An Coimisiún Pleanála - Case reference: PA61.PA0033
Renmore and Townparks Townlands, Galway
Galway City Council
Description
Galway Harbour Extension
Case type
Private Development - Application
Decision
Proposed Decision Date notavailable at this time
EIAR
Yes
NIS
Yes
Parties
-
Galway Harbour Company (Applicant)
-
Galway City Council (Local Authority)
-
Galway County Council (Local Authority)
History
-
10/01/2014
Lodged
Documents
-
Case Documentation
- Féach ar dhoiciméid ghaolmhara
- 7476-270924-GHE-Cover-Letter-Issued-ABP-2 (1).pdf [PDF]
- Applicant Documents
- Environmental
- Vol 2A Non Technical Summary
- Vol 2B Main EIS
- Ch 01 Introduction and Background.pdf [PDF]
- Ch 02 Project Context - Planning and Business Case.pdf [PDF]
- Ch 03 Alternatives.pdf [PDF]
- Ch 04 Description of Development.pdf [PDF]
- Ch 05 Human Beings and Socio Economic.pdf [PDF]
- Ch 06 Soils.pdf [PDF]
- Ch 07 Flora and Fauna.pdf [PDF]
- Ch 08 Water.pdf [PDF]
- Ch 09 Air Quality.pdf [PDF]
- Ch 10 Noise and Vibration.pdf [PDF]
- Ch 11 Climatic Factors.pdf [PDF]
- Ch 12 The Landscape and Visual.pdf [PDF]
- Ch 13.1 Architectural Cultural and Architectural Study.pdf [PDF]
- Ch 13.2 Archaeological.pdf [PDF]
- Ch 13.3 Rail.pdf [PDF]
- Ch 13.4 Road Traffic and Infrastructure.pdf [PDF]
- Ch 13.5 Mobility Management Programme.pdf [PDF]
- Ch 13.6 Risk Assessment.pdf [PDF]
- Ch 13.7 Safety Health and Welfare.pdf [PDF]
- Ch 14 Interactions of the above.pdf [PDF]
- Ch 15 Mitigation Measures and Monitoring Proposals.pdf [PDF]
- Vol 2C Appendices to EIS
- Appendix 1
- Appendix 10
- Appendix 11
- Appendix 12
- Appendix 13
- Appendix 14
- Appendix 15
- Appendix 2
- 2.2.1 DKM Business Case Report
- 2.3.1 ABP Consultations
- ABP 1st Consultation - Record 1 - 180607.pdf [PDF]
- ABP 1st Consultation - Record 2 - 051207.pdf [PDF]
- ABP 1st Consultation - Record 3 - 070510.pdf [PDF]
- ABP 1st Consultation - Record 4 - 180810.pdf [PDF]
- ABP 2nd Consultation record 1 01.10.2012.pdf [PDF]
- ABP 2nd Consultation record 2 15.01.2013.pdf [PDF]
- ABP 2nd Consultation record 3 24.04.2013.pdf [PDF]
- ABP 2nd Consultation record 4 11.07.2013.pdf [PDF]
- 2.3.2 SID Determinations
- 2.3.3 Scoping Submitted
- 2.3.4 Scoping Report
- 2.3.5 Consultees Responses to Scoping
- 2.3.6 List of Presribed Bodies
- 2.3.7 List of Consultations
- 2.3.8 Public Consulltation Posters
- Appendix 3
- Appendix 4
- App 4.1 Cover Letter.pdf [PDF]
- Appendix 4.1 Waste Management Plan.pdf [PDF]
- Appendix 4.2 Environmental Management Framework.pdf [PDF]
- Appendix 4.3 Oil Spill Contingency Plan.pdf [PDF]
- Appendix 4.4 Galfire Plan.pdf [PDF]
- Appendix 4.5 Port bye laws.pdf [PDF]
