Water - Thomas Broughan TD.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 37 - Irish Water - Sarah Kiernan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 38 - Irish Water - Alan Berry.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 39 - Irish Water - Simon Zisman.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 4 - Irish Water - Dan O Boyle.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 40 - Fingal County Council.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 41 - Portmarnock Community Association.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 42 - Sean Haughey TD.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 43 - Cllr Eoghan O Brien.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 44 - Michael Keating.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 46 - Department of Culture, Heritage and the Gaeltacht.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 48 - Aebhin Cawley - Fingal County Council.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 49 - Local Primary School Students.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 5 - Irish Water - Alan Berry.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 50 - Damien Cassidy.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 51 - Edward Bourke.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 52 - Eamonn Hart.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 53 - Terri Gray.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 54 - Therese Doyle.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 55 - Gannon Properties.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 56 - Arthur O Kelly.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 57 - Maurice Mullen.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 58 - Eileen Cantwell and Donna Cooney.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 59 - Phillip Swan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 6 - Irish Water - Ian Wilson.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 60 - Bette Browne.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 61 - Sabrina Joyce Kemper.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 62 - Irish Water - Alan Berry.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 63 - Irish Water - James McCrory.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 64 - Irish Water - Ian Wilson.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 65 - Irish Water - Simon Zisman.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 66 - Irish Water - Tom Cannon.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 67 - Fingal County Council.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 68 -Irish Water - Imelda Shanahan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 69 - Irish Water - Imelda Shanahan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 7 - Irish Water - Simon Zisman.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 70 - Irish Water - Martin Hogan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 70a - Irish Water - Martin Hogan.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 71 - Catherine McMahon.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 72 - Sabrina Joyce Kemper.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 73 - Irish Water - Eoin Wyse.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 74 - Irish Water - Ciaran O Keefe.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 75 - Irish Water - Dan O Boyle.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 76 - Irish Water - Legal.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 77 - Eamonn Hart.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 78 - Fingal County Council.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 79 - Irish Water.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 8 - Irish Water - James McCrory.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 80 - Fingal County Council.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 81 - Irish Water.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 8A - Irish Water - James McCrory.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 8B - Irish Water - James McCrory.pdf [PDF]
- ABP-301908-18 - Oral Hearing Submission 9 - Irish Water - James McCrory.pdf [PDF]
- ABP-301908-18 - Submission - Aileen Murphy.pdf [PDF]
- ABP-301908-18 - Submission - Alex Mc Donnell.pdf [PDF]
- ABP-301908-18 - Submission - Alison Gilland.pdf [PDF]
- ABP-301908-18 - Submission - Angela and Michael Callanan.pdf [PDF]
- ABP-301908-18 - Submission - Ann O Keeffe.pdf [PDF]
- ABP-301908-18 - Submission - Anne Murphy.pdf [PDF]
- ABP-301908-18 - Submission - Anthony Doyle.pdf [PDF]
- ABP-301908-18 - Submission - Anthony Murphy.pdf [PDF]
- ABP-301908-18 - Submission - Ashling Leo Clodagh and Others.pdf [PDF]
- ABP-301908-18 - Submission - Aulden Grange Residents Association.pdf [PDF]
- ABP-301908-18 - Submission - Barbara Delaney.pdf [PDF]
- ABP-301908-18 - Submission - Barbara Shelley.pdf [PDF]
- ABP-301908-18 - Submission - Barbra and Niall Connolly.pdf [PDF]
- ABP-301908-18 - Submission - Bernadette Walsh.pdf [PDF]
- ABP-301908-18 - Submission - Betty Browne and Others.pdf [PDF]
- ABP-301908-18 - Submission - Breda Doyle.pdf [PDF]
- ABP-301908-18 - Submission - Brendan Keegan and Others.pdf [PDF]
- ABP-301908-18 - Submission - Brendan Regan.pdf [PDF]
- ABP-301908-18 - Submission - Brian Gibbons.pdf [PDF]
- ABP-301908-18 - Submission - Brian Mc Donoagh (Cllr).pdf [PDF]
- ABP-301908-18 - Submission - Brian Union.pdf [PDF]
- ABP-301908-18 - Submission - Carol Barr and Others.pdf [PDF]
- ABP-301908-18 - Submission - Carol Kamtoh.pdf [PDF]
- ABP-301908-18 - Submission - Caroline Purdy.pdf [PDF]
- ABP-301908-18 - Submission - Carolyn Finn.pdf [PDF]
- ABP-301908-18 - Submission - Catherine Mc Mahon and Others.pdf [PDF]
- ABP-301908-18 - Submission - Celia Herbert.pdf [PDF]
- ABP-301908-18 - Submission - Chambers Ireland.pdf [PDF]
- ABP-301908-18 - Submission - Charles Heasman.pdf [PDF]
- ABP-301908-18 - Submission - Chris Byrne.pdf [PDF]
- ABP-301908-18 - Submission - Cian O'Callaghan.pdf [PDF]
- ABP-301908-18 - Submission - Clare Daly TD.pdf [PDF]
- ABP-301908-18 - Submission - Clare Hall Residents Association.pdf [PDF]
- ABP-301908-18 - Submission - Clontarf Residents Association.pdf [PDF]
- ABP-301908-18 - Submission - Commission for Railway Regulation.pdf [PDF]
- ABP-301908-18 - Submission - Coolock Residents Association.pdf [PDF]
- ABP-301908-18 - Submission - Crystal Reid Perry and Others.pdf [PDF]
- ABP-301908-18 - Submission - Dalata Hotel Group PLC.pdf [PDF]
- ABP-301908-18 - Submission - Daniel Shine and Others.pdf [PDF]
- ABP-301908-18 - Submission - Darragh and Eoghan O'Brien.pdf [PDF]
- ABP-301908-18 - Submission - Darren Maher.pdf [PDF]
- ABP-301908-18 - Submission - David Healy (Cllr).pdf [PDF]
- ABP-301908-18 - Submission - Dean Sinclair.pdf [PDF]
- ABP-301908-18 - Submission - Deborah Byrne.pdf [PDF]
- ABP-301908-18 - Submission - Declan Flanagan (Cllr).pdf [PDF]
- ABP-301908-18 - Submission - Deirdre Mc Govern.pdf [PDF]
- ABP-301908-18 - Submission - Deirdre Seery.pdf [PDF]
- ABP-301908-18 - Submission - Deirdre Smyth.pdf [PDF]
- ABP-301908-18 - Submission - Denise Mitchell TD and Others.pdf [PDF]
- ABP-301908-18 - Submission - Derek Clifford.pdf [PDF]
- ABP-301908-18 - Submission - Development Applications Unit.pdf [PDF]
- ABP-301908-18 - Submission - Dolores Higgins.pdf [PDF]
- ABP-301908-18 - Submission - Donna Brazil.pdf [PDF]
- ABP-301908-18 - Submission - Dublin Airport Authority.pdf [PDF]
- ABP-301908-18 - Submission - Dublin Bay North Green Party.pdf [PDF]
- ABP-301908-18 - Submission - Eamonn Hart.pdf [PDF]
- ABP-301908-18 - Submission - Eddie Larkin and Others.pdf [PDF]
- ABP-301908-18 - Submission - Elaine Murray.pdf [PDF]
- ABP-301908-18 - Submission - Elaine Taaffe and Others.pdf [PDF]
- ABP-301908-18 - Submission - Elizabeth Mc Mahon.pdf [PDF]
- ABP-301908-18 - Submission - Elizabeth Sherlock.pdf [PDF]
- ABP-301908-18 - Submission - Emma Kavanagh amd Others.pdf [PDF]
- ABP-301908-18 - Submission - Emma Synnott and Others.pdf [PDF]
- ABP-301908-18 - Submission - Environmental Health at HSE.pdf [PDF]
- ABP-301908-18 - Submission - Ercolo and Grace Dettorre.pdf [PDF]
- ABP-301908-18 - Submission - Eugene Farrell.pdf [PDF]
- ABP-301908-18 - Submission - Finian Mc Grath TD.pdf [PDF]
- ABP-301908-18 - Submission - Fiona Mills.pdf [PDF]
- ABP-301908-18 - Submission - Freddie Snowe.pdf [PDF]
- ABP-301908-18 - Submission - Friends of Balscadden Bay.pdf [PDF]
- ABP-301908-18 - Submission - Gannon Properties.pdf [PDF]
- ABP-301908-18 - Submission - Gary Crawford.pdf [PDF]
- ABP-301908-18 - Submission - Gavin O'Connor.pdf [PDF]
- ABP-301908-18 - Submission - Gillian Cleary.pdf [PDF]
- ABP-301908-18 - Submission - Inland Fisheries Ireland.pdf [PDF]
- ABP-301908-18 - Submission - Jane Gribbin and Others.pdf [PDF]
- ABP-301908-18 - Submission - Jennifer Jones.pdf [PDF]
- ABP-301908-18 - Submission - Joe and Elaine Jones.pdf [PDF]
- ABP-301908-18 - Submission - Joe White.pdf [PDF]
- ABP-301908-18 - Submission - John Lyons (Cllr).pdf [PDF]
- ABP-301908-18 - Submission - John Pepper.pdf [PDF]
- ABP-301908-18 - Submission - John Walsh.pdf [PDF]
- ABP-301908-18 - Submission - Kathleen O'Reilly.pdf [PDF]
- ABP-301908-18 - Submission - Kayleigh Hone.pdf [PDF]
- ABP-301908-18 - Submission - Laurence and Geraldine Byrne.pdf [PDF]
- ABP-301908-18 - Submission - Linda Brady.pdf [PDF]
- ABP-301908-18 - Submission - Lorraine Clifford Lee.pdf [PDF]
- ABP-301908-18 - Submission - Louise Foley Cusack.pdf [PDF]
- ABP-301908-18 - Submission - Maire Dunne.pdf [PDF]
- ABP-301908-18 - Submission - Mandy McGuinness.pdf [PDF]
- ABP-301908-18 - Submission - Margaret Furlong.pdf [PDF]
- ABP-301908-18 - Submission - Maria Murphy.pdf [PDF]
- ABP-301908-18 - Submission - Marie Hayes.pdf [PDF]
- ABP-301908-18 - Submission - Mary Glacklin.pdf [PDF]
- ABP-301908-18 - Submission - Meakstown Community Council.pdf [PDF]
- ABP-301908-18 - Submission - Meath County Council.pdf [PDF]
- ABP-301908-18 - Submission - Michael and Elaine Byrne and Others.pdf [PDF]
- ABP-301908-18 - Submission - Michael O'Brien.pdf [PDF]
- ABP-301908-18 - Submission - Michelle and David O'Carroll.pdf [PDF]
- ABP-301908-18 - Submission - Michelle Salmon and Others.pdf [PDF]
- ABP-301908-18 - Submission - Miriam Kelly and Siobhan Daly.pdf [PDF]
- ABP-301908-18 - Submission - Natalie Donoghue and Others.pdf [PDF]
- ABP-301908-18 - Submission - Niall Reid.pdf [PDF]
- ABP-301908-18 - Submission - Niamh Dunne.pdf [PDF]
- ABP-301908-18 - Submission - Noel Conway.pdf [PDF]
- ABP-301908-18 - Submission - Patricia Keogh.pdf [PDF]
- ABP-301908-18 - Submission - Paul and Paula Fegan.pdf [PDF]
- ABP-301908-18 - Submission - Peadar Farrell.pdf [PDF]
- ABP-301908-18 - Submission - Peter Daly.pdf [PDF]
- ABP-301908-18 - Submission - Philip Swan.pdf [PDF]
- ABP-301908-18 - Submission - Philomena Fitzimons.pdf [PDF]
- ABP-301908-18 - Submission - Portmarnock Beach Committee.pdf [PDF]
- ABP-301908-18 - Submission - Portmarnock Community Association.pdf [PDF]
- ABP-301908-18 - Submission - Rachel Wynne.pdf [PDF]
- ABP-301908-18 - Submission - Residents of Newtown Court.pdf [PDF]
- ABP-301908-18 - Submission - Residents of Swift's Grove.pdf [PDF]
- ABP-301908-18 - Submission - Richelle Bailey.pdf [PDF]
- ABP-301908-18 - Submission - Riverside Residents Association.pdf [PDF]
- ABP-301908-18 - Submission - Samantha Brown and Others.pdf [PDF]
- ABP-301908-18 - Submission - Sandra Joyce Kemper.pdf [PDF]
- ABP-301908-18 - Submission - Sandra Whelan.pdf [PDF]
- ABP-301908-18 - Submission - Sarah Kernan.pdf [PDF]
- ABP-301908-18 - Submission - Sean Haughey TD.pdf [PDF]
- ABP-301908-18 - Submission - Sharon Hogan.pdf [PDF]
- ABP-301908-18 - Submission - Siobhan Hyde.pdf [PDF]
- ABP-301908-18 - Submission - Stacey Kelly.pdf [PDF]
- ABP-301908-18 - Submission - Stephanie Moore.pdf [PDF]
- ABP-301908-18 - Submission - Stephen and Theresa Walsh.pdf [PDF]
- ABP-301908-18 - Submission - Stephen Hickey.pdf [PDF]
- ABP-301908-18 - Submission - Susan Kavanagh.pdf [PDF]
- ABP-301908-18 - Submission - Susan Norton and Others.pdf [PDF]
- ABP-301908-18 - Submission - Terri Gray and Paul Burke.pdf [PDF]
- ABP-301908-18 - Submission - Theresa Doyle and Others.pdf [PDF]
- ABP-301908-18 - Submission - Therese Gregg.pdf [PDF]
- ABP-301908-18 - Submission - Thomas Broughan.pdf [PDF]
- ABP-301908-18 - Submission - Thomas Tolster.pdf [PDF]
- ABP-301908-18 - Submission - Tom and Breda Tracey.pdf [PDF]
- ABP-301908-18 - Submission - Tom Brabazon (Cllr).pdf [PDF]
- ABP-301908-18 - Submission - Transport Infrastructure Ireland.pdf [PDF]
- ABP-301908-18 - Submission - Vanessa Hoare.pdf [PDF]
- ABP-301908-18 - Submission - Winnie Mc Donnagh and Others.pdf [PDF]
- ABP-301908-18 - Submission - Woodland Residents Association.pdf [PDF]
- ABP-301908-18 CD 1
- Addendum - Omitted Documents - Contents.pdf [PDF]
- Newspaper Notice.pdf [PDF]
- Site Notice.pdf [PDF]
- Vol 2B Appendices relevat to Ch 5 Consideration of Alternatives
- Vol 3B Appendices relevant to Ch 18 Soils and Geology
- A18-1 Part 2 Summary Report on Bathymetric and Geophysical Data.pdf [PDF]
