An Coimisiún Pleanála - Tagairt an cháis: PA61.PA0033
Renmore and Townparks Townlands, Galway
Comhairle Cathrach na Gaillimhe
Cur síos
Galway Harbour Extension
Cineál Cáis
Forbairt Phríobháideach – Iarratas
Cinneadh
Grant Perm. w Conditions
Dáta an tsínithe
07/04/2026
TMTT
Tá
RTN
Tá
Stair
-
07/04/2026
Grant Perm. w Conditions
-
10/01/2014
Lodged
Doiciméid
-
Case Documentation
- View associated documents
- 7476-270924-GHE-Cover-Letter-Issued-ABP-2 (1).pdf [PDF]
- Applicant Documents
- 00. Correspondence
- 2014
- 2016
- 02.12.16 -Notification of tripartite meeting on 13.12.16 to Tobin Consulting Engineers - DAU.pdf [PDF]
- 05.09.16 - Acknowledgement of letter receiverd on 01.09.16 from Tobin Consulting Engineers.pdf [PDF]
- 09.12.16 - Acknowledgement of meeting on 13.12.16 from Tobin Consulting Engineers.pdf [PDF]
- 11.10.16 - Acknowledgement of letter receiverd on 15.10.16 from Tobin Consulting Engineers.pdf [PDF]
- 20.09.16 - Acknowledgement of letter received on 15.09.16 from Tobin Consulting Engineers.pdf [PDF]
- 21.04.16 - Responce to queries to Tobin Consulting Engineers.pdf [PDF]
- 27.10.16 - Acknowledgement of letters receiverd on the 20th 21st and 27.10.16 from Tobin Consulting Engineers.pdf [PDF]
- 2017
- 2019
- 2020
- 2021
- 01.07.21 - ABP Response to applicants request for update re IROPI.pdf [PDF]
- 03.11.21 - Email Correspondence (Granting Further Time Extension on NPWS response).pdf [PDF]
- 13.12.21 - Email correspondence and letter requesting time extension (on NPWS response).pdf [PDF]
- 15.11.21 - Email Correspondence (Granting Further Time Extension on NPWS response).pdf [PDF]
- 15.12.21 - Letter from applicant requesting time extension to respond to NPWS submission.pdf [PDF]
- 16.11.21 - Letter from applicant requesting time extension re NPWS response.pdf [PDF]
- 18.06.21 - Letter from Applicant requesting case update.pdf [PDF]
- 24.02.21 - Request for time extension on response to NPWS submission.pdf [PDF]
- 28.07.21 - Letter from applicant requesting case update.pdf [PDF]
- 2022
- 07.09.22 - Time extension request and approval until 24th October 2022.pdf [PDF]
- 14.06.22 - Further Tobin request for time extension on response to NPWS submission.pdf [PDF]
- 15.06.22 - Applicant email regarding engagement with NPWS.pdf [PDF]
- 20.04.22 - Email from applicant re engagement with NPWS & landowners.pdf [PDF]
- 20.04.22 - Further request for time extension on response to NPWS submission.pdf [PDF]
- 24.02.22 - Email Correspondence from applicant.pdf [PDF]
- 2023
- 2024
- 01. Application Documents
- 04. Newspaper Notice 1 - Independent.pdf [PDF]
- Application Cover Letter - received 10.01.2014.pdf [PDF]
- Environmental
- Vol 2A Non Technical Summary
- Vol 2B Main EIS
- Ch 01 Introduction and Background.pdf [PDF]
- Ch 02 Project Context - Planning and Business Case.pdf [PDF]
- Ch 03 Alternatives.pdf [PDF]
- Ch 04 Description of Development.pdf [PDF]
- Ch 05 Human Beings and Socio Economic.pdf [PDF]
- Ch 06 Soils.pdf [PDF]
- Ch 07 Flora and Fauna.pdf [PDF]
- Ch 08 Water.pdf [PDF]
- Ch 09 Air Quality.pdf [PDF]
- Ch 10 Noise and Vibration.pdf [PDF]
- Ch 11 Climatic Factors.pdf [PDF]
- Ch 12 The Landscape and Visual.pdf [PDF]