- Appendix 4.6 G. Evans Report on Safety Protocols.pdf [PDF]
- Appendix 4.7 Civil Works Design Report.pdf [PDF]
- Appendix 5
- Appendix 6
- Appendix 7
- Appendix 8
- Appendix 9
- Appendix 1
- Vol 2D Drawings - See Main Drawings Folder
- Galway Harbour Extension Master Template.pdf [PDF]
- Planning
- Vol 1A Planning Application Documents
- 0 - Letter to An Bord Pleanala.pdf [PDF]
- 1 - Planning Application Form.pdf [PDF]
- 10 - Notice to Prescribed Bodies.pdf [PDF]
- 2 - Schedule of Drawings.pdf [PDF]
- 3 - Galway Harbour Land Ownership Maps.pdf [PDF]
- 4 - Letters of Consent.pdf [PDF]
- 5 - Newspapers Notices.pdf [PDF]
- 7 - Location Map for Site Notices.pdf [PDF]
- 8 - Schedule of Consultations.pdf [PDF]
- 9 - Letter to Local Authority.pdf [PDF]
- Vol 1B Planning Report
- Vol 1C Natura Impact Statement
- Vol 1D - See Main Drawings Folder
- Vol 1A Planning Application Documents
- Planning and Environmental Drawings
- Drawing Index Sheet.pdf [PDF]
- Drawings
- 01-0110 Harbour Company Offices.pdf [PDF]
- 02-0110 Cruise Terminal Building.pdf [PDF]
- 03-0110 Marina Management Building and Screen Wall.pdf [PDF]
- 04-0110 Harbour Management Building.pdf [PDF]
- 05-0110 Ancillary Buildings Plans Elevations and Section.pdf [PDF]
- 06-0110 Visual Envelope and Refined Study.pdf [PDF]
- 07-0110 Visbility Map.pdf [PDF]
- 08-0110 Landscape Character Areas.pdf [PDF]
- 2139-2101 Main Ports of Ireland.pdf [PDF]
- 2139-2102 Galway Bay Context.pdf [PDF]
- 2139-2103 Admiralty Map showing Navigation Route.pdf [PDF]
- 2139-2104 Galway Bay Conservation Areas (cSAC).pdf [PDF]
- 2139-2105 Galway Bay Special Protection Areas (SPA).pdf [PDF]
- 2139-2106 Galway Bay Proposed Natural Heritage Areas (pNHA).pdf [PDF]
- 2139-2107 cSAC within Enterprise Park and Harbour Extension.pdf [PDF]
- 2139-2108 pNHA within Enterprise Park and Harbour Extension.pdf [PDF]
- 2139-2109 SPA within Enterprise Park and Harbour Extension.pdf [PDF]
- 2139-2110 Terrestrial Habitats within Harbour Extension.pdf [PDF]
- 2139-2111 Marine Habitats within Harbour Extension.pdf [PDF]
- 2139-2112 General Arrangement Map and Grid.pdf [PDF]
- 2139-2112 General Arrangement Map and Grid.pdf [PDF]
- 2139-2113 Site Location Map showing Application Lands and Site Notices.pdf [PDF]
- 2139-2114 Map showing Lands Owned or Occupied by Galway Harbour Company.pdf [PDF]
- 2139-2115 Map showing Ownership of Application Lands.pdf [PDF]
- 2139-2116 Exsting Docks Map.pdf [PDF]
- 2139-2117 Site Layout Map.pdf [PDF]
- 2139-2118 Habitat Map showing GHEP Lands pre 1990.pdf [PDF]
- 2139-2121 Site Layout Plan.pdf [PDF]
- 2139-2122 Details of Site Layout Sheet 1 of 4.pdf [PDF]
- 2139-2123 Details of Site Layout Sheet 2 of 4.pdf [PDF]