- A18-1 Part 3 Report on Geophysical Investigation for GDD Scheme Offshore Portmarnock.pdf [PDF]
- A18-1 Part 5 Offshore Site Investigation of Outfall Pipeline.pdf [PDF]
- A18-1 Part 6 Sub Bottom Analysis.pdf [PDF]
- A18-1 Part 7 Hydrographic Survey Report.pdf [PDF]
- A18-1 Part 8 Greater Dublin Drainage Scheme Fingal County Council TW 12 PRJ 007.pdf [PDF]
- A18-1 Part 9 Preliminary Ground Investigation Contract Phase 1.pdf [PDF]
- Vol 3B Appendix A11-1 Figures
- Vol 5A Figures relevant to Ch 20 Waste and Ch 21 Material Assets
- ABP-301908-18 CD 2
- Board Corresponedence
- ABP-301908-18 - Correspondence from Board to Parties - Notification of Determination after 20th Dec.pdf [PDF]
- ABP-301908-18 - Correspondence to Irish Rail.pdf [PDF]
- ABP-301908-18 - OH Letter to Irish Water.pdf [PDF]
- ABP-301908-18 - Oral hearing Agenda Letters issued to Parties.pdf [PDF]
- ABP-301908-18 - Oral Hearing Agenda.docx [DOCX]
- ABP-301908-18 - Revised Public Notices Letter to Parties.pdf [PDF]
- ABP-301908-18 Observer List.xlsx [XLSX]
- ABP-301908-18- Letter to Irish Water regarding Revised Public Notices.docx [DOCX]
- ABP-301908-18- Submissions letter to Dublin City Council.docx [DOCX]
- ABP-301908-18- Submissions letter to Fingal County Council.docx [DOCX]
- ABP-301908-18- Submissions letter to Irish Water.docx [DOCX]
- Environmental Documentation
- EIAR
- Volume 1 Non-Technical Summary
- Volume 2 Part A Introduction
- Volume 2 Part B Appendices
- Appendix A2.1 Summary of Stakeholder Responses (2013).pdf [PDF]
- Appendix A2.2 Summary of Stakeholder Responses (2018).pdf [PDF]
- Appendix A3.1 Assessment of Domestic and Non-Domestic Load.pdf [PDF]
- Appendix A4.1 Key Wastewater Treatment Standards Report.pdf [PDF]
- Appendix A4.2 Engineering Specialist Report for Crossings.pdf [PDF]
- Appendix A5.1 Assessment of Potential for Reuse of Treated Wastewater.pdf [PDF]
- Volume 2 Part B Appendices Cover and Contents.pdf [PDF]
- Volume 3 Part A GDD EIAR
- Chapter 10 Biodiversity (Ornithology).pdf [PDF]
- Chapter 11 Biodiversity (Terrestrial and Freshwater Aquatic).pdf [PDF]
- Chapter 12 Landscape and Visual.pdf [PDF]
- Chapter 13 Traffic and Transport.pdf [PDF]
- Chapter 14 Air Quality, Odour and Climate.pdf [PDF]
- Chapter 15 Noise and Vibration.pdf [PDF]
- Chapter 16 Archaeological, Architectural and Cultural Heritage.pdf [PDF]
- Chapter 17 Hydrology and Hydrogeology.pdf [PDF]
- Chapter 18 Soils and Geology.pdf [PDF]
- Chapter 19 Agronomy.pdf [PDF]
- Chapter 20 Waste.pdf [PDF]
- Chapter 21 Material Assets.pdf [PDF]
- Chapter 22 Risk of Major Accidents and or Disasters.pdf [PDF]
- Chapter 23 Cumulative Impacts and Environmental Interactions.pdf [PDF]
- Chapter 24 Summary of Mitigation Measures.pdf [PDF]
- Chapter 25 Summary of Residual Impacts.pdf [PDF]
- Chapter 6 Population.pdf [PDF]
- Chapter 7 Human Health.pdf [PDF]
- Chapter 8 Marine Water Quality.pdf [PDF]
- Chapter 9 Biodiversity (Marine).pdf [PDF]
- Volume 3 Part A Cover, Contents, Preface and Glossary.pdf [PDF]
- Volume 3 Part B Appendices
- Appendix A10.1 Estuarine Ornithological Surveys.pdf [PDF]
- Appendix A10.2 Vessel Management Plan.pdf [PDF]
- Appendix A11.1 Bat Survey and Assessment 2017.pdf [PDF]
- Appendix A11.2 Botanical Survey at Portmarnock.pdf [PDF]
- Appendix A11.3 Ecological Survey for Smooth Newt.pdf [PDF]
- Appendix A13.1 Scoping Documentation.pdf [PDF]
- Appendix A13.2 Traffic Calculations.pdf [PDF]
- Appendix A13.3 Construction Programme.pdf [PDF]
- Appendix A13.4 Count Data.pdf [PDF]
- Appendix A13.5 Junction 9 Outputs.pdf [PDF]
- Appendix A13.6 Road Safety Audit.pdf [PDF]
- Appendix A14.1 Construction Dust Assessment.pdf [PDF]
- Appendix A14.2 Baseline Ambient Air Quality Report 2017.pdf [PDF]
- Appendix A14.3 Baseline Ambient Air Quality Report 2016.pdf [PDF]
- Appendix A14.4 Estimation of Emission Rates from the Proposed Abbotstown Pumping Station and Wastewater Treatment Plant.pdf [PDF]
- Appendix A14.5 Detailed Dispersion Modelling Predictions.pdf [PDF]
- Appendix A14.6 Mitigation Measures and Abatement Options.pdf [PDF]
- Appendix A15.1 Glossary of Noise Terms.pdf [PDF]
- Appendix A15.2 Detailed Baseline Noise Monitoring Report.pdf [PDF]
- Appendix A15.3 Connolly Hospital Baseline Vibration Monitoring Results.pdf [PDF]
- Appendix A15.4 Assumed Activity for the Proposed Wastewater Treatment Plant Operational Phase.pdf [PDF]
- Appendix A16.1 Recorded Archaeological Heritage Sites Within the Receiving Environment.pdf [PDF]
- Appendix A16.10 Archaeological Testing Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.11 Intertidal Archaeological Survey Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.12 Marine Archaeological Geophysical Survey Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.13 Marine Archaeological Dive Survey Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.2 Recorded Shipwrecks Within the Receiving Environment.pdf [PDF]
- Appendix A16.3 Stray Archaeological Finds Recorded Within the Receiving Environment.pdf [PDF]
- Appendix A16.4 Recorded Built Heritage Sites Within the Receiving Environment.pdf [PDF]
- Appendix A16.5 Areas of Archaeological Potential Identified Within the Receiving Environment.pdf [PDF]
- Appendix A16.6 Designed Landscapes Located Within the Receiving Environment.pdf [PDF]
- Appendix A16.7 Unrecorded Built Heritage Sites Identified Within the Receiving Environment.pdf [PDF]
- Appendix A16.8 Townland Boundaries to be Crossed by the Proposed Project.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part A.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part B.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part C.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part D.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part E.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part F.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part G.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part H.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part I.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part J.pdf [PDF]
- Appendix A17.1 Flood Risk Assessment Report.pdf [PDF]
- Appendix A17.2 Groundwater Well Survey Questionnaire Summary.pdf [PDF]
- Appendix A17.3 Site Investigation Borehole Locations and Report.pdf [PDF]
- Appendix A17.4 Groundwater Quality Analyses Results.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part A.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part B.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part C.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part D.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part E.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part F.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part G.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part H.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part I.pdf [PDF]
- Appendix A18.2 Ground Investigation Location Drawings.pdf [PDF]
- Appendix A19.1 Landowner Impact Assessment Table.pdf [PDF]
- Appendix A6.1 Residential Settlements within the Proposed Project Study Area.pdf [PDF]
- Appendix A6.2 Relevant Local Area Plans.pdf [PDF]
- Appendix A8.1 Model Development and Calibration.pdf [PDF]
- Appendix A9.1 Marine Ecology Reports.pdf [PDF]
- Appendix A9.2 Marine Mammal Survey Investigation.pdf [PDF]
- Appendix A9.3 Underwater Noise Assessment and Modelling.pdf [PDF]
- Volume 3 Part B Cover and Contents.pdf [PDF]
- Volume 4 Part A RBSF EIAR
- Volume 4 Part B Appendices
- Volume 5 Part A GDD Figures
- Figure 10.1 Location and Extent of Marine, Coastal and Estuarine Ornithological Surveys.pdf [PDF]
- Figure 10.2 Bird Distribution within 90 m of Construction Compound No. 9 (December 2014 to March 2018).pdf [PDF]
- Figure 10.3 Bird Distribution within 90 m of Construction Compound No.10 (December 2014 to March 2018).pdf [PDF]
- Figure 10.7 Distribution of Non-Feeding Razorbill Records.pdf [PDF]
- Figure 11.1 Special Areas of Conservation.pdf [PDF]
- Figure 11.3 Natural Heritage Areas.pdf [PDF]
- Figure 11.4 Dublin Bay UNESCO Biosphere Reserve.pdf [PDF]
- Figure 11.5 Habitat Survey Results (1 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (2 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (3 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (4 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (5 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (6 of 6).pdf [PDF]
- Figure 11.7 Freshwater Sampling Locations.pdf [PDF]
- Figure 12.1 Landscape and Visual Impact Assesment Study Area.pdf [PDF]
- Figure 12.2 Zone of Theoretical Visibility for the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 12.3 Viewpoint Locations Map.pdf [PDF]
- Figure 12.4 Landscape and Visual Mitigation Concept.pdf [PDF]
- Figure 12.5 Proposed Wastewater Treatment Plant Landscape Mitigation Plan.pdf [PDF]
- Figure 12.6 Proposed Abbotstown Pumping Station.pdf [PDF]
- Figure 13.1 Traffic Assessment Locations.pdf [PDF]
- Figure 13.3 Proposed Left-Turn Site Access Junction on R139 Road.pdf [PDF]
- Figure 13.4 Proposed Left-Turn Site Exit on Clonshaugh Road.pdf [PDF]
- Figure 13.5 Autotrack Analysis – Max Regualted Articulated Vehicle.pdf [PDF]
- Figure 14.1 Study Area for the Construction Phase Air Quality Impact Assessment (1 of 2).pdf [PDF]
- Figure 14.1 Study Area for the Construction Phase Air Quality Impact Assessment (2 of 2).pdf [PDF]
- Figure 14.2 Study Area for the Operational Phase of the Air Quality Impact Assessment.pdf [PDF]
- Figure 14.3 Air Quality Monitoring Locations (1 of 3).pdf [PDF]
- Figure 14.3 Air Quality Monitoring Locations (2 of 3).pdf [PDF]
- Figure 14.3 Air Quality Monitoring Locations (3 of 3).pdf [PDF]
- Figure 14.4 Receptor Locations (1 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (2 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (3 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (4 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (5 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (6 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (7 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (8 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (9 of 9).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (1 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (2 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (3 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (4 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (5 of 5).pdf [PDF]
- Figure 15.2 Vibration Monitoring Locations at Connolly Hospital.pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (1 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (2 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (3 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (4 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (5 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (6 of 6).pdf [PDF]
- Figure 15.4 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Daytime).pdf [PDF]
- Figure 15.5 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Evening Time).pdf [PDF]
- Figure 15.6 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Night-time).pdf [PDF]
- Figure 15.7 Calculated Noise Contours for the Proposed Abbotstown Pumping Station Operational Phase.pdf [PDF]
- Figure 15.8 Calculated Noise Contours for the Proposed Dubber Odour Control Unit Operational Phase.pdf [PDF]
- Figure 16.1 Proposed Project (Blanchardstown) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.2 Proposed Project (M50 Junction 5)Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.3 Proposed Project (Silloge) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.4 Proposed Project (Clonshagh) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.5 Proposed Project (St Doolaghs) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.6 Proposed Project (Baldoyle Estuary Nature Reserve) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 17.1 Proposed Project Overview.pdf [PDF]
- Figure 17.10 Proposed Watercourse Crossings.pdf [PDF]
- Figure 17.11 Location of Site Investigation Boreholes at Clonshagh.pdf [PDF]
- Figure 17.12 Location of Site Investigation Boreholes.pdf [PDF]
- Figure 17.2 Groundwater Supply Well.pdf [PDF]
- Figure 17.3 Hydrological Study Area.pdf [PDF]
- Figure 17.4 Bedrock Geology.pdf [PDF]
- Figure 17.5 Aquifer Classification.pdf [PDF]
- Figure 17.6 Groundwater Vulnerability.pdf [PDF]
- Figure 17.7 Soils.pdf [PDF]
- Figure 17.8 Groundwater Supply Wells.pdf [PDF]
- Figure 17.9 Portmarnock Golf Club Irrigation Wells and Flow Regime.pdf [PDF]
- Figure 18.1 Teagasc Subsoils Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.1 Teagasc Subsoils Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.1 Teagasc Subsoils Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 18.2 Bedrock Geology Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.2 Bedrock Geology Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.2 Bedrock Geology Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 18.3 Route Constraints Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.3 Route Constraints Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.3 Route Constraints Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 18.4 Site Investigation Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.4 Site Investigation Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.4 Site Investigation Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (1 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (2 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (3 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (4 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (5 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (6 of 6).pdf [PDF]
