An Coimisiún Pleanála - Case reference: CH92.323982
in Counties Tipperary, Offaly, Kildare, and Dublin
Tipperary County Council
Description
Uisce Eireann Compulsory Purchase (Water Supply Project Eastern and Midlands Region) Order, 2025
Case type
Compulsory Acquisition Housing Act
Decision
Case is due to be decided by 02/07/2027
EIAR
No
NIS
No
History
-
19/12/2025
Lodged
Documents
-
Case Documentation
- View associated documents
- Applicant Documents
- Application Documents
- 0. Index
- 0a. ACP Cover letter
- 1. CEO Order
- 2. CPO Order
- 3. CPO Order Plans
- CPO Order Plan Sheet 001 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 002 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 003 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 004 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 005 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 006 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 007 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 008 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 009 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 010 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 011 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 012 of 113 (Ref Key Plan 1 of 9).pdf [PDF]
- CPO Order Plan Sheet 013 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 014 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 015 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 016 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 017 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 018 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 019 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 020 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 021 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 022 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 023 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 024 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 025 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 026 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 027 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 028 of 113 (Ref Key Plan 2 of 9).pdf [PDF]
- CPO Order Plan Sheet 029 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 030 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 031 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 032 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 033 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 034 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 035 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 036 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 037 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 038 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 039 of 113 (Ref Key Plan 3 of 9).pdf [PDF]
- CPO Order Plan Sheet 040 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 041 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 042 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 043 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 044 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 045 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 046 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 047 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 048 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 049 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 050 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 051 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 052 of 113 (Ref Key Plan 4 of 9).pdf [PDF]