- 2139-2124 Details of Site Layout Sheet 3 of 4.pdf [PDF]
- 2139-2125 Details of Site Layout Sheet 4 of 4.pdf [PDF]
- 2139-2127 Proposed Land Use.pdf [PDF]
- 2139-2128 Port Security Plan.pdf [PDF]
- 2139-2129 Escape Route Layout Plan.pdf [PDF]
- 2139-2131 Open Space Layout Plan.pdf [PDF]
- 2139-2132 Cycle Lanes and Link Paths.pdf [PDF]
- 2139-2133 Lighting Layout Plan.pdf [PDF]
- 2139-2134 Navigation Layout Plan.pdf [PDF]
- 2139-2135 Ship Manoeuvring Plan.pdf [PDF]
- 2139-2136 Site Investigation Exploratory Holes Layout Plan.pdf [PDF]
- 2139-2141 Stages of Construction.pdf [PDF]
- 2139-2142 Construction Cross Sections Sheet 1 of 2.pdf [PDF]
- 2139-2143 Construction Cross Sections Sheet 2 of 2.pdf [PDF]
- 2139-2144 Quay Wall Details.pdf [PDF]
- 2139-2145 Construction Sequencing Sheet 1 of 9.pdf [PDF]
- 2139-2146 Construction Sequencing Sheet 2 of 9.pdf [PDF]
- 2139-2147 Construction Sequencing Sheet 3 of 9.pdf [PDF]
- 2139-2148 Construction Sequencing Sheet 4 of 9.pdf [PDF]
- 2139-2149 Construction Sequencing Sheet 5 of 9.pdf [PDF]
- 2139-2150 Construction Sequencing Sheet 6 of 9.pdf [PDF]
- 2139-2151 Construction Sequencing Sheet 7 of 9.pdf [PDF]
- 2139-2152 Construction Sequencing Sheet 8 of 9.pdf [PDF]
- 2139-2153 Construction Sequencing Sheet 9 of 9.pdf [PDF]
- 2139-2154 Cross Sections Sheet 1 of 2.pdf [PDF]
- 2139-2155 Cross Sections Sheet 2 of 2.pdf [PDF]
- 2139-2161 Marina Layout Plan and Cross Section.pdf [PDF]
- 2139-2162 Nautical Slipway Plan and Sections.pdf [PDF]
- 2139-2163 Access Steps to Water Plan and Section.pdf [PDF]
- 2139-2164 Fishing Pier Plan and Section.pdf [PDF]
- 2139-2165 Layout of Access Junction.pdf [PDF]
- 2139-2166 Layout Plan of Enterprise Park Bridge.pdf [PDF]
- 2139-2167 Bridge Crossing Plan Elevation and Section.pdf [PDF]
- 2139-2168 Survey of Existing Lough Atalia Bridge and Road.pdf [PDF]
- 2139-2169 Lough Atalia Bridge Road Realignment and Storm Drainage.pdf [PDF]
- 2139-2170 Lough Atalia Bridge Plan and Elevations.pdf [PDF]
- 2139-2171 Lough Atalia Bridge Typical Road Sections.pdf [PDF]
- 2139-2172 Road Construction Cross Sections.pdf [PDF]
- 2139-2173 Auto-Track Analysis Site Access Junction.pdf [PDF]
- 2139-2174 Auto-Track Analysis Internal Layout Sheet 1 of 4.pdf [PDF]
- 2139-2175 Auto-Track Analysis Internal Layout Sheet 2 of 4.pdf [PDF]
- 2139-2176 Auto-Track Analysis Internal Layout Sheet 3 of 4.pdf [PDF]
- 2139-2177 Auto-Track Analysis Internal Layout Sheet 4 of 4.pdf [PDF]
- 2139-2178 Construction Traffic Haulage Routes.pdf [PDF]
- 2139-2179 Lough Atalia Bridge Closure Diversion Route.pdf [PDF]
- 2139-2180 Operational Traffic Proposed Haulage Routes.pdf [PDF]
- 2139-2181 Rail Link Layout Plan.pdf [PDF]