- Ch 13.1 Architectural Cultural and Architectural Study.pdf [PDF]
- Ch 13.2 Archaeological.pdf [PDF]
- Ch 13.3 Rail.pdf [PDF]
- Ch 13.4 Road Traffic and Infrastructure.pdf [PDF]
- Ch 13.5 Mobility Management Programme.pdf [PDF]
- Ch 13.6 Risk Assessment.pdf [PDF]
- Ch 13.7 Safety Health and Welfare.pdf [PDF]
- Ch 14 Interactions of the above.pdf [PDF]
- Ch 15 Mitigation Measures and Monitoring Proposals.pdf [PDF]
- Vol 2C Appendices to EIS
- Appendix 1
- Appendix 10
- Appendix 11
- Appendix 12
- Appendix 13
- Appendix 14
- Appendix 15
- Appendix 2
- 2.2.1 DKM Business Case Report
- 2.3.1 ABP Consultations
- ABP 1st Consultation - Record 1 - 180607.pdf [PDF]
- ABP 1st Consultation - Record 2 - 051207.pdf [PDF]
- ABP 1st Consultation - Record 3 - 070510.pdf [PDF]
- ABP 1st Consultation - Record 4 - 180810.pdf [PDF]
- ABP 2nd Consultation record 1 01.10.2012.pdf [PDF]
- ABP 2nd Consultation record 2 15.01.2013.pdf [PDF]
- ABP 2nd Consultation record 3 24.04.2013.pdf [PDF]
- ABP 2nd Consultation record 4 11.07.2013.pdf [PDF]
- 2.3.2 SID Determinations
- 2.3.3 Scoping Submitted
- 2.3.4 Scoping Report
- 2.3.5 Consultees Responses to Scoping
- 2.3.6 List of Presribed Bodies
- 2.3.7 List of Consultations
- 2.3.8 Public Consulltation Posters
- Appendix 3
- Appendix 4
- App 4.1 Cover Letter.pdf [PDF]
- Appendix 4.1 Waste Management Plan.pdf [PDF]
- Appendix 4.2 Environmental Management Framework.pdf [PDF]
- Appendix 4.3 Oil Spill Contingency Plan.pdf [PDF]
- Appendix 4.4 Galfire Plan.pdf [PDF]
- Appendix 4.5 Port bye laws.pdf [PDF]
- Appendix 4.6 G. Evans Report on Safety Protocols.pdf [PDF]
- Appendix 4.7 Civil Works Design Report.pdf [PDF]
- Appendix 5
- Appendix 6
- Appendix 7
- Appendix 8
- Appendix 9
- Appendix 1
- Vol 2D Drawings - See Main Drawings Folder
- Galway Harbour Extension Master Template.pdf [PDF]
- PA0033 Applicant Dept TTS JPKSG.pdf [PDF]
- PA0033 Letters Re Notification of Applicaton to Irish Water.pdf [PDF]
- Planning
- Vol 1A Planning Application Documents
- 0 - Letter to An Bord Pleanala.pdf [PDF]
- 1 - Planning Application Form.pdf [PDF]
- 10 - Notice to Prescribed Bodies.pdf [PDF]
- 2 - Schedule of Drawings.pdf [PDF]
- 3 - Galway Harbour Land Ownership Maps.pdf [PDF]
- 4 - Letters of Consent.pdf [PDF]
- 5 - Newspapers Notices.pdf [PDF]
- 7 - Location Map for Site Notices.pdf [PDF]
- 8 - Schedule of Consultations.pdf [PDF]
- 9 - Letter to Local Authority.pdf [PDF]
- Vol 1B Planning Report
- Vol 1C Natura Impact Statement
- Vol 1D - See Main Drawings Folder
- Vol 1A Planning Application Documents
- Planning and Environmental Drawings
- Drawing Index Sheet.pdf [PDF]
- Drawings
- 01-0110 Harbour Company Offices.pdf [PDF]
- 02-0110 Cruise Terminal Building.pdf [PDF]
- 03-0110 Marina Management Building and Screen Wall.pdf [PDF]
- 04-0110 Harbour Management Building.pdf [PDF]
- 05-0110 Ancillary Buildings Plans Elevations and Section.pdf [PDF]
- 06-0110 Visual Envelope and Refined Study.pdf [PDF]
- 07-0110 Visbility Map.pdf [PDF]
- 08-0110 Landscape Character Areas.pdf [PDF]
- 2139-2101 Main Ports of Ireland.pdf [PDF]
- 2139-2102 Galway Bay Context.pdf [PDF]