- CPO Order Plan Sheet 053 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 054 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 055 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 056 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 057 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 058 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 059 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 060 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 061 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 062 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 063 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 064 of 113 (Ref Key Plan 5 of 9).pdf [PDF]
- CPO Order Plan Sheet 065 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 066 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 067 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 068 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 069 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 070 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 071 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 072 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 073 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 074 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 075 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 076 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 077 of 113 (Ref Key Plan 6 of 9).pdf [PDF]
- CPO Order Plan Sheet 078 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 079 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 080 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 081 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 082 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 083 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 084 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 085 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 086 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 087 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 088 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 089 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 090 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 091 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 092 of 113 (Ref Key Plan 7 of 9).pdf [PDF]
- CPO Order Plan Sheet 093 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 094 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 095 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 096 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 097 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 098 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 099 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 100 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 101 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 102 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 103 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 104 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 105 of 113 (Ref Key Plan 8 of 9).pdf [PDF]
- CPO Order Plan Sheet 106 of 113 (Ref Key Plan 9 of 9).pdf [PDF]
- CPO Order Plan Sheet 107 of 113 (Ref Key Plan 9 of 9).pdf [PDF]
- CPO Order Plan Sheet 108 of 113 (Ref Key Plan 9 of 9).pdf [PDF]
- CPO Order Plan Sheet 109 of 113 (Ref Key Plan 9 of 9).pdf [PDF]
- CPO Order Plan Sheet 110 of 113 (Ref Key Plan 9 of 9).pdf [PDF]