- 2139-2182 Rail Link Longitudinal Section.pdf [PDF]
- 2139-2183 Rail Link Cross Sections.pdf [PDF]
- 2139-2184 Fire Water Bund Layout Plan.pdf [PDF]
- 2139-2185 Fire Water Bund Cross Sections.pdf [PDF]
- 2139-2186 Oil Jetty Plan and Sections.pdf [PDF]
- 2139-2187 Duct Chamber Plan and Section.pdf [PDF]
- 2139-2188 Evacuation Station Plan and Section.pdf [PDF]
- 2139-2189 Detail of Security Fence and Gate.pdf [PDF]
- 2139-2190 Site Layout of Marina Management Building and Harbour Warehouse Building.pdf [PDF]
- 2139-2191 Site Layout of Cruise Terminal Building and Harbour Offices.pdf [PDF]
- 2139-2192 Details of Temporary Wheelwash.pdf [PDF]
- 2139-2193 Cargo Ship Mooring Arrangement Layout.pdf [PDF]
- 2139-2194 Oil Bitumen Tanker Mooring Arrangement Layout.pdf [PDF]
- 2139-2195 Bunded Refuelling Tank.pdf [PDF]
- 2139-2196 Quay Wall Breakwater Elevations Sheet 1 of 2.pdf [PDF]
- 2139-2197 Quay Wall Breakwater Elevations Sheet 2 of 2.pdf [PDF]
- 2139-2198 Wave Wall Details Sheet 1 of 2.pdf [PDF]
- 2139-2199 Wave Wall Details Sheet 2 of 2.pdf [PDF]
- 2139-2200 Layout Plan of Spill and Waste Control.pdf [PDF]
- 2139-2201 Watermain Layout Plan.pdf [PDF]
- 2139-2202 Watermain Layout Sheet 1 of 4.pdf [PDF]
- 2139-2203 Watermain Layout Sheet 2 of 4.pdf [PDF]
- 2139-2204 Watermain Layout Sheet 3 of 4.pdf [PDF]
- 2139-2205 Watermain Layout Sheet 4 of 4.pdf [PDF]
- 2139-2206 Watermain Chambers and Road Gulley Details.pdf [PDF]
- 2139-2207 Foul Sewer Layout Key Plan.pdf [PDF]
- 2139-2208 Foul Sewer Layout Sheet 1 of 3.pdf [PDF]
- 2139-2209 Foul Sewer layout Sheet 2 of 3.pdf [PDF]
- 2139-2210 Foul Sewer Layout Sheet 3 of 3.pdf [PDF]
- 2139-2211 Longitudinal Foul Sections Sheet 1 of 2.pdf [PDF]
- 2139-2212 Longitudinal Foul Sections Sheet 2 of 2.pdf [PDF]
- 2139-2213 Details of Foul Sewage Pumping Station.pdf [PDF]
- 2139-2214 Storm Drainage Layout Plan.pdf [PDF]
- 2139-2215 Storm Drainage Network A.pdf [PDF]
- 2139-2216 Storm Drainage Network B.pdf [PDF]
- 2139-2217 Storm Drainage Network C.pdf [PDF]
- 2139-2218 Storm Drainage Network D.pdf [PDF]
- 2139-2219 Longitudinal Storm Section Sheet 1 of 5.pdf [PDF]
- 2139-2220 Longitudinal Storm Section Sheet 2 of 5.pdf [PDF]
- 2139-2221 Longitudinal Storm Section Sheet 3 of 5.pdf [PDF]
- 2139-2222 Longitudinal Storm Section Sheet 4 of 5.pdf [PDF]
- 2139-2223 Longitudinal Storm Section Sheet 5 of 5.pdf [PDF]
- 2139-2224 Petrol Interceptor Detail.pdf [PDF]
- 2139-2225 Detail of Stormwater Outfall.pdf [PDF]
- 2139-2226 Detail of Manholes.pdf [PDF]
- 2139-2227 Saltwater and Firefighting Main Key Plan.pdf [PDF]
- 2139-2228 Saltwater Firefighting Main Sheet 1 of 4.pdf [PDF]
