An Coimisiún Pleanála - Case reference: PL20.322996
Planning Authority Case Reference: 2560042
Clonlee , Ballinlough , Co. Roscommon
Roscommon County Council
Map does not exist
Description
retention of existing caravan on site for 18 months from date of grant of planning permission, 2) retention of existing agricultural structures (stables and attached storage building) and detached outhouse for use ancillary to the house, 3) upgrading of existing septic tank to a proprietary tertiary wastewater treatment system, 4) temporary connection of the caravan to the upgraded wastewater treatment system and connection of the renovated dwelling to the upgraded wastewater treatment system, at which time the caravan will be disconnected, 5) retention of and modifications to, the existing rear and side extension to existing dwelling house, including provision of a pitched roof to the side extension to replace the existing flat roof and 6) all ancillary works at
Case type
Planning Appeal
Decision
Case is due to be decided by 12/11/2025
EIAR
No
NIS
No
Parties
-
Bart Nielen & Regina Postma (Applicant)
-
Bart Nielen and Regina Postma (1st Party Appellant) (Invalid)
History
-
10/07/2025
Lodged