- CPO Order Plan Sheet 111 of 113 (Ref Key Plan 9 of 9).pdf [PDF]
- CPO Order Plan Sheet 112 of 113 (Ref Key Plan 9 of 9).pdf [PDF]
- CPO Order Plan Sheet 113 of 113 (Ref Key Plan 9 of 9).pdf [PDF]
- 3a. CPO Order Plans Schedule and Cover Sheet
- 4. CPO Newspaper Notice
- 5. Sample Landowner Notice
- 6. Copies of certificate of service
- 7. CPO Engineers Report
- 7a. CPO Schedule
- 7b. CPO Draft Order Plans
- 7c CPO Draft Order
- 7d. CPO Routing Report
- CPO-Routing-Report-Appendix-A-Cumulative-Constraints-with-White-Space-Boundary.pdf [PDF]
- CPO-Routing-Report-Appendix-B-Least-Constrained-and-Preliminary-200m-Pipeline-Corridor.pdf [PDF]
- CPO-Routing-Report-Appendix-C-Prelim-200m Corridor-and-Preferred-200m-Corridor.pdf [PDF]
- CPO-Routing-Report-Appendix-D-Preferred-200m-Corridor-and-Indicative-50m-Corridor.pdf [PDF]
- CPO-Routing-Report-Appendix-E-Reroute-Mapbook.pdf [PDF]
- CPO-Routing-Report-Final.pdf [PDF]
- 7e. CPO Planning Report
- 7f. EIAR
- Volume 1 - Non-Technical Summary
- Volume 2 - EIAR Main Report
- Volume 3 - Environmental Assessment
- Chapter 09 Water
- Chapter 10 Soils, Geology and Hydrogeology
- Chapter 11 Agriculture
- Chapter 12 Air Quality
- Chapter 13 Climate
- Chapter 14 Population
- Chapter 15 Human Health
- Chapter 16 Landscape & Visual
- Chapter 17 Cultural Heritage
- Chapter 18 Material Assets
- Chapter 19 Resource and Waste Management
- Chapter 20 Risk of Major Accidents and Disasters
- Chapter 6 Noise & Vibration
- Chapter 7 Traffic & Transport
- Chapter 8 - Biodiversity
- Volume 4 - Summary
- Volume 5 - Drawings and Figures
- Chapter 03 Consideration of Reasonable Alternatives
- FI561D~1.PDF [PDF]
- Figure-3.1-Alternative-Raw-Water-Abstraction-Sites.pdf [PDF]
- Figure-3.10-Alternative-Locations-for-BPT.pdf [PDF]
- Figure-3.11-3.14-Alternative-Booster-Pumping-Station-Sites-Overview.pdf [PDF]
- Figure-3.15-3.21-Locations-of-FCV-Sites-Overview.pdf [PDF]
- Figure-3.2-Preliminary-and-Least-Constrained-Route-Corridor.pdf [PDF]
- Figure-3.22-Proposed-and-Rejected-Compound-and-Depot-Sites.pdf [PDF]
- Figure-3.3-Route-Options-Overview.pdf [PDF]
- Figure-3.4-Pipeline-Route-Options.pdf [PDF]
- Figure-3.5-Pipeline-Route-Options.pdf [PDF]
- Figure-3.6-Pipeline-Route-Options.pdf [PDF]
- Figure-3.7-Pipeline-Route-Options.pdf [PDF]
- Figure-3.8-Initial-Areas-Considered-for-WTP-Location.pdf [PDF]
- Chapter 04 Proposed Project Description
- Figure-4.1-Overview-of-the-Proposed-Project.pdf [PDF]
- Figure-4.100-Raw-Water-Intake-and-Access-Road-Proposed-Land-Use.pdf [PDF]
- Figure-4.101-Water-Treatment-Plant-and-Access-Road-Proposed-Land-Use.pdf [PDF]
- Figure-4.102-Break-Pressure-Tank-and-Access-Road-Proposed-Land-Use.pdf [PDF]
- Figure-4.103-Booster-Pumping-Station-Proposed-Land-Use.pdf [PDF]
- Figure-4.104-Flow-Control-Valve-Proposed-Land-Use.pdf [PDF]
- Figure-4.105-Termination-Point-Reservoir-Proposed-Land-Use.pdf [PDF]
- Figure-4.106-4.184-Environmental-Masterplan.pdf [PDF]
- Figure-4.185-4.235-20-Metre-Pipeline-Corridor.pdf [PDF]
- Figure-4.2-4.60-Project-Component-Overview.pdf [PDF]
- Figure-4.61-Raw-Water-Intake-and-Pumping-Station-Proposed-Site-Layout-Plan.pdf [PDF]
- Figure-4.62-Raw-Water-Intake-and-Pumping-Station-at-Parteen-Basin-Access-Road.pdf [PDF]
- Figure-4.63-Water-Treatment-Plant-Proposed-Site-Layout-Plan.pdf [PDF]
- Figure-4.64-Water-Treatment-Plant-Access-Road-Layout-Plan-and-Cross-Section.pdf [PDF]
- Figure-4.65-Proposed-Water-Treatment-Plant-Process-Flow-Diagram.pdf [PDF]