- Figure 23.1 Other Developments Considered.pdf [PDF]
- Figure 3.1 Contributing Catchments of Existing Wastewater Treatment Plants.pdf [PDF]
- Figure 3.2 Critical Catchments.pdf [PDF]
- Figure 3.3 Potential Secondary Catchments.pdf [PDF]
- Figure 4.1 Proposed Project Overview.pdf [PDF]
- Figure 4.2 Designated Areas in the Vicinity of the Proposed Project.pdf [PDF]
- Figure 4.3 Proposed Wastewater Treatment Plant Site.pdf [PDF]
- Figure 4.4 Land Use Zoning Objectives at the Proposed Wastewater Treatment Plant Site.pdf [PDF]
- Figure 4.5 Zonal Arrangement of the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 4.6 Typical Detail of the Proposed Pipeline Route Construction Corridor.pdf [PDF]
- Figure 4.7 Typical Arrangement for Proposed Microtunnelling Compound.pdf [PDF]
- Figure 4.8 Typical Cross Section of the Proposed Pipeline Route Trench Dredged in the Seabed.pdf [PDF]
- Figure 6.1 Study Area for the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 6.10 Tourism, Public Amenities, Sporting and Community Infrastructure.pdf [PDF]
- Figure 6.2 Study Area for Proposed Orbital Sewer Route, Outfall Pipeline Route and Abbotstown Pumping Station.pdf [PDF]
- Figure 6.3 Residential Buildings within the Proposed Project Study Area.pdf [PDF]
- Figure 6.4 Land Use Zonings within the Proposed Project Study Area.pdf [PDF]
- Figure 6.5 Residential Zoned Lands within the Proposed Project Study Area.pdf [PDF]
- Figure 6.6 Economic Activity within the Proposed Project Study Area.pdf [PDF]
- Figure 6.7 Commercial Clusters within the Proposed Project Study Area.pdf [PDF]
- Figure 6.8 Healthcare Facilities within the Proposed Project Study Area.pdf [PDF]
- Figure 6.9 Primary and Secondary Level Schools within the Proposed Project Study Area.pdf [PDF]
- Figure 8.1 Coastal and Transitional Waterbodies.pdf [PDF]
- Figure 8.10 Marine Sampling Stations.pdf [PDF]
- Figure 8.11 Ecological Status.pdf [PDF]
- Figure 8.12 Quality of Bathing Waters.pdf [PDF]
- Figure 8.13 Trophic Status.pdf [PDF]
- Figure 8.2 Designated Areas.pdf [PDF]
- Figure 8.3 Model mesh and Bathymetry.pdf [PDF]
- Figure 8.4 High Resolution Mesh.pdf [PDF]
- Figure 8.5 Calibration Locations.pdf [PDF]
- Figure 8.6 Vibrocore and Borehole Locations.pdf [PDF]
- Figure 8.7 Modelled Rivers and Hydrometric Stations.pdf [PDF]
- Figure 8.8 Wastewater Treatment Plant Outfall Locations.pdf [PDF]
- Figure 8.9 Modelled Rivers and Quality Stations.pdf [PDF]
- Figure 9.1 Summary of Field Survey Operations for the Proposed Outfall Pipeline Route.pdf [PDF]
- Figure 9.2 Summary of Bathymetry Data for the Proposed Outfall Pipeline Route.pdf [PDF]
- Figure 9.3 Sediment Changes near the Proposed Outfall Pipeline Route and Diffuser Location.pdf [PDF]
- Figure 9.4 Casual Sightings and Dedicated Surveys of the Harbour Porpoise.pdf [PDF]
- Figure 9.5 Inshore Shelfish Grounds along the Fingal Coast.pdf [PDF]
- Figure 9.6 Maximum Suspended Sediment Plume Concentrations arising from dredging over the duration of the dredging works for the proposed outfall pipeline route.pdf [PDF]
- Volume 5 Part A Cover and Contents.pdf [PDF]
- Volume 5 Part B RBSF Figures
- Volume 5 Part B Cover and Contents.pdf [PDF]
- Y17702-PL-001 - General Site Location Plan.pdf [PDF]
- Y17702-PL-002 - Site Location Map.pdf [PDF]
- Y17702-PL-003 - Existing Site Layout.pdf [PDF]
- Y17702-PL-004 - Proposed Site Layout.pdf [PDF]
- Y17702-PL-005 - Existing Buildings to be Demolished - Elevations and Plans.Pdf [PDF]
- Y17702-PL-006 - Proposed Ancillary Buildings.pdf [PDF]
- Y17702-PL-007 - Storage Building A - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-008 - Storage Building A - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-009 - Storage Building B - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-010 - Storage Building B - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-011 - Landscape Layout.pdf [PDF]
- Y17702-PL-012 - Contiguous Elevations.pdf [PDF]
- Y17702-PL-013 - Proposed Road Layout and Markings.pdf [PDF]
- Y17702-PL-014 - Junction Layout, Lamp Standard and Typical Road Details.pdf [PDF]
- Y17702-PL-015 - Surface Water Drainage Layout.pdf [PDF]
- Y17702-PL-016 - Surface Water Drainage - Typical Details.pdf [PDF]
- Y17702-PL-017 - Foul Drainage Layout.pdf [PDF]
- Y17702-PL-018 - Existing Foul Pumping Station - Plans and Section.pdf [PDF]
- Y17702-PL-019 - Manhole, Trench Backfill And Bedding - Typical Details.pdf [PDF]
- Y17702-PL-020 - Watermain Layout.pdf [PDF]
- Y17702-PL-021 - Watermain Typical Details.pdf [PDF]
- Y17702-PL-022 - Odour Control Unit - Plan and Elevation.pdf [PDF]
- Y17702-PL-023 - Electricity and External Lighting Layout.pdf [PDF]
- Y17702-PL-024 - Site Development Details.pdf [PDF]
- Y17702-PL-025 - Weighbridge Details and ME Control Building.pdf [PDF]
- Y17702-PL-026 - Construction and Permanent Information Sign.pdf [PDF]
- Y17702-PL-027 - Proposed Site Layout Overlaid with Services.pdf [PDF]
- Volume 6 Photomontages
- Viewpoint 1.pdf [PDF]
- Viewpoint 10.pdf [PDF]
- Viewpoint 11.pdf [PDF]
- Viewpoint 12.pdf [PDF]
- Viewpoint 13.pdf [PDF]
- Viewpoint 14.pdf [PDF]
- Viewpoint 2.pdf [PDF]
- Viewpoint 3.pdf [PDF]
- Viewpoint 4.pdf [PDF]
- Viewpoint 5.pdf [PDF]
- Viewpoint 6.pdf [PDF]
- Viewpoint 7.pdf [PDF]
- Viewpoint 8.pdf [PDF]
- Viewpoint 9.pdf [PDF]
- Volume 6 Cover and Contents.pdf [PDF]
- Natura Impact Statement
- EIAR
- Planning Documentation
- Community Benefits Scheme.pdf [PDF]
- GDD CEMP
- GDD Outline CEMP Appendix 1 Planning Drawings Register.pdf [PDF]
- GDD Outline CEMP Appendix 2 Appendix A Part 1.pdf [PDF]
- GDD Outline CEMP Appendix 2 Appendix A Part 2.pdf [PDF]
- GDD Outline CEMP Appendix 2 Outline Traffic Management Plan.pdf [PDF]
- GDD Outline CEMP Appendix 3 Surface Water Management Plan.pdf [PDF]
- GDD Outline Construction Environmental Management Plan.pdf [PDF]
- GDD Cover Page and Drawing Index.pdf [PDF]
- GDD Engineering Design Report.pdf [PDF]
- GDD Flood Risk Assessment.pdf [PDF]
- GDD Planning Drawings
- 32102902-2000_P01 Overall Project Context Map.pdf [PDF]
- 32102902-2001_P01 Project Route Map - Sheet 1 of 14.pdf [PDF]
- 32102902-2002_P01 Project Route Map - Sheet 2 of 14.pdf [PDF]
- 32102902-2003_P01 Project Route Map - Sheet 3 of 14.pdf [PDF]
- 32102902-2004_P01 Project Route Map - Sheet 4 of 14.pdf [PDF]
- 32102902-2005_P01 Project Route Map - Sheet 5 of 14.pdf [PDF]
- 32102902-2006_P01 Project Route Map - Sheet 6 of 14.pdf [PDF]
- 32102902-2007_P01 Project Route Map - Sheet 7 of 14.pdf [PDF]
- 32102902-2008_P01 Project Route Map - Sheet 8 of 14.pdf [PDF]
- 32102902-2009_P01 Project Route Map - Sheet 9 of 14.pdf [PDF]
- 32102902-2010_P01 Project Route Map - Sheet 10 of 14.pdf [PDF]
- 32102902-2011_P01 Project Route Map - Sheet 11 of 14.pdf [PDF]
- 32102902-2012_P01 Project Route Map - Sheet 12 of 14.pdf [PDF]
- 32102902-2013_P01 Project Route Map - Sheet 13 of 14.pdf [PDF]
- 32102902-2014_P01 Project Route Map - Sheet 14 of 14.pdf [PDF]
- 32102902-2100_P01 Proposed Orbiral Sewer Route - Sheet 1 of 4.pdf [PDF]
- 32102902-2101_P01 Proposed Orbiral Sewer Route - Sheet 2 of 4.pdf [PDF]
- 32102902-2102_P01 Proposed Orbiral Sewer Route - Sheet 3 of 4.pdf [PDF]
- 32102902-2103_P01 Proposed Orbiral Sewer Route - Sheet 4 of 4.pdf [PDF]
- 32102902-2104_P01 Proposed Outfall Pipeline Route (Land Based Section) - Sheet 1 of 2.pdf [PDF]
- 32102902-2105_P01 Proposed Outfall Pipeline Route (Land Based Section) - Sheet 2 of 2.pdf [PDF]
- 32102902-2106_P01 Proposed North Fringe Sewer Diversion.pdf [PDF]
- 32102902-2107_P01 Proposed Outfall Pipeline Route (Marine Section) - Sheet 1 of 2.pdf.pdf [PDF]
- 32102902-2108_P01 Proposed Outfall Pipeline Route (Marine Section) - Sheet 2 of 2.pdf [PDF]
- 32102902-2109_P01 Trenchless Crossing - N2 Road.pdf [PDF]
- 32102902-2110_P01 Trenchless Crossing - Old Airport Road.pdf [PDF]
- 32102902-2111_P01 Trenchless Crossing - M1 Motorway.pdf [PDF]
- 32102902-2112_P01 Trenchless Crossing - Dublin Belfast Railway.pdf [PDF]
- 32102902-2113_P01 Trenchless Crossing - Portmarnock Golf Course.pdf [PDF]
- 32102902-2119_P01 Regional WwTP Location Map.pdf [PDF]
- 32102902-2120_P01 Regional WwTP Indicative Plan ASP Option.pdf.pdf [PDF]
- 32102902-2121_P01 Regional WwTP Indicative Plan ASP Option (1 of 6).pdf.pdf [PDF]
- 32102902-2122_P01 Regional WwTP Indicative Plan ASP Option (2 of 6).pdf.pdf [PDF]
- 32102902-2123_P01 Regional WwTP Indicative Plan ASP Option (3 of 6).pdf.pdf [PDF]
- 32102902-2124_P01 Regional WwTP Indicative Plan ASP Option (4 of 6).pdf.pdf [PDF]
- 32102902-2125_P01 Regional WwTP Indicative Plan ASP Option (5 of 6).pdf.pdf [PDF]
- 32102902-2126_P01 Regional WwTP Indicative Plan ASP Option (6 of 6).pdf.pdf [PDF]
- 32102902-2127_P01 Regional WwTP Indicative Elevations ASP Option (1 of 8).pdf.pdf [PDF]
- 32102902-2128_P01 Regional WwTP Indicative Elevations ASP Option (2 of 8).pdf.pdf [PDF]
- 32102902-2129_P01 Regional WwTP Indicative Elevations ASP Option (3 of 8).pdf.pdf [PDF]
- 32102902-2130_P01 Regional WwTP Indicative Elevations ASP Option (4 of 8).pdf.pdf [PDF]
- 32102902-2131_P01 Regional WwTP Indicative Elevations ASP Option (5 of 8).pdf.pdf [PDF]
- 32102902-2132_P01 Regional WwTP Indicative Elevations ASP Option (6 of 8).pdf.pdf [PDF]
- 32102902-2133_P01 Regional WwTP Indicative Elevations ASP Option (7 of 8).pdf.pdf [PDF]
- 32102902-2134_P01 Regional WwTP Indicative Elevations ASP Option (8 of 8).pdf.pdf [PDF]
- 32102902-2135_P01 Regional WwTP Indicative Sections ASP Option Sectional Elevation - Cut (1 of 3).pdf.pdf [PDF]
- 32102902-2136_P01 Regional WwTP Indicative Sections ASP Option Sectional Elevation - Cut (2 of 3).pdf.pdf [PDF]
- 32102902-2137_P01 Regional WwTP Indicative Sections ASP Option Sectional Elevation - Cut (3 of 3).pdf.pdf [PDF]
- 32102902-2138_P01 Regional WwTP Indicative Plan SBR Option.pdf.pdf [PDF]
- 32102902-2139_P01 Regional WwTP Indicative Plan AGS Option.pdf.pdf [PDF]
- 32102902-2140_P01 Abbotstown Pumping Station - Existing Site Layout Plan.pdf [PDF]
- 32102902-2141_P01 Abbotstown Pumping Station - Proposed Site Layout Plan.pdf [PDF]
- 32102902-2142_P01 Abbotstown Pumping Station - Site Elevations.pdf [PDF]
- 32102902-2143_P01 Abbotstown Pumping Station - Site Sections.pdf [PDF]
- 32102902-2144_P01 Abbotstown Pumping Station - Building Details.pdf [PDF]
- 32102902-2145_P01 Abbotstown Pumping Station Proposed Site Layout Plan - Engineering Services.pdf [PDF]
- 32102902-2146_P01 Abbotstown Pumping Station Fire Safety Review.pdf [PDF]
- 32102902-2147_P01 Typical Details Odour Control Unit.pdf [PDF]
- 32102902-2148_P01 Proposed Culvert at Mayne River Crossing - WwTP Access Road (Sheet 1 of 2).pdf [PDF]
- 32102902-2149_P01 Proposed Culvert at Mayne River Crossing - WwTP Access Road (Sheet 2 of 2).pdf [PDF]
- 32102902-2200_P01 Typical Details Gravity Pipelines 1 of 2.pdf [PDF]
- 32102902-2201_P01 Typical Details Gravity Pipelines 2 of 2.pdf [PDF]
- 32102902-2202_P01 Typical Details Pressure Pipelines 1 of 3.pdf [PDF]
- 32102902-2203_P01 Typical Details Pressure Pipelines 2 of 3.pdf [PDF]
- 32102902-2204_P01 Typical Details Pressure Pipelines 3 of 3.pdf [PDF]
- 32102902-2206_P01 Tunnelling Compound Typical Arrangement.pdf [PDF]
- 32102902-2207_P01 Proposed Subsea Crossing Of Fibre Optic Cable.pdf [PDF]
- 32102902-2208_P01 Marine Rises And Diffuser System - Typical Details.pdf [PDF]
- GDD Cover Page and Drawing Index.pdf [PDF]
- Greater Dublin Drainage Strategy Overview and Future Strategic Needs.pdf [PDF]
- Location of Site Notices.pdf [PDF]
- Public Stakeholder Participation Report.pdf [PDF]
- RBSF Architectural Design Report.pdf [PDF]
- RBSF Engineering Design Report.pdf [PDF]
- RBSF Flood Risk Assessment.pdf [PDF]
- RBSF Outline Construction Environmental Management Plan.pdf [PDF]
- RBSF Planning Drawings
- RBSF Drawing Schedule and Drawings.pdf [PDF]
- Y17702-PL-001 - General Site Location Plan.pdf [PDF]
- Y17702-PL-002 - Site Location Map.pdf [PDF]
- Y17702-PL-003 - Existing Site Layout.pdf [PDF]
- Y17702-PL-004 - Proposed Site Layout.pdf [PDF]
- Y17702-PL-005 - Existing Buildings to be Demolished - Elevations and Plans.Pdf [PDF]
- Y17702-PL-006-Proposed Ancillary Buildings -Elevations, Plans and Typical Cross Sections.pdf [PDF]
- Y17702-PL-007 - Storage Building A - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-008 - Storage Building A - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-009 - Storage Building B - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-010 - Storage Building B - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-011 - Landscape Layout.pdf [PDF]
- Y17702-PL-012 - Contiguous Elevations.pdf [PDF]
- Y17702-PL-013 - Proposed Road Layout and Markings.pdf [PDF]
- Y17702-PL-014 - Junction Layout, Lamp Standard and Typical Road Details.pdf [PDF]