- 2139-2229 Saltwater Firefighting Main Sheet 2 of 4.pdf [PDF]
- 2139-2230 Saltwater Firefighting Main Sheet 3 of 4.pdf [PDF]
- 2139-2231 Saltwater Firefighting Main Sheet 4 of 4.pdf [PDF]
- 2139-2232 Utilities Layout Plan.pdf [PDF]
- 2139-2233 Layout Plan of Waste Reception Facilities.pdf [PDF]
- FIG 1 Landscape Master Plan.pdf [PDF]
- FIG 2 Environmental Circulation Pattern.pdf [PDF]
- FIG 3 Detail Area 1.pdf [PDF]
- FIG 4 Detail Area 2.pdf [PDF]
- FIG 5 Landscape Detail and Section A-A.pdf [PDF]
- FIG 6 Section C-C.pdf [PDF]
- FIG 7 Planting Detail.pdf [PDF]
- LS12090-1 Proposed Lighting Key Plan Sheet 1 of 4.pdf [PDF]
- LS12090-2 Proposed Lighting Sheet 2 of 4.pdf [PDF]
- LS12090-3 Proposed Lighting Sheet 3 of 4.pdf [PDF]
- LS12090-4 Proposed Lighting Sheet 4 of 4.pdf [PDF]
- LS12090-5 Lighting Columns.pdf [PDF]
- Model 1 Ground Level View North Eastwards.pdf [PDF]
- Model 2 Elevated View Northwards.pdf [PDF]
- Model 3 Ground Level View from Passenger Terminal.pdf [PDF]
- Model 4 Elevated View North Westward.pdf [PDF]
- Model 5 Elevated View South Eastward.pdf [PDF]
- Model 6 Ground Level View of Parkland Link.pdf [PDF]
- Plate 0 Photomontage Viewpoint Locations.pdf [PDF]
- Plate 1 Circular Road and Letteragh.pdf [PDF]
- Plate 10 Dock Road.pdf [PDF]
- Plate 11 Lough Atalia Railway Bridge.pdf [PDF]
- Plate 12 Railway Line Renmore.pdf [PDF]
- Plate 13 Mellows Park Renmore.pdf [PDF]
- Plate 14 Hawthorn Drive Renmore.pdf [PDF]
- Plate 15 Ballyloughan Road Ballyloughan.pdf [PDF]
- Plate 16 Roscam.pdf [PDF]
- Plate 17 Grattan Road Claddagh (Night View).pdf [PDF]
- Plate 18 The Long Walk (Night View).pdf [PDF]
- Plate 19 Mellows Park Renmore (Night View).pdf [PDF]
- Plate 2 Seapoint and Salthill.pdf [PDF]
- Plate 20 Hawthorn Drive Renmore (Night View).pdf [PDF]
- Plate 21 Stage 1 of Construction.pdf [PDF]
- Plate 22 Stage 2 of Construction.pdf [PDF]
- Plate 23 Stage 3 of Construction.pdf [PDF]
- Plate 24 Stage 4 of Construction.pdf [PDF]
- Plate 3 Mutton Island Causeway.pdf [PDF]
- Plate 4 South Park and Claddagh.pdf [PDF]
- Plate 5 Grattan Road and Claddagh.pdf [PDF]
- Plate 6 Nimmos Pier.pdf [PDF]
- Plate 7 Claddagh Basin.pdf [PDF]
- Plate 8 The Long Walk.pdf [PDF]
- Plate 9 The Roof of the Hynes Car Park Dock Road.pdf [PDF]
- Environmental
- HLG 00090- 24 Appendix 2 Letter from ABP 24 March 21.pdf [PDF]
- HLG 00090-24 Appendix 1 Letter from Minister Noonan re Compensatory Measures.pdf [PDF]
- HLG 00090-24 Appendix 3 Galway Harbour Extension Compensatory Measures Plan.pdf [PDF]
- HLG 00090-24 Signed Letter to ABP - Niamh Thornton.pdf [PDF]
- Public Notices
- Féach ar dhoiciméid ghaolmhara
-
The application is subject to an EIA procedure.