- Figure-4.66-Break-Pressure-Tank-Site-Layout.pdf [PDF]
- Figure-4.67-Break-Pressure-Tank-Access-Road.pdf [PDF]
- Figure-4.68-Booster-Pumping-Station-Proposed-Site-Layout.pdf [PDF]
- Figure-4.69-Line-Valve-and-Flow-Control-Valve-Plan-and-Cross-Sections.pdf [PDF]
- Figure-4.70-Termination-Point-Reservoir-Proposed-Phase-1-Site-Layout.pdf [PDF]
- Figure-4.71-Termination-Point-Reservoir-Access-Road-Layout.pdf [PDF]
- Figure-4.72-Overview-of-Proposed-38kV-Uprate-Works.pdf [PDF]
- Figure-4.73-4.80-Proposed-38-kV-Uprate-Works.pdf [PDF]
- Figure-4.81-Future-Connection-Point-Valve-Detail.pdf [PDF]
- Figure-4.82-Proposed-Typical-Line-Valve-Arrangement-(Incl-2-Air-Valves).pdf [PDF]
- Figure-4.83-Proposed-Typical-Line-Valve-Arrangement-(No-Air-Valves).pdf [PDF]
- Figure-4.84-Proposed-Typical-Line-Valve-Arrangement-(Incl-1-Air-Valve-Upstream).pdf [PDF]
- Figure-4.85-Proposed-Typical-Line-Valve-Arrangement (Incl-1-Air-Valve-Downstream).pdf [PDF]
- Figure-4.86-Proposed-Typical-Air-Valve-Arrangement.pdf [PDF]
- Figure-4.87-Proposed-Typical-Washout-Valve-Arrangement.pdf [PDF]
- Figure-4.88-Typical-Line-Valve-Arrangement-(Including-Embankment-Cross-Section).pdf [PDF]
- Figure-4.89-Raw-Water-Intake-and-Pumping-Station-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.90-Raw-Water-Intake-and-Pumping-Station-Proposed-Site-Access-Road-Landscape-Plan.pdf [PDF]
- Figure-4.91-Water-Treatment-Plant-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.92-Water-Treatment-Plant-Proposed-Access-Road-Landscape-Plan.pdf [PDF]
- Figure-4.93-Break-Pressure-Tank-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.94-Break-Pressure-Tank-Proposed-Access-Road-Landscape-Plan.pdf [PDF]
- Figure-4.95-Booster-Pumping-Station-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.96-Flow-Control-Valve-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.97-Termination-Point-Reservoir-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.98-Termination-Point-Reservoir-Proposed-Access-Road-Layout-Plan.pdf [PDF]
- Figure-4.99-Landscape-Specification.pdf [PDF]
- Chapter 05 Construction & Commissioning
- Figure-5.01-Raw-Water-Intake-and-Pumping-Station-Temporary-Works-Layout.pdf [PDF]
- Figure-5.02-Water-Treatment-Plant-Indicative-Site-Compound-Plan.pdf [PDF]
- Figure-5.03-Pipe-Construction-Compound-Lisgarriff.pdf [PDF]
- Figure-5.04-Break-Pressure-Tank-Indicative-Satellite-Construction-Compound-Plan.pdf [PDF]
- Figure-5.05-Booster-Pumping-Station-Indicative-Satellite-Construction-Compound-Plan.pdf [PDF]
- Figure-5.06-Pipe-Construction-Compound-Killananny.pdf [PDF]
- Figure-5.07-Pipe-Construction-Compound-Drummond.pdf [PDF]
- Figure-5.08-Termination-Point-Reservoir-Indicative-Satellite-Construction-Compound-Plan.pdf [PDF]
- Figure-5.09-Pipe-Construction-Compound-Carrigatogher.pdf [PDF]
- Figure-5.10-Pipe-Storage-Depot-Toora.pdf [PDF]
- Figure-5.11-Pipe-Storage-Depot-Boveen.pdf [PDF]
- Figure-5.12-Pipe-Storage-Depot-Fortel.pdf [PDF]
- Figure-5.13-Pipe-Storage-Depot-Derrinboy.pdf [PDF]
- Figure-5.14-Pipe-Storage-Depot-Derryweelan.pdf [PDF]
- Figure-5.15-Pipe-Storage-Depot-Rathlumber.pdf [PDF]
- Figure-5.16-Pipe-Storage-Depot-Graiguepottle.pdf [PDF]
- Figure-5.17-Pipe-Storage-Depot-Barberstown-Upper.pdf [PDF]
- Figure-5.18-5.26-Haul-Roads.pdf [PDF]
- Figure-5.27-Typical-Construction-Working-Width.pdf [PDF]
- Figure-5.28-Typical-Construction-Working-Width-Peat.pdf [PDF]
- Figure-5.29-Water-Treatment-Plant-Construction-Sequences.pdf [PDF]
- Figure-5.30-Water-Treatment-Plant-Details-of-Entrance-at-R445.pdf [PDF]