- Y17702-PL-015 - Surface Water Drainage Layout.pdf [PDF]
- Y17702-PL-016 - Surface Water Drainage - Typical Details.pdf [PDF]
- Y17702-PL-017 - Foul Drainage Layout.pdf [PDF]
- Y17702-PL-018 - Existing Foul Pumping Station - Plans and Section.pdf [PDF]
- Y17702-PL-019 - Manhole, Trench Backfill And Bedding - Typical Details.pdf [PDF]
- Y17702-PL-020 - Watermain Layout.pdf [PDF]
- Y17702-PL-021 - Watermain Typical Details.pdf [PDF]
- Y17702-PL-022 - Odour Control Unit - Plan and Elevation.pdf [PDF]
- Y17702-PL-023 - Electricity and External Lighting Layout.pdf [PDF]
- Y17702-PL-024 - Site Development Details.pdf [PDF]
- Y17702-PL-025 - Weighbridge Details and ME Control Building.pdf [PDF]
- Y17702-PL-026 - Construction and Permanent Information Sign.pdf [PDF]
- Y17702-PL-027 - Proposed Site Layout Overlaid with Services.pdf [PDF]
- SID Planning Report.pdf [PDF]
- Statutory Documentation
- ABP-312131-21 - FI Information application
- ABP-312131-21 - Letter from Irish Water dated 29th June 2022.pdf [PDF]
- ABP-312131-21 - Letter received from IW dated 25th August 2022.pdf [PDF]
- ABP-312131-21 - Letter received from IW dated 29th June 2022.pdf [PDF]
- ABP-312131-21 - Letter received from IW dated 5th May 2022.pdf [PDF]
- ABP-312131-21 - Letter received from Jacobs dated 11th November 2022.pdf [PDF]
- ABP-312131-21 - Response to F.I Request.pdf [PDF]
- ABP-312131-21 - Revised EIAR
- Cover Letter
- Environmental Documents
- EIAR Addendum
- Volume 1A
- Volume 2A Part A
- Chapter 1A Introduction.pdf [PDF]
- Chapter 2A The Environmental Impact Assessment Process.pdf [PDF]
- Chapter 3A The Need for the Proposed Project.pdf [PDF]
- Chapter 4A Description of the Proposed Project.pdf [PDF]
- Chapter 5A Consideration of Alternatives.pdf [PDF]
- Volume 2A Part A Cover, Preface, Content and Glossary.pdf [PDF]
- Volume 2A Part B
- Volume 3A Part A
- Chapter 10A Biodiversity (Marine Ornithology).pdf [PDF]
- Chapter 11A Biodiversity (Terrestrial and Freshwater Aquatic).pdf [PDF]
- Chapter 12A Landscape and Visual.pdf [PDF]
- Chapter 13A Traffic and Transport.pdf [PDF]
- Chapter 14A Air Quality, Odour and Climate.pdf [PDF]
- Chapter 15A Noise and Vibration.pdf [PDF]
- Chapter 16A Archaeological, Architectural and Cultural Heritage.pdf [PDF]
- Chapter 17A Hydrology and Hydrogeology.pdf [PDF]
- Chapter 18A Soils and Geology.pdf [PDF]
- Chapter 19A Agronomy.pdf [PDF]
- Chapter 20A Waste.pdf [PDF]
- Chapter 21A Material Assets.pdf [PDF]
- Chapter 22A Risk of Major Accidents and or Disasters.pdf [PDF]
- Chapter 23A Cumulative Impacts and Environmental Interactions.pdf [PDF]
- Chapter 24A Summary of Mitigation Measures.pdf [PDF]
- Chapter 25A Summary of Residual Impacts.pdf [PDF]
- Chapter 6A Population and Human Health_Population.pdf [PDF]
- Chapter 7A Population and Human Health_Human Health.pdf [PDF]
- Chapter 8A Marine Water Quality.pdf [PDF]
- Chapter 9A Biodiversity (Marine).pdf [PDF]
- Volume 3A Part A Cover, Preface, Content and Glossary.pdf [PDF]
- Volume 3A Part B
- Appendix A10.1 Ornithology (Marine) Baseline Survey Report.pdf [PDF]
- Appendix A10.2 Revised Vessel Management Plan.pdf [PDF]
- Appendix A10.3 Written Responses to Biodiversity (Ornithology).pdf [PDF]
- Appendix A11.1 Confidential Badger Report.pdf [PDF]
- Appendix A11.1 Terrestrial Baseline Survey Report.pdf [PDF]
- Appendix A11.2 Terrestrial Ornithology Technical Report.pdf [PDF]
- Appendix A11.3 Response to Biodiversity (Terrestrial) Queries.pdf [PDF]
- Appendix A13.1 Traffic Calculations.pdf [PDF]
- Appendix A13.2 Count Data.pdf [PDF]
- Appendix A13.3 Updated Construction Programme.pdf [PDF]
- Appendix A13.4 Junction 10 Outputs.pdf [PDF]
- Appendix A13.5 Responses to Traffic and Transport Questions.pdf [PDF]
- Appendix A14.1 Climate (Greenhouse Gas Assessment).pdf [PDF]
- Appendix A14.2 Baseline Ambient Air Quality Report 2022.pdf [PDF]
- Appendix A14.3_Response to Air Quality and Odour Questions.pdf [PDF]
- Appendix A15.1 Detailed Baseline Noise Monitoring Report.pdf [PDF]
- Appendix A15.2 Connolly Hospital Baseline Vibration Monitoring.pdf [PDF]
- Appendix A15.3 Response to Noise and Vibration Questions.pdf [PDF]
- Appendix A18.1 Response to Soils and Geology Questions.pdf [PDF]
- Appendix A23.1 Cumulative Impact Assessment Tables.pdf [PDF]
- Appendix A6.1 Residential Settlements.pdf [PDF]
- Appendix A6.2 Relevant Local Area Plans.pdf [PDF]
- Appendix A7.1 Response to Human Health Questions.pdf [PDF]
- Appendix A8.1 Response to Marine Water Quality Questions.pdf [PDF]
- Appendix A9.1 Marine Habitat Assessment Survey.pdf [PDF]
- Appendix A9.2 Ireland's Eye Sublittoral Biotope Survey Report.pdf [PDF]
- Appendix A9.3 Written Responses to Biodiveristy (Marine) Queries.pdf [PDF]
- Volume 3A Part B Cover, Preface and Contents.pdf [PDF]
- Volume 4A Part A
- Volume 4A Part B
- Appendix 10A Odour Contours.pdf [PDF]
- Appendix 14A Photomontages.pdf [PDF]
- Appendix 17A Outlline CEMP Addendum.pdf [PDF]
- Appendix 3A Receptors List.pdf [PDF]
- Appendix 6B RBSF Terrestrial Baseline Report.pdf [PDF]
- Appendix 8A Ambient Air Quality Standards.pdf [PDF]
- Appendix 8C Greenhouse Gas Assessment.pdf [PDF]
- Volume 4A Part B Cover and Contents.pdf [PDF]
- Volume 5A
- Figure 12.1 WwTP Landscape Mitigation Plan.pdf [PDF]
- Figure 12.2 Abbotstown Pumping Station Landscape Mitigation Plan.pdf [PDF]
- Figure 16.1 Proposed Project (Blanchardstown) Showing Surrounding Sites.pdf [PDF]
- Figure 16.2 Proposed Project (M50 Junction 5) Showing Surrounding Sites.pdf [PDF]
- Figure 16.3 Proposed Project (Silloge) Showing Surrounding Sites.pdf [PDF]
- Figure 16.4 Proposed Project (Clonshagh) Showing Surrounding Sites.pdf [PDF]
- Figure 16.5 Proposed Project (St Doolaghs) Showing Surrounding Sites.pdf [PDF]
- Figure 16.6 Proposed Project (Baldoyle Estuary) Showing Surrounding Sites.pdf [PDF]
- Figure 20.1 Location of Active Waste Facilities in the Study Area.pdf [PDF]
- Figure 21.1 Quarry Locations.pdf [PDF]
- Figure 23.1 Other Developments Considered - Study Area Overview.pdf [PDF]
- Figure 23.2 Other Developments Considered (Sheet 1 to 38).pdf [PDF]
- Figure 4.1 Zonal Arrangement at the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 6.1 Residential Buildings within the Proposed Project Study Area.pdf [PDF]
- Figure 6.2 Economic Activity within the Proposed Project Study Area.pdf [PDF]
- Figure 6.3 Commercial Clusters within the Proposed Project Study Area.pdf [PDF]
- Figure 6.4 Healthcare Facilities within the Proposed Project Study Area.pdf [PDF]
- Figure 6.5 Primary Schools within the Proposed Project Study Area.pdf [PDF]
- Figure 6.6 Tourism, Public Amenities, Sporting and Community.pdf [PDF]
- Volume 5A Cover and Contents.pdf [PDF]
- Volume 6A
- Natura Impact Statement
- EIAR Addendum
- Planning Documents
- Addendum_Planning_Report.pdf [PDF]
- GDD Addendum Engineering Design Report.pdf [PDF]
- GDD Addendum Outline CEMP Appendix 1 Addendum Planning Drawing Register.pdf [PDF]
- GDD Addendum Outline CEMP Appendix 2 Addendum SWMP.pdf [PDF]
- GDD Addendum Outline CEMP.pdf [PDF]
- GDD Revised Flood Risk Assessment Report.pdf [PDF]
- Planning Drawings
- 32102902-2120_Regional WwTP Plan ASP Option (Round).pdf [PDF]
- 32102902-2121_Regional WwTP Plan ASP Option (1 of 6).pdf [PDF]
- 32102902-2122_Regional WwTP Plan ASP Option (2 of 6).pdf [PDF]
- 32102902-2123_Regional WwTP Plan ASP Option (3 of 6).pdf [PDF]
- 32102902-2124_Regional WwTP Plan ASP Option (4 of 6).pdf [PDF]
- 32102902-2125_Regional WwTP Plan ASP Option (5 of 6).pdf [PDF]
- 32102902-2126_Regional WwTP Plan ASP Option (6 of 6).pdf [PDF]
- 32102902-2127_Regional WwTP Elevations ASP Option-Elevation (Sheet 1 of 8).pdf [PDF]
- 32102902-2128_Regional WwTP Elevations ASP Option-Elevation (Sheet 2 of 8).pdf [PDF]
- 32102902-2129_Regional WwTP Elevations ASP Option-Elevation (Sheet 3 of 8).pdf [PDF]
- 32102902-2130_Regional WwTP Elevations ASP Option-Elevation (Sheet 4 of 8).pdf [PDF]
- 32102902-2131_Regional WwTP Elevations ASP Option-Elevation (Sheet 5 of 8).pdf [PDF]
- 32102902-2132_Regional WwTP Elevations ASP Option-Elevation (Sheet 6 of 8).pdf [PDF]
- 32102902-2133_Regional WwTP Elevations ASP Option-Elevation (Sheet 7 of 8).pdf [PDF]
- 32102902-2134_Regional WwTP Elevations ASP Option-Elevation (Sheet 8 of 8).pdf [PDF]
- 32102902-2135_Regional WwTP Sections ASP Option- Sectional Elevation Cut (Sheet 1 of 3).pdf [PDF]
- 32102902-2136_Regional WwTP Sections ASP Option- Sectional Elevation Cut (Sheet 2 of 3).pdf [PDF]
- 32102902-2137_Regional WwTP Sections ASP Option- Sectional Elevation Cut (Sheet 3 of 3).pdf [PDF]
- 32102902-2148_Proposed Culvert at Mayne River Crossing - WwTP Access Road (Sheet 1 of 2).pdf [PDF]
- 32102902-2149_Proposed Culvert at Mayne River Crossing - WwTP Access Road (Sheet 2 of 2).pdf [PDF]
- GDD Addendum Planning Drawings Cover and Contents.pdf [PDF]
- RBSF Addendum Engineering Design Report.pdf [PDF]
- RBSF Addendum Flood Risk Assessment.pdf [PDF]
- WFD Assessment.pdf [PDF]
- Remittal Application File Structure.xlsx [XLSX]
- ABP-312131-21 -Letter to ABP-27.02.23.pdf [PDF]
- ABP-312131-21 Applicants response received 20.01.2025.pdf [PDF]
- Figure 9.6 Maximum Suspended Sediment Plume Concentrations arising from dredging over the duration of the dredging works for the proposed outfall pipeline route.pdf [PDF]
- Request for extension - 27.02.23.pdf [PDF]
- SABP-312131-21 - Letter from applicant seeking extension of time to respond to FI, including response to submissions dated 27.02.23.pdf [PDF]
- Commission Documents
- 03.10.2024 - email to agent enclosing letter dated 03.10.24 - last date for submissions 17.10.24.pdf [PDF]
- 03.10.24 - Email to Stephanie McGlynn acknowledging change in correspondence - ABP-312131-21.pdf [PDF]
- 03.10.24 - Letter issued to applicant giving opportunity to comment on both sets of submissions, response by 17.10.24 - ABP-312131-21.pdf [PDF]
- 04.04.25 EPA letter requesting comments LD 15.05.25.pdf [PDF]
- 04.04.25 Specialist Report.pdf [PDF]
- 04.04.25-Inspector's Assessment.pdf [PDF]
- 13.03.25 - Response letter to EPA.pdf [PDF]
- 13.12.24 - ABP-312131-21 - Letter to Commission for Railway Regulation inviting them to make a sub on significant Further Information.pdf [PDF]
- 19.06.24 - Memo.pdf [PDF]
- 19.12.24 - Ack letter to Commission for railway regulation.pdf [PDF]
- 20.01.25 - Applicant respons to CRR Submission received.pdf [PDF]
- 20.12.24 - Letter to Irish Water encl sub received from Commission for railway Regulations, requesting comments.pdf [PDF]
- 21.05.24 - ack letter issued to Irish Water (Jacobs) re submission - ABP-312131-21.pdf [PDF]
- 23.10.24 - ABP-312131-21 - Ack letter to applicant for response to submissions.pdf [PDF]
- 23.10.24 - Letter to Fingal CC enclosing Irish water's response to submissions.pdf [PDF]
- 24.06.24 - Letter issued to Sean Lyons with refund - ABP-312131-21.pdf [PDF]
- 25.07.24 - Letter to applicant enclosing submisison for info only.pdf [PDF]
- 25.09.24 - Letter to Irish Water re case update and correspondence - ABP-312131-21.pdf [PDF]
- 27.09.24 - Email from Inspector giving instructions on case.pdf [PDF]
- 27.09.24 - Invitation to agent to make submission on obervations - ABP-312131-21.pdf [PDF]
- ABP-312131-21 - ABP response to extension request. 28.02.23 - Letter and email.pdf [PDF]
- ABP-312131-21 - ack letter to Uisce Eireann 2.11.23.pdf [PDF]
- ABP-312131-21 - FI letter issued to all parties for info only.pdf [PDF]
- ABP-312131-21 - Invalid letter to observer
- ABP-312131-21 - JR judgement letter issued to parties for comment.pdf [PDF]
- ABP-312131-21 - Letter from Irish Water dated 29th June 2022.pdf [PDF]
- ABP-312131-21 - letter to applicant enclosing copies of submissions for info only - 18-07-24.pdf [PDF]
- ABP-312131-21 - Letter to applicant enclosing submissions for info only.pdf [PDF]
- ABP-312131-21 - Letter to Irish Water re additional subs - 02.04.24.pdf [PDF]
- ABP-312131-21 - Letter to Jacobs Eng Ire Ltd (Agent for Irish Water) dated 26.08.22.pdf [PDF]
- ABP-312131-21 - letters circulates to parties for info only - 07.03.24.pdf [PDF]
- ABP-312131-21- Email to applicant.pdf [PDF]
- ABP-312131-21- Invalid letter to observer.pdf [PDF]
- ABP-312131-212 - Letter issued to Jacobs re provisions of section 37(f) - 07.03.24.pdf [PDF]
- ABP-312131-22 - letter to applicant enclosing submissions.pdf [PDF]
- ABP-312131-23 - ack letter re letter recieved 22.11.23.pdf [PDF]
- ABP=312131-21 - Letter to Irish Water requesting information - 26.08.22.pdf [PDF]
- Case Documents
- 01.11.24 - Applicant Response.pdf [PDF]
- 02.04.24 - LLetter to applicant.pdf [PDF]
- 03.10.24 - Email from applicant.pdf [PDF]
- 03.10.24 - Letter and Email to applicant.pdf [PDF]
- 11.07.24 - Direction.pdf [PDF]
- 12.11.24 - Memo.pdf [PDF]
- 13.03.25 - Response letter to EPA.pdf [PDF]
- 13.12.24 - Lettet to CRR.pdf [PDF]
- 15.11.22 - Memorandum.pdf [PDF]
- 18.03.25 - EPA email.pdf [PDF]
- 18.12.24 - CRR Submission.pdf [PDF]
- 20.01.25 - Applicant response to Commission For Railway Regulation.pdf [PDF]
- 20.12.24 - Letter to applicant enclosing sub from CRR.pdf [PDF]
- 22.02.24 - Direction.pdf [PDF]
- 22.11.22 - Direction.pdf [PDF]
- 25.09.24 - Letter to applicant.pdf [PDF]