- Féach ar dhoiciméid ghaolmhara
- EIA Agenda January 2015.pdf [PDF]
- EIS Addenda-Arrata to Chapters.pdf [PDF]
- Environmental
- Environmental
- Vol 2A Non Technical Summary
- Vol 2B Main EIS
- Ch 01 Introduction and Background.pdf [PDF]
- Ch 02 Project Context - Planning and Business Case.pdf [PDF]
- Ch 03 Alternatives.pdf [PDF]
- Ch 04 Description of Development.pdf [PDF]
- Ch 05 Human Beings and Socio Economic.pdf [PDF]
- Ch 06 Soils.pdf [PDF]
- Ch 07 Flora and Fauna.pdf [PDF]
- Ch 08 Water.pdf [PDF]
- Ch 09 Air Quality.pdf [PDF]
- Ch 10 Noise and Vibration.pdf [PDF]
- Ch 11 Climatic Factors.pdf [PDF]
- Ch 12 The Landscape and Visual.pdf [PDF]
- Ch 13.1 Architectural Cultural and Architectural Study.pdf [PDF]
- Ch 13.2 Archaeological.pdf [PDF]
- Ch 13.3 Rail.pdf [PDF]
- Ch 13.4 Road Traffic and Infrastructure.pdf [PDF]
- Ch 13.5 Mobility Management Programme.pdf [PDF]
- Ch 13.6 Risk Assessment.pdf [PDF]
- Ch 13.7 Safety Health and Welfare.pdf [PDF]
- Ch 14 Interactions of the above.pdf [PDF]
- Ch 15 Mitigation Measures and Monitoring Proposals.pdf [PDF]
- Vol 2C Appendices to EIS
- Appendix 1
- Appendix 10
- Appendix 11
- Appendix 12
- Appendix 13
- Appendix 14
- Appendix 15
- Appendix 2
- 2.2.1 DKM Business Case Report
- 2.3.1 ABP Consultations
- ABP 1st Consultation - Record 1 - 180607.pdf [PDF]
- ABP 1st Consultation - Record 2 - 051207.pdf [PDF]
- ABP 1st Consultation - Record 3 - 070510.pdf [PDF]
- ABP 1st Consultation - Record 4 - 180810.pdf [PDF]
- ABP 2nd Consultation record 1 01.10.2012.pdf [PDF]
- ABP 2nd Consultation record 2 15.01.2013.pdf [PDF]
- ABP 2nd Consultation record 3 24.04.2013.pdf [PDF]
- ABP 2nd Consultation record 4 11.07.2013.pdf [PDF]
- 2.3.2 SID Determinations
- 2.3.3 Scoping Submitted
- 2.3.4 Scoping Report
- 2.3.5 Consultees Responses to Scoping
- 2.3.6 List of Presribed Bodies
- 2.3.7 List of Consultations
- 2.3.8 Public Consulltation Posters
- Appendix 3
- Appendix 4
- App 4.1 Cover Letter.pdf [PDF]
- Appendix 4.1 Waste Management Plan.pdf [PDF]
- Appendix 4.2 Environmental Management Framework.pdf [PDF]
- Appendix 4.3 Oil Spill Contingency Plan.pdf [PDF]
- Appendix 4.4 Galfire Plan.pdf [PDF]
- Appendix 4.5 Port bye laws.pdf [PDF]
- Appendix 4.6 G. Evans Report on Safety Protocols.pdf [PDF]
- Appendix 4.7 Civil Works Design Report.pdf [PDF]
- Appendix 5
- Appendix 6
- Appendix 7
- Appendix 8
- Appendix 9
- Appendix 1
- Vol 2D Drawings - See Main Drawings Folder
- Environmental
- Féach ar dhoiciméid ghaolmhara
-
FurtherInformation
- Féach ar dhoiciméid ghaolmhara
- 01 - EIS Addendum Vol. 1 - Main EIS Chapters
- CH01 - Introduction & Background.pdf [PDF]
- CH02 - Planning & Policy Context.pdf [PDF]
- CH03 - Alternatives.pdf [PDF]
- CH04 - Description of Development.pdf [PDF]
- CH05 - Human Beings.pdf [PDF]
- CH06 - Soils.pdf [PDF]
- CH07 - Flora & Fauna.pdf [PDF]
- CH08 - Water.pdf [PDF]
- CH09 - Air Quality.pdf [PDF]
- CH10 - Noise & Vibration.pdf [PDF]
- CH11 - Climatic Factors.pdf [PDF]