- Figure-5.31-Damming-and-Fluming-(Typical-Arrangement).pdf [PDF]
- Figure-5.32-Damming-and-Pumping-(Typical-Arrangement).pdf [PDF]
- Figure-5.33-Typical-Trenchless-Crossing-Arrangement.pdf [PDF]
- Figure-5.34-Typical-Construction-Working-Width-Trenchless-Crossing-Launch-Pit.pdf [PDF]
- Figure-5.35-5.85-Methods-of-Construction.pdf [PDF]
- Chapter 10 Soils, Geology and Hydrogeology
- Figure-10.1-10.4 Soils.pdf [PDF]
- Figure-10.113-10.117-Landslide-Susceptibility.pdf [PDF]
- Figure-10.118-10.122-Source-Protection-Areas.pdf [PDF]
- Figure-10.123-10.134-Groundwater-Monitoring.pdf [PDF]
- Figure-10.13-Karst-and-Groundwater-Flooding.pdf [PDF]
- Figure-10.135-to-10.149-Conceptual-Site-Model.pdf [PDF]
- Figure-10.14-10.17-Groundwater-Vulnerability.pdf [PDF]
- Figure-10.150-10.162-Proposed-Bord-na-Móna-Groundwater-Monitoring-Locations.pdf [PDF]
- Figure-10.18-10.22-Soils-Geological-Heritage.pdf [PDF]
- Figure-10.23-10.81-GI-Locations.pdf [PDF]
- Figure-10.5-10.8-Subsoils.pdf [PDF]
- Figure-10.82-10.86-Potential-Contaminated-Land.pdf [PDF]
- Figure-10.87-10.91-Geomorphology.pdf [PDF]
- Figure-10.9-10.12-Geology.pdf [PDF]
- Figure-10.92-10.112-Peat-Areas.pdf [PDF]
- Chapter 11 Agriculture
- Chapter 12 Air Quality
- Chapter 14 Population
- Chapter 15 Human Health
- Chapter 16 Landscape & Visual
- FI04FC~1.PDF [PDF]
- FI3982~1.PDF [PDF]
- FI4C50~1.PDF [PDF]
- FIB3F4~1.PDF [PDF]
- FIFA30~1.PDF [PDF]
- Figure-16.10-Viewpoint-Locations-Selected-for-the-Proposed-Raw-Water-Intake-&-Pumping-Station.pdf [PDF]
- Figure-16.11-Viewpoint-Locations-Selected-for-the-Proposed-Water-Treatment-Plant.pdf [PDF]
- Figure-16.12-Viewpoint-Locations-Selected-for-the-Proposed-Break-Pressure-Tank.pdf [PDF]
- Figure-16.13-Viewpoint-Locations-Selected-for-the-Proposed-Booster-Pumping-Station.pdf [PDF]
- Figure-16.14-Viewpoint-Locations-Selected-for-the-Proposed-Termination-Point-Reservoir.pdf [PDF]
- Figure-16.17-Viewpoint-Locations-Selected-for-the-Proposed-Flow-Control-Valve.pdf [PDF]
- Figure-16.3-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Water-Treatment-Plant.pdf [PDF]
- Figure-16.4-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Water-Treatment-Plant.pdf [PDF]
- Figure-16.5-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Break-Pressure-Tank.pdf [PDF]
- Figure-16.6-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Break-Pressure-Tank.pdf [PDF]
- Figure-16.9-Viewpoint-Locations-Selected-for-the-38kV-Uprate-Works.pdf [PDF]
- FIGURE~1.PDF [PDF]
- Chapter 17 Cultural Heritage
- Chapter 18 Material Assets
- Chapter 21 Cumulative Effects and Interactions
- Chapter 6 Noise & Vibration
- Chapter 7 Traffic & Transport
- Figure-7.1-Project-Component-Overview.pdf [PDF]
- Figure-7.18-7.21-Collisions.pdf [PDF]
- Figure-7.2-7.8-Haul-Roads-(with-access-points).pdf [PDF]
- Figure-7.22-7.26-AADT-Do-Minimum-Do-Something.pdf [PDF]
- Figure-7.27-7.29-Pedestrians-and-Cyclists-for-Junctions.pdf [PDF]
- Figure-7.30-7.32-Public-Transport-for-Junctions.pdf [PDF]
- Figure-7.33-7.38-Public-Transport-or-Pedestrians-and-Cyclists-for-Road-Network.pdf [PDF]
- Figure-7.9-7.17-Traffic-Counts-overview.pdf [PDF]
- Chapter 8 Biodiversity
- Figure-8.1-European-Sites-Within-the-Potential-Zone-of-Influence-of-the-Proposed-Project.pdf [PDF]
- Figure-8.109-8.212-Protected-Fauna.pdf [PDF]
- Figure-8.2-Nationally-Designated-Sites-Within-the-Potential-Zone-of-Influence-of-the-Proposed-Project.pdf [PDF]
- Figure-8.3-Ramsar-Sites-and-Nature-Reserves-Within-the-Potential-Zone-of-Influence-of-the-Proposed-Project.pdf [PDF]