- 26.09.24 - Applicant correspondence.pdf [PDF]
- 26.09.24 - Email from applicant.pdf [PDF]
- 27.02.25 - Email from EPA agreeing with request for extension of time to submit observations.pdf [PDF]
- 27.02.25 - Ext of time agreement EPA.pdf [PDF]
- 28.03.24 - Response from Applicant.pdf [PDF]
- 31.01.24 - Memorandum.pdf [PDF]
- ABP-312131-21-Submission from EPA.pdf [PDF]
- download.png [PNG]
- email from Inspector to ADP enclosing memo dated 02.10.24 and EIAR contents.pdf [PDF]
- Community Benefits Scheme.pdf [PDF]
- Environmental Documentation
- EIAR
- Volume 1 Non-Technical Summary
- Volume 2 Part A Introduction
- Volume 2 Part B Appendices
- Appendix A2.1 Summary of Stakeholder Responses (2013).pdf [PDF]
- Appendix A2.2 Summary of Stakeholder Responses (2018).pdf [PDF]
- Appendix A3.1 Assessment of Domestic and Non-Domestic Load.pdf [PDF]
- Appendix A4.1 Key Wastewater Treatment Standards Report.pdf [PDF]
- Appendix A4.2 Engineering Specialist Report for Crossings.pdf [PDF]
- Appendix A5.1 Assessment of Potential for Reuse of Treated Wastewater.pdf [PDF]
- Volume 2 Part B Appendices Cover and Contents.pdf [PDF]
- Volume 3 Part A GDD EIAR
- Chapter 10 Biodiversity (Ornithology).pdf [PDF]
- Chapter 11 Biodiversity (Terrestrial and Freshwater Aquatic).pdf [PDF]
- Chapter 12 Landscape and Visual.pdf [PDF]
- Chapter 13 Traffic and Transport.pdf [PDF]
- Chapter 14 Air Quality, Odour and Climate.pdf [PDF]
- Chapter 15 Noise and Vibration.pdf [PDF]
- Chapter 16 Archaeological, Architectural and Cultural Heritage.pdf [PDF]
- Chapter 17 Hydrology and Hydrogeology.pdf [PDF]
- Chapter 18 Soils and Geology.pdf [PDF]
- Chapter 19 Agronomy.pdf [PDF]
- Chapter 20 Waste.pdf [PDF]
- Chapter 21 Material Assets.pdf [PDF]
- Chapter 22 Risk of Major Accidents and or Disasters.pdf [PDF]
- Chapter 23 Cumulative Impacts and Environmental Interactions.pdf [PDF]
- Chapter 24 Summary of Mitigation Measures.pdf [PDF]
- Chapter 25 Summary of Residual Impacts.pdf [PDF]
- Chapter 6 Population.pdf [PDF]
- Chapter 7 Human Health.pdf [PDF]
- Chapter 8 Marine Water Quality.pdf [PDF]
- Chapter 9 Biodiversity (Marine).pdf [PDF]
- Volume 3 Part A Cover, Contents, Preface and Glossary.pdf [PDF]
- Volume 3 Part B Appendices
- Appendix A10.1 Estuarine Ornithological Surveys.pdf [PDF]
- Appendix A10.2 Vessel Management Plan.pdf [PDF]
- Appendix A11.1 Bat Survey and Assessment 2017.pdf [PDF]
- Appendix A11.2 Botanical Survey at Portmarnock.pdf [PDF]
- Appendix A11.3 Ecological Survey for Smooth Newt.pdf [PDF]
- Appendix A13.1 Scoping Documentation.pdf [PDF]
- Appendix A13.2 Traffic Calculations.pdf [PDF]
- Appendix A13.3 Construction Programme.pdf [PDF]
- Appendix A13.4 Count Data.pdf [PDF]
- Appendix A13.5 Junction 9 Outputs.pdf [PDF]
- Appendix A13.6 Road Safety Audit.pdf [PDF]
- Appendix A14.1 Construction Dust Assessment.pdf [PDF]
- Appendix A14.2 Baseline Ambient Air Quality Report 2017.pdf [PDF]
- Appendix A14.3 Baseline Ambient Air Quality Report 2016.pdf [PDF]
- Appendix A14.4 Estimation of Emission Rates from the Proposed Abbotstown Pumping Station and Wastewater Treatment Plant.pdf [PDF]
- Appendix A14.5 Detailed Dispersion Modelling Predictions.pdf [PDF]
- Appendix A14.6 Mitigation Measures and Abatement Options.pdf [PDF]
- Appendix A15.1 Glossary of Noise Terms.pdf [PDF]
- Appendix A15.2 Detailed Baseline Noise Monitoring Report.pdf [PDF]
- Appendix A15.3 Connolly Hospital Baseline Vibration Monitoring Results.pdf [PDF]
- Appendix A15.4 Assumed Activity for the Proposed Wastewater Treatment Plant Operational Phase.pdf [PDF]
- Appendix A16.1 Recorded Archaeological Heritage Sites Within the Receiving Environment.pdf [PDF]
- Appendix A16.10 Archaeological Testing Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.11 Intertidal Archaeological Survey Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.12 Marine Archaeological Geophysical Survey Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.13 Marine Archaeological Dive Survey Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.2 Recorded Shipwrecks Within the Receiving Environment.pdf [PDF]
- Appendix A16.3 Stray Archaeological Finds Recorded Within the Receiving Environment.pdf [PDF]
- Appendix A16.4 Recorded Built Heritage Sites Within the Receiving Environment.pdf [PDF]
- Appendix A16.5 Areas of Archaeological Potential Identified Within the Receiving Environment.pdf [PDF]
- Appendix A16.6 Designed Landscapes Located Within the Receiving Environment.pdf [PDF]
- Appendix A16.7 Unrecorded Built Heritage Sites Identified Within the Receiving Environment.pdf [PDF]
- Appendix A16.8 Townland Boundaries to be Crossed by the Proposed Project.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part A.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part B.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part C.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part D.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part E.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part F.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part G.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part H.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part I.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part J.pdf [PDF]
- Appendix A17.1 Flood Risk Assessment Report.pdf [PDF]
- Appendix A17.2 Groundwater Well Survey Questionnaire Summary.pdf [PDF]
- Appendix A17.3 Site Investigation Borehole Locations and Report.pdf [PDF]
- Appendix A17.4 Groundwater Quality Analyses Results.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part A.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part B.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part C.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part D.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part E.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part F.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part G.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part H.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part I.pdf [PDF]
- Appendix A18.2 Ground Investigation Location Drawings.pdf [PDF]
- Appendix A19.1 Landowner Impact Assessment Table.pdf [PDF]
- Appendix A6.1 Residential Settlements within the Proposed Project Study Area.pdf [PDF]
- Appendix A6.2 Relevant Local Area Plans.pdf [PDF]
- Appendix A8.1 Model Development and Calibration.pdf [PDF]
- Appendix A9.1 Marine Ecology Reports.pdf [PDF]
- Appendix A9.2 Marine Mammal Survey Investigation.pdf [PDF]
- Appendix A9.3 Underwater Noise Assessment and Modelling.pdf [PDF]
- Volume 3 Part B Cover and Contents.pdf [PDF]
- Volume 4 Part A RBSF EIAR
- Volume 4 Part B Appendices
- Volume 5 Part A GDD Figures
- Figure 10.1 Location and Extent of Marine, Coastal and Estuarine Ornithological Surveys.pdf [PDF]
- Figure 10.2 Bird Distribution within 90 m of Construction Compound No. 9 (December 2014 to March 2018).pdf [PDF]
- Figure 10.3 Bird Distribution within 90 m of Construction Compound No.10 (December 2014 to March 2018).pdf [PDF]
- Figure 10.7 Distribution of Non-Feeding Razorbill Records.pdf [PDF]
- Figure 11.1 Special Areas of Conservation.pdf [PDF]
- Figure 11.3 Natural Heritage Areas.pdf [PDF]
- Figure 11.4 Dublin Bay UNESCO Biosphere Reserve.pdf [PDF]
- Figure 11.5 Habitat Survey Results (1 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (2 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (3 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (4 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (5 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (6 of 6).pdf [PDF]
- Figure 11.7 Freshwater Sampling Locations.pdf [PDF]
- Figure 12.1 Landscape and Visual Impact Assesment Study Area.pdf [PDF]
- Figure 12.2 Zone of Theoretical Visibility for the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 12.3 Viewpoint Locations Map.pdf [PDF]
- Figure 12.4 Landscape and Visual Mitigation Concept.pdf [PDF]
- Figure 12.5 Proposed Wastewater Treatment Plant Landscape Mitigation Plan.pdf [PDF]
- Figure 12.6 Proposed Abbotstown Pumping Station.pdf [PDF]
- Figure 13.1 Traffic Assessment Locations.pdf [PDF]
- Figure 13.3 Proposed Left-Turn Site Access Junction on R139 Road.pdf [PDF]
- Figure 13.4 Proposed Left-Turn Site Exit on Clonshaugh Road.pdf [PDF]
- Figure 13.5 Autotrack Analysis – Max Regualted Articulated Vehicle.pdf [PDF]
- Figure 14.1 Study Area for the Construction Phase Air Quality Impact Assessment (1 of 2).pdf [PDF]
- Figure 14.1 Study Area for the Construction Phase Air Quality Impact Assessment (2 of 2).pdf [PDF]
- Figure 14.2 Study Area for the Operational Phase of the Air Quality Impact Assessment.pdf [PDF]
- Figure 14.3 Air Quality Monitoring Locations (1 of 3).pdf [PDF]
- Figure 14.3 Air Quality Monitoring Locations (2 of 3).pdf [PDF]
- Figure 14.3 Air Quality Monitoring Locations (3 of 3).pdf [PDF]
- Figure 14.4 Receptor Locations (1 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (2 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (3 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (4 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (5 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (6 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (7 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (8 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (9 of 9).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (1 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (2 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (3 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (4 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (5 of 5).pdf [PDF]
- Figure 15.2 Vibration Monitoring Locations at Connolly Hospital.pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (1 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (2 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (3 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (4 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (5 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (6 of 6).pdf [PDF]
- Figure 15.4 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Daytime).pdf [PDF]
- Figure 15.5 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Evening Time).pdf [PDF]
- Figure 15.6 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Night-time).pdf [PDF]
- Figure 15.7 Calculated Noise Contours for the Proposed Abbotstown Pumping Station Operational Phase.pdf [PDF]
- Figure 15.8 Calculated Noise Contours for the Proposed Dubber Odour Control Unit Operational Phase.pdf [PDF]
- Figure 16.1 Proposed Project (Blanchardstown) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.2 Proposed Project (M50 Junction 5)Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.3 Proposed Project (Silloge) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.4 Proposed Project (Clonshagh) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.5 Proposed Project (St Doolaghs) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.6 Proposed Project (Baldoyle Estuary Nature Reserve) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 17.1 Proposed Project Overview.pdf [PDF]
- Figure 17.10 Proposed Watercourse Crossings.pdf [PDF]
- Figure 17.11 Location of Site Investigation Boreholes at Clonshagh.pdf [PDF]
- Figure 17.12 Location of Site Investigation Boreholes.pdf [PDF]
- Figure 17.2 Groundwater Supply Well.pdf [PDF]
- Figure 17.3 Hydrological Study Area.pdf [PDF]
- Figure 17.4 Bedrock Geology.pdf [PDF]
- Figure 17.5 Aquifer Classification.pdf [PDF]
- Figure 17.6 Groundwater Vulnerability.pdf [PDF]
- Figure 17.7 Soils.pdf [PDF]
- Figure 17.8 Groundwater Supply Wells.pdf [PDF]
- Figure 17.9 Portmarnock Golf Club Irrigation Wells and Flow Regime.pdf [PDF]
- Figure 18.1 Teagasc Subsoils Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.1 Teagasc Subsoils Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.1 Teagasc Subsoils Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 18.2 Bedrock Geology Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.2 Bedrock Geology Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.2 Bedrock Geology Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 18.3 Route Constraints Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.3 Route Constraints Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.3 Route Constraints Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 18.4 Site Investigation Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.4 Site Investigation Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.4 Site Investigation Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (1 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (2 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (3 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (4 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (5 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (6 of 6).pdf [PDF]
- Figure 23.1 Other Developments Considered.pdf [PDF]
- Figure 3.1 Contributing Catchments of Existing Wastewater Treatment Plants.pdf [PDF]
- Figure 3.2 Critical Catchments.pdf [PDF]
- Figure 3.3 Potential Secondary Catchments.pdf [PDF]
- Figure 4.1 Proposed Project Overview.pdf [PDF]