- CH12 - Landscape & Visual.pdf [PDF]
- CH13.1 - Architectural & Cultural.pdf [PDF]
- CH13.2 - Archaeology.pdf [PDF]
- CH13.3 - Rail.pdf [PDF]
- CH13.4 - Road Traffic & Infrastructure.pdf [PDF]
- CH13.5 - Mobility Management Framework.pdf [PDF]
- CH13.6 - Risk Assessment.pdf [PDF]
- CH13.7 - Safety, Health & Welfare.pdf [PDF]
- CH14 - Interactions.pdf [PDF]
- 02 - EIS Addendum Vol. 2 - Appendices Part 1 of 2
- 03 - EIS Addendum Vol. 2 - Appendices Part 2 of 2
- Appendix 10.1 to 10.15 - Noise.pdf [PDF]
- Appendix 11.1 - Carbon Assessment LCA_RevA_20240712.pdf [PDF]
- Appendix 11.2 and 11.3 Climate Agreements and Mitigations.pdf [PDF]
- Appendix 13.4.1 - Traffic Counts 2022.pdf [PDF]
- Appendix 13.4.2 - Traffic Counts 2010.pdf [PDF]
- Appendix 13.6.1 - Comah Land Use Assessment.pdf [PDF]
- Appendix 4.1 - 2139-2117 Site Layout Map.pdf [PDF]
- Appendix 6.1 HS24007 Part 1.pdf [PDF]
- Appendix 6.2 HS24007 Part 2.pdf [PDF]
- Appendix 7.1 Intertidal Renmore June 2023.pdf [PDF]
- Appendix 7.10 Invasive Species Management Plan.pdf [PDF]
- Appendix 7.2 Renmore stony bank report.pdf [PDF]
- Appendix 7.3 Galway Bay Subtidal Survey 2023.pdf [PDF]
- Appendix 7.4 Intertidal Renmore 2016.pdf [PDF]
- Appendix 7.5 Bird Report Gittings - GALWAY HARBOUR EXTENSION WATERBIRD SURVEY, WINTER.pdf [PDF]
- Appendix 7.6 Marine Mammal Observer Report.pdf [PDF]
- Appendix 7.7 Marine Mammal Desk Study.pdf [PDF]
- Appendix 7.8 MKO-Bat Report 2023.07.13.pdf [PDF]
- Appendix 7.9 Lagoons Report Final.pdf [PDF]
- Appendix 8.1 HS24007 Part 1.pdf [PDF]
- Appendix 8.2 HS24007 Part 2.pdf [PDF]
- Appendix 9.1 - Dust Management Plan.pdf [PDF]
- 04 - NIS Addendum
- Natura Impact Statement Addendum 2024.pdf [PDF]
- NIS Appendices
- NIS App A - Intertidal Renmore June 2023.pdf [PDF]
- NIS App B - Galway Bay Subtidal Survey 2023.pdf [PDF]
- NIS App C - Marine Mammal Studies.pdf [PDF]
- NIS App D - Lagoons Report Final.pdf [PDF]
- NIS App E - MKO-BR F - 210130 - 2023.07.13.pdf [PDF]
- NIS App F - Renmore stony bank report- John Conaghan Report.pdf [PDF]
- NIS App G - ISMP- F1- 240528- 05.09.2024- RM.pdf [PDF]
- NIS App H -Gittings - GALWAY HARBOUR EXTENSION WATERBIRD SURVEY, WINTER.pdf [PDF]
- NIS App I-1 - GHE NPWS ABP Response Report 22072022.pdf [PDF]
- NIS App I-2 - GHE CMP 22072022.pdf [PDF]
- NIS App I-3 - GHE NIS 26072022.pdf [PDF]
- NIS App I-4 - HLG 00090-24 Signed Letter to ABP - Niamh Thornton.pdf [PDF]
- NIS App I-5 - HLG 00090-24 Appendix 1 Letter from Minister Noonan re Compensatory Measures.pdf [PDF]
- NIS App I-6 - ABP Letter March 2021 Statement of Case.pdf [PDF]
- 7476 270924 GHE Issued ABP.pdf [PDF]
- Applicant response to FI Submissions
- 01 - EIS Addendum Vol. 1 - Main EIS Chapters
- Féach ar dhoiciméid ghaolmhara
If this case is not decided you may be able to make an observation , please note the case number and get further information here.
Legend
- Live Case
- Granted
- Refused
- Invalid
- Withdrawn
- See Case for further detail