- Figure-8.4-8.108-Habitat-and-Flora-Map.pdf [PDF]
- Chapter 03 Consideration of Reasonable Alternatives
- Volume 6 - Appendices
- Chapter 1 Introduction
- Chapter 10 Soils, Geology and Hydrogeology
- Appendix-A10.1-Ground-Investigations.pdf [PDF]
- Appendix-A10.10-BPS-Ground-Investigations.pdf [PDF]
- Appendix-A10.11-Lot-3-Peatlands-TWC-10,000-to-TWD-29,000.pdf [PDF]
- Appendix-A10.12-Lot-3-Peatlands.pdf [PDF]
- Appendix-A10.13-TPR-Ground-Investigations.pdf [PDF]
- Appendix-A10.14-Supplemental-Ground-Investigations-for-Lot-3.pdf [PDF]
- Appendix-A10.15-Summary-of-Private-Groundwater-Supplies.pdf [PDF]
- Appendix-A10.16-Dewatering-Calculations.pdf [PDF]
- Appendix-A10.2-RWI-Ground-Investigations-2018-2019.pdf [PDF]
- Appendix-A10.3-Petrol-Station-Assessment.pdf [PDF]
- Appendix-A10.4-RWI&PS-Ground-Investigations-2022.pdf [PDF]
- Appendix-A10.5-RWRM-Ground-Investigations.pdf [PDF]
- Appendix-A10.6-WTP-Ground-Investigations.pdf [PDF]
- Appendix-A10.7-Lot-1-Treated-Water-Pipeline-TWO-WTP-BPT.pdf [PDF]
- Appendix-A10.8-BPT-Ground-Investigations.pdf [PDF]
- Appendix-A10.9-Lot-2-Pipeline-Ground-Investigations.pdf [PDF]
- Chapter 11 Agriculture
- Appendix-A11.1-Agronomy-Impact-Assessment-Farm-Survey.pdf [PDF]
- Appendix-A11.2-Table-of-Impact-Assessment-Pipeline-Infrastructure.pdf [PDF]
- Appendix-A11.3-Table-of-Impact-Assessment-Infrastructure-Sites.pdf [PDF]
- Appendix-A11.4-Summary-of-Land-Acquisition-Type.pdf [PDF]
- Appendix-A11.5-Table-of-Impact-Assessment-38kV-Uprate-Works.pdf [PDF]
- Chapter 12 Air Quality
- Chapter 14 Population
- Chapter 15 Human Health
- Chapter 16 Landscape & Visual
- Appendix-A16.1-Operational-Phase-Visual-Impact-Appraisal-at-Representative-View-Points.pdf [PDF]
- Appendix-A16.2-Photomontages-38kV-Uprate-Works.pdf [PDF]
- Appendix-A16.2-Photomontages-Booster-Pumping-Station.pdf [PDF]
- Appendix-A16.2-Photomontages-Break-Pressure-Tank.pdf [PDF]
- Appendix-A16.2-Photomontages-Flow-Control-Valve.pdf [PDF]
- Appendix-A16.2-Photomontages-Raw-Water-Intake-&-Pumping-Station.pdf [PDF]
- Appendix-A16.2-Photomontages-Termination-Point-Reservoir.pdf [PDF]
- Appendix-A16.2-Photomontages-Water-Treatment-Plant.pdf [PDF]
- Figure-16.1-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Raw-Water-Intake-&-Pumping-Station.PDF [PDF]
- Figure-16.10-Viewpoint-Locations-Selected-for-the-Proposed-Raw-Water-Intake-&-Pumping-Station.pdf [PDF]
- Figure-16.11-Viewpoint-Locations-Selected-for-the-Proposed-Water-Treatment-Plant.pdf [PDF]
- Figure-16.12-Viewpoint-Locations-Selected-for-the-Proposed-Break-Pressure-Tank.pdf [PDF]
- Figure-16.13-Viewpoint-Locations-Selected-for-the-Proposed-Booster-Pumping-Station.pdf [PDF]
- Figure-16.14-Viewpoint-Locations-Selected-for-the-Proposed-Termination-Point-Reservoir.pdf [PDF]
- Figure-16.15-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Booster-Pumping-Station.PDF [PDF]
- Figure-16.16-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Booster-Pumping-Station.PDF [PDF]
- Figure-16.17-Viewpoint-Locations-Selected-for-the-Proposed-Flow-Control-Valve.pdf [PDF]
- Figure-16.2-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Raw-Water-Intake-&-Pumping-Station.PDF [PDF]
- Figure-16.3-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Water-Treatment-Plant.pdf [PDF]
- Figure-16.4-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Water-Treatment-Plant.pdf [PDF]
- Figure-16.5-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Break-Pressure-Tank.pdf [PDF]