- Figure 4.2 Designated Areas in the Vicinity of the Proposed Project.pdf [PDF]
- Figure 4.3 Proposed Wastewater Treatment Plant Site.pdf [PDF]
- Figure 4.4 Land Use Zoning Objectives at the Proposed Wastewater Treatment Plant Site.pdf [PDF]
- Figure 4.5 Zonal Arrangement of the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 4.6 Typical Detail of the Proposed Pipeline Route Construction Corridor.pdf [PDF]
- Figure 4.7 Typical Arrangement for Proposed Microtunnelling Compound.pdf [PDF]
- Figure 4.8 Typical Cross Section of the Proposed Pipeline Route Trench Dredged in the Seabed.pdf [PDF]
- Figure 6.1 Study Area for the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 6.10 Tourism, Public Amenities, Sporting and Community Infrastructure.pdf [PDF]
- Figure 6.2 Study Area for Proposed Orbital Sewer Route, Outfall Pipeline Route and Abbotstown Pumping Station.pdf [PDF]
- Figure 6.3 Residential Buildings within the Proposed Project Study Area.pdf [PDF]
- Figure 6.4 Land Use Zonings within the Proposed Project Study Area.pdf [PDF]
- Figure 6.5 Residential Zoned Lands within the Proposed Project Study Area.pdf [PDF]
- Figure 6.6 Economic Activity within the Proposed Project Study Area.pdf [PDF]
- Figure 6.7 Commercial Clusters within the Proposed Project Study Area.pdf [PDF]
- Figure 6.8 Healthcare Facilities within the Proposed Project Study Area.pdf [PDF]
- Figure 6.9 Primary and Secondary Level Schools within the Proposed Project Study Area.pdf [PDF]
- Figure 8.1 Coastal and Transitional Waterbodies.pdf [PDF]
- Figure 8.10 Marine Sampling Stations.pdf [PDF]
- Figure 8.11 Ecological Status.pdf [PDF]
- Figure 8.12 Quality of Bathing Waters.pdf [PDF]
- Figure 8.13 Trophic Status.pdf [PDF]
- Figure 8.2 Designated Areas.pdf [PDF]
- Figure 8.3 Model mesh and Bathymetry.pdf [PDF]
- Figure 8.4 High Resolution Mesh.pdf [PDF]
- Figure 8.5 Calibration Locations.pdf [PDF]
- Figure 8.6 Vibrocore and Borehole Locations.pdf [PDF]
- Figure 8.7 Modelled Rivers and Hydrometric Stations.pdf [PDF]
- Figure 8.8 Wastewater Treatment Plant Outfall Locations.pdf [PDF]
- Figure 8.9 Modelled Rivers and Quality Stations.pdf [PDF]
- Figure 9.1 Summary of Field Survey Operations for the Proposed Outfall Pipeline Route.pdf [PDF]
- Figure 9.2 Summary of Bathymetry Data for the Proposed Outfall Pipeline Route.pdf [PDF]
- Figure 9.3 Sediment Changes near the Proposed Outfall Pipeline Route and Diffuser Location.pdf [PDF]
- Figure 9.4 Casual Sightings and Dedicated Surveys of the Harbour Porpoise.pdf [PDF]
- Figure 9.5 Inshore Shelfish Grounds along the Fingal Coast.pdf [PDF]
- Volume 5 Part A Cover and Contents.pdf [PDF]
- Volume 5 Part B RBSF Figures
- Volume 5 Part B Cover and Contents.pdf [PDF]
- Y17702-PL-001 - General Site Location Plan.pdf [PDF]
- Y17702-PL-002 - Site Location Map.pdf [PDF]
- Y17702-PL-003 - Existing Site Layout.pdf [PDF]
- Y17702-PL-004 - Proposed Site Layout.pdf [PDF]
- Y17702-PL-005 - Existing Buildings to be Demolished - Elevations and Plans.Pdf [PDF]
- Y17702-PL-006 - Proposed Ancillary Buildings.pdf [PDF]
- Y17702-PL-007 - Storage Building A - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-008 - Storage Building A - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-009 - Storage Building B - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-010 - Storage Building B - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-011 - Landscape Layout.pdf [PDF]
- Y17702-PL-012 - Contiguous Elevations.pdf [PDF]
- Y17702-PL-013 - Proposed Road Layout and Markings.pdf [PDF]
- Y17702-PL-014 - Junction Layout, Lamp Standard and Typical Road Details.pdf [PDF]
- Y17702-PL-015 - Surface Water Drainage Layout.pdf [PDF]
- Y17702-PL-016 - Surface Water Drainage - Typical Details.pdf [PDF]
- Y17702-PL-017 - Foul Drainage Layout.pdf [PDF]
- Y17702-PL-018 - Existing Foul Pumping Station - Plans and Section.pdf [PDF]
- Y17702-PL-019 - Manhole, Trench Backfill And Bedding - Typical Details.pdf [PDF]
- Y17702-PL-020 - Watermain Layout.pdf [PDF]
- Y17702-PL-021 - Watermain Typical Details.pdf [PDF]
- Y17702-PL-022 - Odour Control Unit - Plan and Elevation.pdf [PDF]
- Y17702-PL-023 - Electricity and External Lighting Layout.pdf [PDF]
- Y17702-PL-024 - Site Development Details.pdf [PDF]
- Y17702-PL-025 - Weighbridge Details and ME Control Building.pdf [PDF]
- Y17702-PL-026 - Construction and Permanent Information Sign.pdf [PDF]
- Y17702-PL-027 - Proposed Site Layout Overlaid with Services.pdf [PDF]
- Volume 6 Photomontages
- Viewpoint 1.pdf [PDF]
- Viewpoint 10.pdf [PDF]
- Viewpoint 11.pdf [PDF]
- Viewpoint 12.pdf [PDF]
- Viewpoint 13.pdf [PDF]
- Viewpoint 14.pdf [PDF]
- Viewpoint 2.pdf [PDF]
- Viewpoint 3.pdf [PDF]
- Viewpoint 4.pdf [PDF]
- Viewpoint 5.pdf [PDF]
- Viewpoint 6.pdf [PDF]
- Viewpoint 7.pdf [PDF]
- Viewpoint 8.pdf [PDF]
- Viewpoint 9.pdf [PDF]
- Volume 6 Cover and Contents.pdf [PDF]
- Natura Impact Statement
- EIAR
- GDD CEMP
- GDD Outline CEMP Appendix 1 Planning Drawings Register.pdf [PDF]
- GDD Outline CEMP Appendix 2 Appendix A Part 1.pdf [PDF]
- GDD Outline CEMP Appendix 2 Appendix A Part 2 301908.pdf [PDF]
- GDD Outline CEMP Appendix 2 Outline Traffic Management Plan.pdf [PDF]
- GDD Outline CEMP Appendix 3 Surface Water Management Plan.pdf [PDF]
- GDD Outline Construction Environmental Management Plan.pdf [PDF]
- GDD Cover Page and Drawing Index.pdf [PDF]
- GDD Engineering Design Report.pdf [PDF]
- GDD Flood Risk Assessment.pdf [PDF]
- GDD Planning Drawings
- 32102902-2000_P01 Overall Project Context Map.pdf [PDF]
- 32102902-2001_P01 Project Route Map - Sheet 1 of 14.pdf [PDF]
- 32102902-2002_P01 Project Route Map - Sheet 2 of 14.pdf [PDF]
- 32102902-2003_P01 Project Route Map - Sheet 3 of 14.pdf [PDF]
- 32102902-2004_P01 Project Route Map - Sheet 4 of 14.pdf [PDF]
- 32102902-2005_P01 Project Route Map - Sheet 5 of 14.pdf [PDF]
- 32102902-2006_P01 Project Route Map - Sheet 6 of 14.pdf [PDF]
- 32102902-2007_P01 Project Route Map - Sheet 7 of 14.pdf [PDF]
- 32102902-2008_P01 Project Route Map - Sheet 8 of 14.pdf [PDF]
- 32102902-2009_P01 Project Route Map - Sheet 9 of 14.pdf [PDF]
- 32102902-2010_P01 Project Route Map - Sheet 10 of 14.pdf [PDF]
- 32102902-2011_P01 Project Route Map - Sheet 11 of 14.pdf [PDF]
- 32102902-2012_P01 Project Route Map - Sheet 12 of 14.pdf [PDF]
- 32102902-2013_P01 Project Route Map - Sheet 13 of 14.pdf [PDF]
- 32102902-2014_P01 Project Route Map - Sheet 14 of 14.pdf [PDF]
- 32102902-2100_P01 Proposed Orbiral Sewer Route - Sheet 1 of 4.pdf [PDF]
- 32102902-2101_P01 Proposed Orbiral Sewer Route - Sheet 2 of 4.pdf [PDF]
- 32102902-2102_P01 Proposed Orbiral Sewer Route - Sheet 3 of 4.pdf [PDF]
- 32102902-2103_P01 Proposed Orbiral Sewer Route - Sheet 4 of 4.pdf [PDF]
- 32102902-2104_P01 Proposed Outfall Pipeline Route (Land Based Section) - Sheet 1 of 2.pdf [PDF]
- 32102902-2105_P01 Proposed Outfall Pipeline Route (Land Based Section) - Sheet 2 of 2.pdf [PDF]
- 32102902-2106_P01 Proposed North Fringe Sewer Diversion.pdf [PDF]
- 32102902-2107_P01 Proposed Outfall Pipeline Route (Marine Section) - Sheet 1 of 2.pdf.pdf [PDF]
- 32102902-2108_P01 Proposed Outfall Pipeline Route (Marine Section) - Sheet 2 of 2.pdf [PDF]
- 32102902-2109_P01 Trenchless Crossing - N2 Road.pdf [PDF]
- 32102902-2110_P01 Trenchless Crossing - Old Airport Road.pdf [PDF]
- 32102902-2111_P01 Trenchless Crossing - M1 Motorway.pdf [PDF]
- 32102902-2112_P01 Trenchless Crossing - Dublin Belfast Railway.pdf [PDF]
- 32102902-2113_P01 Trenchless Crossing - Portmarnock Golf Course.pdf [PDF]
- 32102902-2119_P01 Regional WwTP Location Map.pdf [PDF]
- 32102902-2120_P01 Regional WwTP Indicative Plan ASP Option.pdf.pdf [PDF]
- 32102902-2121_P01 Regional WwTP Indicative Plan ASP Option (1 of 6).pdf.pdf [PDF]
- 32102902-2122_P01 Regional WwTP Indicative Plan ASP Option (2 of 6).pdf.pdf [PDF]
- 32102902-2123_P01 Regional WwTP Indicative Plan ASP Option (3 of 6).pdf.pdf [PDF]
- 32102902-2124_P01 Regional WwTP Indicative Plan ASP Option (4 of 6).pdf.pdf [PDF]
- 32102902-2125_P01 Regional WwTP Indicative Plan ASP Option (5 of 6).pdf.pdf [PDF]
- 32102902-2126_P01 Regional WwTP Indicative Plan ASP Option (6 of 6).pdf.pdf [PDF]
- 32102902-2127_P01 Regional WwTP Indicative Elevations ASP Option (1 of 8).pdf.pdf [PDF]
- 32102902-2128_P01 Regional WwTP Indicative Elevations ASP Option (2 of 8).pdf.pdf [PDF]
- 32102902-2129_P01 Regional WwTP Indicative Elevations ASP Option (3 of 8).pdf.pdf [PDF]
- 32102902-2130_P01 Regional WwTP Indicative Elevations ASP Option (4 of 8).pdf.pdf [PDF]
- 32102902-2131_P01 Regional WwTP Indicative Elevations ASP Option (5 of 8).pdf.pdf [PDF]
- 32102902-2132_P01 Regional WwTP Indicative Elevations ASP Option (6 of 8).pdf.pdf [PDF]
- 32102902-2133_P01 Regional WwTP Indicative Elevations ASP Option (7 of 8).pdf.pdf [PDF]
- 32102902-2134_P01 Regional WwTP Indicative Elevations ASP Option (8 of 8).pdf.pdf [PDF]
- 32102902-2135_P01 Regional WwTP Indicative Sections ASP Option Sectional Elevation - Cut (1 of 3).pdf.pdf [PDF]
- 32102902-2136_P01 Regional WwTP Indicative Sections ASP Option Sectional Elevation - Cut (2 of 3).pdf.pdf [PDF]
- 32102902-2137_P01 Regional WwTP Indicative Sections ASP Option Sectional Elevation - Cut (3 of 3).pdf.pdf [PDF]
- 32102902-2138_P01 Regional WwTP Indicative Plan SBR Option.pdf.pdf [PDF]
- 32102902-2139_P01 Regional WwTP Indicative Plan AGS Option.pdf.pdf [PDF]
- 32102902-2140_P01 Abbotstown Pumping Station - Existing Site Layout Plan.pdf [PDF]
- 32102902-2141_P01 Abbotstown Pumping Station - Proposed Site Layout Plan.pdf [PDF]
- 32102902-2142_P01 Abbotstown Pumping Station - Site Elevations.pdf [PDF]
- 32102902-2143_P01 Abbotstown Pumping Station - Site Sections.pdf [PDF]
- 32102902-2144_P01 Abbotstown Pumping Station - Building Details.pdf [PDF]
- 32102902-2145_P01 Abbotstown Pumping Station Proposed Site Layout Plan - Engineering Services.pdf [PDF]
- 32102902-2146_P01 Abbotstown Pumping Station Fire Safety Review.pdf [PDF]
- 32102902-2147_P01 Typical Details Odour Control Unit.pdf [PDF]
- 32102902-2148_P01 Proposed Culvert at Mayne River Crossing - WwTP Access Road (Sheet 1 of 2).pdf [PDF]
- 32102902-2149_P01 Proposed Culvert at Mayne River Crossing - WwTP Access Road (Sheet 2 of 2).pdf [PDF]
- 32102902-2200_P01 Typical Details Gravity Pipelines 1 of 2.pdf [PDF]
- 32102902-2201_P01 Typical Details Gravity Pipelines 2 of 2.pdf [PDF]
- 32102902-2202_P01 Typical Details Pressure Pipelines 1 of 3.pdf [PDF]
- 32102902-2203_P01 Typical Details Pressure Pipelines 2 of 3.pdf [PDF]
- 32102902-2204_P01 Typical Details Pressure Pipelines 3 of 3.pdf [PDF]
- 32102902-2206_P01 Tunnelling Compound Typical Arrangement.pdf [PDF]
- 32102902-2207_P01 Proposed Subsea Crossing Of Fibre Optic Cable.pdf [PDF]
- 32102902-2208_P01 Marine Rises And Diffuser System - Typical Details.pdf [PDF]
- GDD Cover Page and Drawing Index.pdf [PDF]
- Greater Dublin Drainage Strategy Overview and Future Strategic Needs.pdf [PDF]
- Location of Site Notices.pdf [PDF]
- PA Documents
- Public Stakeholder Participation Report.pdf [PDF]
- RBSF Architectural Design Report.pdf [PDF]
- RBSF Engineering Design Report.pdf [PDF]
- RBSF Flood Risk Assessment.pdf [PDF]
- RBSF Outline Construction Environmental Management Plan.pdf [PDF]
- RBSF Planning Drawings
- RBSF Drawing Schedule and Drawings.pdf [PDF]
- Y17702-PL-001 - General Site Location Plan.pdf [PDF]
- Y17702-PL-002 - Site Location Map.pdf [PDF]
- Y17702-PL-003 - Existing Site Layout.pdf [PDF]
- Y17702-PL-004 - Proposed Site Layout.pdf [PDF]
- Y17702-PL-005 - Existing Buildings to be Demolished - Elevations and Plans.Pdf [PDF]
- Y17702-PL-006-Proposed Ancillary Buildings -Elevations, Plans and Typical Cross Sections.pdf [PDF]
- Y17702-PL-007 - Storage Building A - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-008 - Storage Building A - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-009 - Storage Building B - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-010 - Storage Building B - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-011 - Landscape Layout.pdf [PDF]
- Y17702-PL-012 - Contiguous Elevations.pdf [PDF]
- Y17702-PL-013 - Proposed Road Layout and Markings.pdf [PDF]
- Y17702-PL-014 - Junction Layout, Lamp Standard and Typical Road Details.pdf [PDF]
- Y17702-PL-015 - Surface Water Drainage Layout.pdf [PDF]
- Y17702-PL-016 - Surface Water Drainage - Typical Details.pdf [PDF]
- Y17702-PL-017 - Foul Drainage Layout.pdf [PDF]
- Y17702-PL-018 - Existing Foul Pumping Station - Plans and Section.pdf [PDF]
- Y17702-PL-019 - Manhole, Trench Backfill And Bedding - Typical Details.pdf [PDF]
- Y17702-PL-020 - Watermain Layout.pdf [PDF]
- Y17702-PL-021 - Watermain Typical Details.pdf [PDF]
- Y17702-PL-022 - Odour Control Unit - Plan and Elevation.pdf [PDF]
- Y17702-PL-023 - Electricity and External Lighting Layout.pdf [PDF]
- Y17702-PL-024 - Site Development Details.pdf [PDF]
- Y17702-PL-025 - Weighbridge Details and ME Control Building.pdf [PDF]
- Y17702-PL-026 - Construction and Permanent Information Sign.pdf [PDF]
- Y17702-PL-027 - Proposed Site Layout Overlaid with Services.pdf [PDF]
- SID Planning Report.pdf [PDF]
- Statutory Documentation
- Appellant Third Party Docs
- View associated documents
-
The application is subject to an EIA procedure.
- View associated documents
- Cover Letter
- Environmental Documents
- EIAR Addendum
- Volume 1A
- Volume 2A Part A
- Chapter 1A Introduction.pdf [PDF]
- Chapter 2A The Environmental Impact Assessment Process.pdf [PDF]
- Chapter 3A The Need for the Proposed Project.pdf [PDF]
- Chapter 4A Description of the Proposed Project.pdf [PDF]
- Chapter 5A Consideration of Alternatives.pdf [PDF]
- Volume 2A Part A Cover, Preface, Content and Glossary.pdf [PDF]
- Volume 2A Part B
- Volume 3A Part A
- Chapter 10A Biodiversity (Marine Ornithology).pdf [PDF]
- Chapter 11A Biodiversity (Terrestrial and Freshwater Aquatic).pdf [PDF]
- Chapter 12A Landscape and Visual.pdf [PDF]
- Chapter 13A Traffic and Transport.pdf [PDF]
- Chapter 14A Air Quality, Odour and Climate.pdf [PDF]
- Chapter 15A Noise and Vibration.pdf [PDF]
- Chapter 16A Archaeological, Architectural and Cultural Heritage.pdf [PDF]
- Chapter 17A Hydrology and Hydrogeology.pdf [PDF]
- Chapter 18A Soils and Geology.pdf [PDF]
- Chapter 19A Agronomy.pdf [PDF]
- Chapter 20A Waste.pdf [PDF]
- Chapter 21A Material Assets.pdf [PDF]
- Chapter 22A Risk of Major Accidents and or Disasters.pdf [PDF]
- Chapter 23A Cumulative Impacts and Environmental Interactions.pdf [PDF]
- Chapter 24A Summary of Mitigation Measures.pdf [PDF]
- Chapter 25A Summary of Residual Impacts.pdf [PDF]
- Chapter 6A Population and Human Health_Population.pdf [PDF]
- Chapter 7A Population and Human Health_Human Health.pdf [PDF]
- Chapter 8A Marine Water Quality.pdf [PDF]
- Chapter 9A Biodiversity (Marine).pdf [PDF]
- Volume 3A Part A Cover, Preface, Content and Glossary.pdf [PDF]
- Volume 3A Part B
- Appendix A10.1 Ornithology (Marine) Baseline Survey Report.pdf [PDF]
- Appendix A10.2 Revised Vessel Management Plan.pdf [PDF]
- Appendix A10.3 Written Responses to Biodiversity (Ornithology).pdf [PDF]
- Appendix A11.1 Terrestrial Baseline Survey Report.pdf [PDF]
- Appendix A11.2 Terrestrial Ornithology Technical Report.pdf [PDF]
- Appendix A11.3 Response to Biodiversity (Terrestrial) Queries.pdf [PDF]
- Appendix A13.1 Traffic Calculations.pdf [PDF]
- Appendix A13.2 Count Data.pdf [PDF]
- Appendix A13.3 Updated Construction Programme.pdf [PDF]
- Appendix A13.4 Junction 10 Outputs.pdf [PDF]
- Appendix A13.5 Responses to Traffic and Transport Questions.pdf [PDF]
- Appendix A14.1 Climate (Greenhouse Gas Assessment).pdf [PDF]
- Appendix A14.2 Baseline Ambient Air Quality Report 2022.pdf [PDF]
- Appendix A14.3_Response to Air Quality and Odour Questions.pdf [PDF]
- Appendix A15.1 Detailed Baseline Noise Monitoring Report.pdf [PDF]
- Appendix A15.2 Connolly Hospital Baseline Vibration Monitoring.pdf [PDF]
- Appendix A15.3 Response to Noise and Vibration Questions.pdf [PDF]
- Appendix A18.1 Response to Soils and Geology Questions.pdf [PDF]
- Appendix A23.1 Cumulative Impact Assessment Tables.pdf [PDF]
- Appendix A6.1 Residential Settlements.pdf [PDF]
- Appendix A6.2 Relevant Local Area Plans.pdf [PDF]
- Appendix A7.1 Response to Human Health Questions.pdf [PDF]
- Appendix A8.1 Response to Marine Water Quality Questions.pdf [PDF]
- Appendix A9.1 Marine Habitat Assessment Survey.pdf [PDF]
- Appendix A9.2 Ireland's Eye Sublittoral Biotope Survey Report.pdf [PDF]
- Appendix A9.3 Written Responses to Biodiveristy (Marine) Queries.pdf [PDF]
- Volume 3A Part B Cover, Preface and Contents.pdf [PDF]
- Volume 4A Part A
- Volume 4A Part B
- Appendix 10A Odour Contours.pdf [PDF]
- Appendix 14A Photomontages.pdf [PDF]
- Appendix 17A Outlline CEMP Addendum.pdf [PDF]
- Appendix 3A Receptors List.pdf [PDF]
- Appendix 6B RBSF Terrestrial Baseline Report.pdf [PDF]
- Appendix 8A Ambient Air Quality Standards.pdf [PDF]
- Appendix 8C Greenhouse Gas Assessment.pdf [PDF]
- Volume 4A Part B Cover and Contents.pdf [PDF]
- Volume 5A
- Figure 12.1 WwTP Landscape Mitigation Plan.pdf [PDF]
- Figure 12.2 Abbotstown Pumping Station Landscape Mitigation Plan.pdf [PDF]
- Figure 16.1 Proposed Project (Blanchardstown) Showing Surrounding Sites.pdf [PDF]
- Figure 16.2 Proposed Project (M50 Junction 5) Showing Surrounding Sites.pdf [PDF]
- Figure 16.3 Proposed Project (Silloge) Showing Surrounding Sites.pdf [PDF]
- Figure 16.4 Proposed Project (Clonshagh) Showing Surrounding Sites.pdf [PDF]
- Figure 16.5 Proposed Project (St Doolaghs) Showing Surrounding Sites.pdf [PDF]
- Figure 16.6 Proposed Project (Baldoyle Estuary) Showing Surrounding Sites.pdf [PDF]
- Figure 20.1 Location of Active Waste Facilities in the Study Area.pdf [PDF]
- Figure 21.1 Quarry Locations.pdf [PDF]
- Figure 23.1 Other Developments Considered - Study Area Overview.pdf [PDF]
- Figure 23.2 Other Developments Considered (Sheet 1 to 38).pdf [PDF]
- Figure 4.1 Zonal Arrangement at the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 6.1 Residential Buildings within the Proposed Project Study Area.pdf [PDF]
- Figure 6.2 Economic Activity within the Proposed Project Study Area.pdf [PDF]
- Figure 6.3 Commercial Clusters within the Proposed Project Study Area.pdf [PDF]
- Figure 6.4 Healthcare Facilities within the Proposed Project Study Area.pdf [PDF]
- Figure 6.5 Primary Schools within the Proposed Project Study Area.pdf [PDF]
- Figure 6.6 Tourism, Public Amenities, Sporting and Community.pdf [PDF]
- Volume 5A Cover and Contents.pdf [PDF]
- Volume 6A
- Natura Impact Statement
- EIAR Addendum
- Planning Documents
- Addendum_Planning_Report.pdf [PDF]
- GDD Addendum Engineering Design Report.pdf [PDF]
- GDD Addendum Outline CEMP Appendix 1 Addendum Planning Drawing Register.pdf [PDF]
- GDD Addendum Outline CEMP Appendix 2 Addendum SWMP.pdf [PDF]
- GDD Addendum Outline CEMP.pdf [PDF]
- GDD Revised Flood Risk Assessment Report.pdf [PDF]
- Planning Drawings
- 32102902-2120_Regional WwTP Plan ASP Option (Round).pdf [PDF]
- 32102902-2121_Regional WwTP Plan ASP Option (1 of 6).pdf [PDF]
- 32102902-2122_Regional WwTP Plan ASP Option (2 of 6).pdf [PDF]
- 32102902-2123_Regional WwTP Plan ASP Option (3 of 6).pdf [PDF]
- 32102902-2124_Regional WwTP Plan ASP Option (4 of 6).pdf [PDF]
- 32102902-2125_Regional WwTP Plan ASP Option (5 of 6).pdf [PDF]
- 32102902-2126_Regional WwTP Plan ASP Option (6 of 6).pdf [PDF]
- 32102902-2127_Regional WwTP Elevations ASP Option-Elevation (Sheet 1 of 8).pdf [PDF]
- 32102902-2128_Regional WwTP Elevations ASP Option-Elevation (Sheet 2 of 8).pdf [PDF]
- 32102902-2129_Regional WwTP Elevations ASP Option-Elevation (Sheet 3 of 8).pdf [PDF]
- 32102902-2130_Regional WwTP Elevations ASP Option-Elevation (Sheet 4 of 8).pdf [PDF]
- 32102902-2131_Regional WwTP Elevations ASP Option-Elevation (Sheet 5 of 8).pdf [PDF]
- 32102902-2132_Regional WwTP Elevations ASP Option-Elevation (Sheet 6 of 8).pdf [PDF]
- 32102902-2133_Regional WwTP Elevations ASP Option-Elevation (Sheet 7 of 8).pdf [PDF]
- 32102902-2134_Regional WwTP Elevations ASP Option-Elevation (Sheet 8 of 8).pdf [PDF]
- 32102902-2135_Regional WwTP Sections ASP Option- Sectional Elevation Cut (Sheet 1 of 3).pdf [PDF]
- 32102902-2136_Regional WwTP Sections ASP Option- Sectional Elevation Cut (Sheet 2 of 3).pdf [PDF]
- 32102902-2137_Regional WwTP Sections ASP Option- Sectional Elevation Cut (Sheet 3 of 3).pdf [PDF]
- 32102902-2148_Proposed Culvert at Mayne River Crossing - WwTP Access Road (Sheet 1 of 2).pdf [PDF]
- 32102902-2149_Proposed Culvert at Mayne River Crossing - WwTP Access Road (Sheet 2 of 2).pdf [PDF]
- GDD Addendum Planning Drawings Cover and Contents.pdf [PDF]
- RBSF Addendum Engineering Design Report.pdf [PDF]
- RBSF Addendum Flood Risk Assessment.pdf [PDF]
- WFD Assessment.pdf [PDF]
- Volume 1 Non-Technical Summary
- Volume 2 Part A Introduction
- Volume 2 Part B Appendices
- Appendix A2.1 Summary of Stakeholder Responses (2013).pdf [PDF]
- Appendix A2.2 Summary of Stakeholder Responses (2018).pdf [PDF]
- Appendix A3.1 Assessment of Domestic and Non-Domestic Load.pdf [PDF]
- Appendix A4.1 Key Wastewater Treatment Standards Report.pdf [PDF]
- Appendix A4.2 Engineering Specialist Report for Crossings.pdf [PDF]
- Appendix A5.1 Assessment of Potential for Reuse of Treated Wastewater.pdf [PDF]
- Volume 2 Part B Appendices Cover and Contents.pdf [PDF]
- Volume 3 Part A GDD EIAR
- Chapter 10 Biodiversity (Ornithology).pdf [PDF]
- Chapter 11 Biodiversity (Terrestrial and Freshwater Aquatic).pdf [PDF]
- Chapter 12 Landscape and Visual.pdf [PDF]
- Chapter 13 Traffic and Transport.pdf [PDF]
- Chapter 14 Air Quality, Odour and Climate.pdf [PDF]
- Chapter 15 Noise and Vibration.pdf [PDF]
- Chapter 16 Archaeological, Architectural and Cultural Heritage.pdf [PDF]
- Chapter 17 Hydrology and Hydrogeology.pdf [PDF]
- Chapter 18 Soils and Geology.pdf [PDF]
- Chapter 19 Agronomy.pdf [PDF]
- Chapter 20 Waste.pdf [PDF]
- Chapter 21 Material Assets.pdf [PDF]
- Chapter 22 Risk of Major Accidents and or Disasters.pdf [PDF]
- Chapter 23 Cumulative Impacts and Environmental Interactions.pdf [PDF]
- Chapter 24 Summary of Mitigation Measures.pdf [PDF]
- Chapter 25 Summary of Residual Impacts.pdf [PDF]
- Chapter 6 Population.pdf [PDF]
- Chapter 7 Human Health.pdf [PDF]
- Chapter 8 Marine Water Quality.pdf [PDF]
- Chapter 9 Biodiversity (Marine).pdf [PDF]
- Volume 3 Part A Cover, Contents, Preface and Glossary.pdf [PDF]
- Volume 3 Part B Appendices
- Appendix A10.1 Estuarine Ornithological Surveys.pdf [PDF]
- Appendix A10.2 Vessel Management Plan.pdf [PDF]
- Appendix A11.1 Bat Survey and Assessment 2017.pdf [PDF]
- Appendix A11.2 Botanical Survey at Portmarnock.pdf [PDF]
- Appendix A11.3 Ecological Survey for Smooth Newt.pdf [PDF]
- Appendix A13.1 Scoping Documentation.pdf [PDF]
- Appendix A13.2 Traffic Calculations.pdf [PDF]
- Appendix A13.3 Construction Programme.pdf [PDF]
- Appendix A13.4 Count Data.pdf [PDF]
- Appendix A13.5 Junction 9 Outputs.pdf [PDF]
- Appendix A13.6 Road Safety Audit.pdf [PDF]
- Appendix A14.1 Construction Dust Assessment.pdf [PDF]
- Appendix A14.2 Baseline Ambient Air Quality Report 2017.pdf [PDF]
- Appendix A14.3 Baseline Ambient Air Quality Report 2016.pdf [PDF]
- Appendix A14.4 Estimation of Emission Rates from the Proposed Abbotstown Pumping Station and Wastewater Treatment Plant.pdf [PDF]
- Appendix A14.5 Detailed Dispersion Modelling Predictions.pdf [PDF]
- Appendix A14.6 Mitigation Measures and Abatement Options.pdf [PDF]
- Appendix A15.1 Glossary of Noise Terms.pdf [PDF]
- Appendix A15.2 Detailed Baseline Noise Monitoring Report.pdf [PDF]
- Appendix A15.3 Connolly Hospital Baseline Vibration Monitoring Results.pdf [PDF]
- Appendix A15.4 Assumed Activity for the Proposed Wastewater Treatment Plant Operational Phase.pdf [PDF]
- Appendix A16.1 Recorded Archaeological Heritage Sites Within the Receiving Environment.pdf [PDF]
- Appendix A16.10 Archaeological Testing Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.11 Intertidal Archaeological Survey Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.12 Marine Archaeological Geophysical Survey Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.13 Marine Archaeological Dive Survey Undertaken as Part of the Environmental Impact Assessment.pdf [PDF]
- Appendix A16.2 Recorded Shipwrecks Within the Receiving Environment.pdf [PDF]
- Appendix A16.3 Stray Archaeological Finds Recorded Within the Receiving Environment.pdf [PDF]
- Appendix A16.4 Recorded Built Heritage Sites Within the Receiving Environment.pdf [PDF]
- Appendix A16.5 Areas of Archaeological Potential Identified Within the Receiving Environment.pdf [PDF]
- Appendix A16.6 Designed Landscapes Located Within the Receiving Environment.pdf [PDF]
- Appendix A16.7 Unrecorded Built Heritage Sites Identified Within the Receiving Environment.pdf [PDF]
- Appendix A16.8 Townland Boundaries to be Crossed by the Proposed Project.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part A.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part B.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part C.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part D.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part E.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part F.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part G.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part H.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part I.pdf [PDF]
- Appendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part J.pdf [PDF]
- Appendix A17.1 Flood Risk Assessment Report.pdf [PDF]
- Appendix A17.2 Groundwater Well Survey Questionnaire Summary.pdf [PDF]
- Appendix A17.3 Site Investigation Borehole Locations and Report.pdf [PDF]
- Appendix A17.4 Groundwater Quality Analyses Results.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part A.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part B.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part C.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part D.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part E.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part F.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part G.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part H.pdf [PDF]