- Figure-16.6-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Break-Pressure-Tank.pdf [PDF]
- Figure-16.7-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Termination-Point-Reservoir.PDF [PDF]
- Figure-16.8-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Termination-Point-Reservoir.PDF [PDF]
- Figure-16.9-Viewpoint-Locations-Selected-for-the-38kV-Uprate-Works.pdf [PDF]
- Chapter 17 Cultural Heritage
- Appendix-A17.1a-Archaeological-Geophysical-Survey-Ballyannymore,-Ballyanny-Lower-and-Tonagh-Curralanty.pdf [PDF]
- Appendix-A17.1b-Archaeological-Geophysical-Survey-Loughtown-Upper.pdf [PDF]
- Appendix-A17.2-Plates.pdf [PDF]
- Appendix-A17.3-Legislation-Protecting-the-Archaeological-Heritage-Resources.pdf [PDF]
- Appendix-A17.4-Legislation-Protecting-the-Architectural-Heritage-Resources.pdf [PDF]
- Appendix-A17.5-Impact-Assessment-and-the-Cultural-Heritage-Resource.pdf [PDF]
- Appendix-A17.6-Mitigation-Measures-and-the-Cultural-Heritage-Resource.pdf [PDF]
- Chapter 18 Material Assets
- Chapter 2 The EIA Process
- Chapter 21 Cumulative Effects and Interactions
- Chapter 3 Consideration of Reasonable Alternatives
- Chapter 4 Proposed Project Description
- Chapter 5 Construction & Commissioning
- Chapter 6 Noise & Vibration
- Chapter 7 Traffic & Transport
- Chapter 8 Biodiversity
- Appendix-A8.1-Parteen-Basin-Habitat-Assessment.pdf [PDF]
- Appendix-A8.10-Lepidoptera-Survey-Report.pdf [PDF]
- Appendix-A8.11-Vertigo-Survey-Report.pdf [PDF]
- Appendix-A8.12-Parteen-Basin-Mollusc-Survey-Report.pdf [PDF]
- Appendix-A8.13-Water-Treatment-Plant-Mollusc-Survey-Report.pdf [PDF]
- Appendix-A8.14-Watercourse-Crossing-Data.pdf [PDF]
- Appendix-A8.15-National-Research-Programme-Lakes-2016-Parteen-Basin-(Lower-Lough-Derg),-Inland-Fisheries-Ireland-Report.PDF [PDF]
- Appendix-A8.16-National-Research-Programme-Lakes-2016-Lough-Derg,-Inland-Fisheries-Ireland-Report.pdf [PDF]
- Appendix-A8.17-Aquatic-Ecological-Survey-at-the-Proposed-Parteen-Basin-Abstraction-Site-(August-2017).pdf [PDF]
- Appendix-A8.18-Aquatic-Ecological-Survey-at-the-Proposed-Parteen-Basin-Abstraction-Site-(August-2019).pdf [PDF]
- Appendix-A8.19-Aquatic-Invasive-Species-Survey-Report-2021.pdf [PDF]
- Appendix-A8.2-Assessment-of-the-Woodland-Near-Parteen-Weir.pdf [PDF]
- Appendix-A8.20-Underwater-Noise-Modelling-Report.pdf [PDF]
- Appendix-A8.21-Breeding-Bird-Summary-Report.pdf [PDF]
- Appendix-A8.22-Winter-Bird-Summary-Report.pdf [PDF]
- Appendix-A8.23-Aquatic-Invasive-Species-and-Macrophyte-Survey-at-Lough-Derg-and-Parteen-Basin.pdf [PDF]
- Appendix-A8.24-Bat-Derogation-Licence-Application.pdf [PDF]
- Appendix-A8.25-Otter-Derogation-Licence-Application-Final.pdf [PDF]
- Appendix-A8.3-Site-Description-of-Coagh-Upper-Fen,-County-Offaly.pdf [PDF]
- Appendix-A8.4-Targeted-Habitat-Surveys-Report.pdf [PDF]
- Appendix-A8.5-Rare-Plant-Surveys-Report.pdf [PDF]
- Appendix-A8.6-Fungi-Survey-Report.pdf [PDF]
- Appendix-A8.7-Lichen-Survey-Report.pdf [PDF]
- Appendix-A8.8-Bryophyte-Survey-Report.pdf [PDF]
- Appendix-A8.9-Bat-Surveys-Report.pdf [PDF]
- Chapter 9 Water
- Appendix-A9.1-Abstraction-Assessment.pdf [PDF]
- Appendix-A9.2-Pipeline-Assessment.pdf [PDF]
- Appendix-A9.3-Non-linear-Principal-Infrastructure-and-38kV-Uprate-Works-Assessment.pdf [PDF]
- Appendix-A9.4-Flood-Risk-Assessment.pdf [PDF]
- Appendix-A9.5-Baseline.pdf [PDF]
- Appendix-A9.6-Laboratory-Analysis-and-In-Situ-Results.pdf [PDF]
- Appendix-A9.7-EPA-Monitoring-Information.pdf [PDF]
- Water Status Impact Assessment Report
- 7g. Natura Impact Statement
- 7h. Context Plan