- Appendix A18.1 Ground Investigation Factual Reports Part I.pdf [PDF]
- Appendix A18.2 Ground Investigation Location Drawings.pdf [PDF]
- Appendix A19.1 Landowner Impact Assessment Table.pdf [PDF]
- Appendix A6.1 Residential Settlements within the Proposed Project Study Area.pdf [PDF]
- Appendix A6.2 Relevant Local Area Plans.pdf [PDF]
- Appendix A8.1 Model Development and Calibration.pdf [PDF]
- Appendix A9.1 Marine Ecology Reports.pdf [PDF]
- Appendix A9.2 Marine Mammal Survey Investigation.pdf [PDF]
- Appendix A9.3 Underwater Noise Assessment and Modelling.pdf [PDF]
- Volume 3 Part B Cover and Contents.pdf [PDF]
- Volume 4 Part A RBSF EIAR
- Volume 4 Part B Appendices
- Volume 5 Part A GDD Figures
- Figure 10.1 Location and Extent of Marine, Coastal and Estuarine Ornithological Surveys.pdf [PDF]
- Figure 10.2 Bird Distribution within 90 m of Construction Compound No. 9 (December 2014 to March 2018).pdf [PDF]
- Figure 10.3 Bird Distribution within 90 m of Construction Compound No.10 (December 2014 to March 2018).pdf [PDF]
- Figure 10.7 Distribution of Non-Feeding Razorbill Records.pdf [PDF]
- Figure 11.1 Special Areas of Conservation.pdf [PDF]
- Figure 11.3 Natural Heritage Areas.pdf [PDF]
- Figure 11.4 Dublin Bay UNESCO Biosphere Reserve.pdf [PDF]
- Figure 11.5 Habitat Survey Results (1 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (2 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (3 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (4 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (5 of 6).pdf [PDF]
- Figure 11.5 Habitat Survey Results (6 of 6).pdf [PDF]
- Figure 11.7 Freshwater Sampling Locations.pdf [PDF]
- Figure 12.1 Landscape and Visual Impact Assesment Study Area.pdf [PDF]
- Figure 12.2 Zone of Theoretical Visibility for the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 12.3 Viewpoint Locations Map.pdf [PDF]
- Figure 12.4 Landscape and Visual Mitigation Concept.pdf [PDF]
- Figure 12.5 Proposed Wastewater Treatment Plant Landscape Mitigation Plan.pdf [PDF]
- Figure 12.6 Proposed Abbotstown Pumping Station.pdf [PDF]
- Figure 13.1 Traffic Assessment Locations.pdf [PDF]
- Figure 13.3 Proposed Left-Turn Site Access Junction on R139 Road.pdf [PDF]
- Figure 13.4 Proposed Left-Turn Site Exit on Clonshaugh Road.pdf [PDF]
- Figure 13.5 Autotrack Analysis – Max Regualted Articulated Vehicle.pdf [PDF]
- Figure 14.1 Study Area for the Construction Phase Air Quality Impact Assessment (1 of 2).pdf [PDF]
- Figure 14.1 Study Area for the Construction Phase Air Quality Impact Assessment (2 of 2).pdf [PDF]
- Figure 14.2 Study Area for the Operational Phase of the Air Quality Impact Assessment.pdf [PDF]
- Figure 14.3 Air Quality Monitoring Locations (1 of 3).pdf [PDF]
- Figure 14.3 Air Quality Monitoring Locations (2 of 3).pdf [PDF]
- Figure 14.3 Air Quality Monitoring Locations (3 of 3).pdf [PDF]
- Figure 14.4 Receptor Locations (1 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (2 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (3 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (4 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (5 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (6 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (7 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (8 of 9).pdf [PDF]
- Figure 14.4 Receptor Locations (9 of 9).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (1 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (2 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (3 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (4 of 5).pdf [PDF]
- Figure 15.1 Noise Monitoring Locations (5 of 5).pdf [PDF]
- Figure 15.2 Vibration Monitoring Locations at Connolly Hospital.pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (1 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (2 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (3 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (4 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (5 of 6).pdf [PDF]
- Figure 15.3 Noise Sensitive Receptor Locations (6 of 6).pdf [PDF]
- Figure 15.4 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Daytime).pdf [PDF]
- Figure 15.5 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Evening Time).pdf [PDF]
- Figure 15.6 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Night-time).pdf [PDF]
- Figure 15.7 Calculated Noise Contours for the Proposed Abbotstown Pumping Station Operational Phase.pdf [PDF]
- Figure 15.8 Calculated Noise Contours for the Proposed Dubber Odour Control Unit Operational Phase.pdf [PDF]
- Figure 16.1 Proposed Project (Blanchardstown) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.2 Proposed Project (M50 Junction 5)Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.3 Proposed Project (Silloge) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.4 Proposed Project (Clonshagh) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.5 Proposed Project (St Doolaghs) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 16.6 Proposed Project (Baldoyle Estuary Nature Reserve) Showing Surrounding Sites of Cultural Heritage Significance.pdf [PDF]
- Figure 17.1 Proposed Project Overview.pdf [PDF]
- Figure 17.10 Proposed Watercourse Crossings.pdf [PDF]
- Figure 17.11 Location of Site Investigation Boreholes at Clonshagh.pdf [PDF]
- Figure 17.12 Location of Site Investigation Boreholes.pdf [PDF]
- Figure 17.2 Groundwater Supply Well.pdf [PDF]
- Figure 17.3 Hydrological Study Area.pdf [PDF]
- Figure 17.4 Bedrock Geology.pdf [PDF]
- Figure 17.5 Aquifer Classification.pdf [PDF]
- Figure 17.6 Groundwater Vulnerability.pdf [PDF]
- Figure 17.7 Soils.pdf [PDF]
- Figure 17.8 Groundwater Supply Wells.pdf [PDF]
- Figure 17.9 Portmarnock Golf Club Irrigation Wells and Flow Regime.pdf [PDF]
- Figure 18.1 Teagasc Subsoils Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.1 Teagasc Subsoils Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.1 Teagasc Subsoils Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 18.2 Bedrock Geology Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.2 Bedrock Geology Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.2 Bedrock Geology Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 18.3 Route Constraints Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.3 Route Constraints Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.3 Route Constraints Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 18.4 Site Investigation Blanchardstown to Clonshagh (1 of 3).pdf [PDF]
- Figure 18.4 Site Investigation Blanchardstown to Clonshagh (2 of 3).pdf [PDF]
- Figure 18.4 Site Investigation Portmarnock to Proposed Marine Outfall (3 of 3).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (1 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (2 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (3 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (4 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (5 of 6).pdf [PDF]
- Figure 19.1 Agricultural Land Parcels (6 of 6).pdf [PDF]
- Figure 23.1 Other Developments Considered.pdf [PDF]
- Figure 3.1 Contributing Catchments of Existing Wastewater Treatment Plants.pdf [PDF]
- Figure 3.2 Critical Catchments.pdf [PDF]
- Figure 3.3 Potential Secondary Catchments.pdf [PDF]
- Figure 4.1 Proposed Project Overview.pdf [PDF]
- Figure 4.2 Designated Areas in the Vicinity of the Proposed Project.pdf [PDF]
- Figure 4.3 Proposed Wastewater Treatment Plant Site.pdf [PDF]
- Figure 4.4 Land Use Zoning Objectives at the Proposed Wastewater Treatment Plant Site.pdf [PDF]
- Figure 4.5 Zonal Arrangement of the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 4.6 Typical Detail of the Proposed Pipeline Route Construction Corridor.pdf [PDF]
- Figure 4.7 Typical Arrangement for Proposed Microtunnelling Compound.pdf [PDF]
- Figure 4.8 Typical Cross Section of the Proposed Pipeline Route Trench Dredged in the Seabed.pdf [PDF]
- Figure 6.1 Study Area for the Proposed Wastewater Treatment Plant.pdf [PDF]
- Figure 6.10 Tourism, Public Amenities, Sporting and Community Infrastructure.pdf [PDF]
- Figure 6.2 Study Area for Proposed Orbital Sewer Route, Outfall Pipeline Route and Abbotstown Pumping Station.pdf [PDF]
- Figure 6.3 Residential Buildings within the Proposed Project Study Area.pdf [PDF]
- Figure 6.4 Land Use Zonings within the Proposed Project Study Area.pdf [PDF]
- Figure 6.5 Residential Zoned Lands within the Proposed Project Study Area.pdf [PDF]
- Figure 6.6 Economic Activity within the Proposed Project Study Area.pdf [PDF]
- Figure 6.7 Commercial Clusters within the Proposed Project Study Area.pdf [PDF]
- Figure 6.8 Healthcare Facilities within the Proposed Project Study Area.pdf [PDF]
- Figure 6.9 Primary and Secondary Level Schools within the Proposed Project Study Area.pdf [PDF]
- Figure 8.1 Coastal and Transitional Waterbodies.pdf [PDF]
- Figure 8.10 Marine Sampling Stations.pdf [PDF]
- Figure 8.11 Ecological Status.pdf [PDF]
- Figure 8.12 Quality of Bathing Waters.pdf [PDF]
- Figure 8.13 Trophic Status.pdf [PDF]
- Figure 8.2 Designated Areas.pdf [PDF]
- Figure 8.3 Model mesh and Bathymetry.pdf [PDF]
- Figure 8.4 High Resolution Mesh.pdf [PDF]
- Figure 8.5 Calibration Locations.pdf [PDF]
- Figure 8.6 Vibrocore and Borehole Locations.pdf [PDF]
- Figure 8.7 Modelled Rivers and Hydrometric Stations.pdf [PDF]
- Figure 8.8 Wastewater Treatment Plant Outfall Locations.pdf [PDF]
- Figure 8.9 Modelled Rivers and Quality Stations.pdf [PDF]
- Figure 9.1 Summary of Field Survey Operations for the Proposed Outfall Pipeline Route.pdf [PDF]
- Figure 9.2 Summary of Bathymetry Data for the Proposed Outfall Pipeline Route.pdf [PDF]
- Figure 9.3 Sediment Changes near the Proposed Outfall Pipeline Route and Diffuser Location.pdf [PDF]
- Figure 9.4 Casual Sightings and Dedicated Surveys of the Harbour Porpoise.pdf [PDF]
- Figure 9.5 Inshore Shelfish Grounds along the Fingal Coast.pdf [PDF]
- Figure 9.6 Maximum Suspended Sediment Plume Concentrations arising from dredging over the duration of the dredging works for the.pdf [PDF]
- Volume 5 Part A Cover and Contents.pdf [PDF]
- Volume 5 Part B RBSF Figures
- Volume 5 Part B Cover and Contents.pdf [PDF]
- Y17702-PL-001 - General Site Location Plan.pdf [PDF]
- Y17702-PL-002 - Site Location Map.pdf [PDF]
- Y17702-PL-003 - Existing Site Layout.pdf [PDF]
- Y17702-PL-004 - Proposed Site Layout.pdf [PDF]
- Y17702-PL-005 - Existing Buildings to be Demolished - Elevations and Plans.Pdf [PDF]
- Y17702-PL-006 - Proposed Ancillary Buildings.pdf [PDF]
- Y17702-PL-007 - Storage Building A - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-008 - Storage Building A - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-009 - Storage Building B - Roof Plan and Elevations.pdf [PDF]
- Y17702-PL-010 - Storage Building B - Plans and Cross Sections.pdf [PDF]
- Y17702-PL-011 - Landscape Layout.pdf [PDF]
- Y17702-PL-012 - Contiguous Elevations.pdf [PDF]
- Y17702-PL-013 - Proposed Road Layout and Markings.pdf [PDF]
- Y17702-PL-014 - Junction Layout, Lamp Standard and Typical Road Details.pdf [PDF]
- Y17702-PL-015 - Surface Water Drainage Layout.pdf [PDF]
- Y17702-PL-016 - Surface Water Drainage - Typical Details.pdf [PDF]
- Y17702-PL-017 - Foul Drainage Layout.pdf [PDF]
- Y17702-PL-018 - Existing Foul Pumping Station - Plans and Section.pdf [PDF]
- Y17702-PL-019 - Manhole, Trench Backfill And Bedding - Typical Details.pdf [PDF]
- Y17702-PL-020 - Watermain Layout.pdf [PDF]
- Y17702-PL-021 - Watermain Typical Details.pdf [PDF]
- Y17702-PL-022 - Odour Control Unit - Plan and Elevation.pdf [PDF]
- Y17702-PL-023 - Electricity and External Lighting Layout.pdf [PDF]
- Y17702-PL-024 - Site Development Details.pdf [PDF]
- Y17702-PL-025 - Weighbridge Details and ME Control Building.pdf [PDF]
- Y17702-PL-026 - Construction and Permanent Information Sign.pdf [PDF]
- Y17702-PL-027 - Proposed Site Layout Overlaid with Services.pdf [PDF]
- Volume 6 Photomontages
- Viewpoint 1.pdf [PDF]
- Viewpoint 10.pdf [PDF]
- Viewpoint 11.pdf [PDF]
- Viewpoint 12.pdf [PDF]
- Viewpoint 13.pdf [PDF]
- Viewpoint 14.pdf [PDF]
- Viewpoint 2.pdf [PDF]
- Viewpoint 3.pdf [PDF]
- Viewpoint 4.pdf [PDF]
- Viewpoint 5.pdf [PDF]
- Viewpoint 6.pdf [PDF]
- Viewpoint 7.pdf [PDF]
- Viewpoint 8.pdf [PDF]
- Viewpoint 9.pdf [PDF]
- Volume 6 Cover and Contents.pdf [PDF]
- View associated documents
If this case is not decided you may be able to make an observation , please note the case number and get further information here.
Legend
- Live Case
- Granted
- Refused
- Invalid
- Withdrawn
- See Case for further detail