- 2139-2103 Admiralty Map showing Navigation Route.pdf [PDF]
- 2139-2104 Galway Bay Conservation Areas (cSAC).pdf [PDF]
- 2139-2105 Galway Bay Special Protection Areas (SPA).pdf [PDF]
- 2139-2106 Galway Bay Proposed Natural Heritage Areas (pNHA).pdf [PDF]
- 2139-2107 cSAC within Enterprise Park and Harbour Extension.pdf [PDF]
- 2139-2108 pNHA within Enterprise Park and Harbour Extension.pdf [PDF]
- 2139-2109 SPA within Enterprise Park and Harbour Extension.pdf [PDF]
- 2139-2110 Terrestrial Habitats within Harbour Extension.pdf [PDF]
- 2139-2111 Marine Habitats within Harbour Extension.pdf [PDF]
- 2139-2112 General Arrangement Map and Grid.pdf [PDF]
- 2139-2112 General Arrangement Map and Grid.pdf [PDF]
- 2139-2113 Site Location Map showing Application Lands and Site Notices.pdf [PDF]
- 2139-2114 Map showing Lands Owned or Occupied by Galway Harbour Company.pdf [PDF]
- 2139-2115 Map showing Ownership of Application Lands.pdf [PDF]
- 2139-2116 Exsting Docks Map.pdf [PDF]
- 2139-2117 Site Layout Map.pdf [PDF]
- 2139-2118 Habitat Map showing GHEP Lands pre 1990.pdf [PDF]
- 2139-2121 Site Layout Plan.pdf [PDF]
- 2139-2122 Details of Site Layout Sheet 1 of 4.pdf [PDF]
- 2139-2123 Details of Site Layout Sheet 2 of 4.pdf [PDF]
- 2139-2124 Details of Site Layout Sheet 3 of 4.pdf [PDF]
- 2139-2125 Details of Site Layout Sheet 4 of 4.pdf [PDF]
- 2139-2127 Proposed Land Use.pdf [PDF]
- 2139-2128 Port Security Plan.pdf [PDF]
- 2139-2129 Escape Route Layout Plan.pdf [PDF]
- 2139-2131 Open Space Layout Plan.pdf [PDF]
- 2139-2132 Cycle Lanes and Link Paths.pdf [PDF]
- 2139-2133 Lighting Layout Plan.pdf [PDF]
- 2139-2134 Navigation Layout Plan.pdf [PDF]
- 2139-2135 Ship Manoeuvring Plan.pdf [PDF]
- 2139-2136 Site Investigation Exploratory Holes Layout Plan.pdf [PDF]
- 2139-2141 Stages of Construction.pdf [PDF]
- 2139-2142 Construction Cross Sections Sheet 1 of 2.pdf [PDF]
- 2139-2143 Construction Cross Sections Sheet 2 of 2.pdf [PDF]
- 2139-2144 Quay Wall Details.pdf [PDF]
- 2139-2145 Construction Sequencing Sheet 1 of 9.pdf [PDF]
- 2139-2146 Construction Sequencing Sheet 2 of 9.pdf [PDF]
- 2139-2147 Construction Sequencing Sheet 3 of 9.pdf [PDF]
- 2139-2148 Construction Sequencing Sheet 4 of 9.pdf [PDF]
- 2139-2149 Construction Sequencing Sheet 5 of 9.pdf [PDF]
- 2139-2150 Construction Sequencing Sheet 6 of 9.pdf [PDF]
- 2139-2151 Construction Sequencing Sheet 7 of 9.pdf [PDF]
- 2139-2152 Construction Sequencing Sheet 8 of 9.pdf [PDF]
- 2139-2153 Construction Sequencing Sheet 9 of 9.pdf [PDF]
- 2139-2154 Cross Sections Sheet 1 of 2.pdf [PDF]
- 2139-2155 Cross Sections Sheet 2 of 2.pdf [PDF]
- 2139-2161 Marina Layout Plan and Cross Section.pdf [PDF]
- 2139-2162 Nautical Slipway Plan and Sections.pdf [PDF]
- 2139-2163 Access Steps to Water Plan and Section.pdf [PDF]
- 2139-2164 Fishing Pier Plan and Section.pdf [PDF]
- 2139-2165 Layout of Access Junction.pdf [PDF]
- 2139-2166 Layout Plan of Enterprise Park Bridge.pdf [PDF]
- 2139-2167 Bridge Crossing Plan Elevation and Section.pdf [PDF]
- 2139-2168 Survey of Existing Lough Atalia Bridge and Road.pdf [PDF]
- 2139-2169 Lough Atalia Bridge Road Realignment and Storm Drainage.pdf [PDF]
- 2139-2170 Lough Atalia Bridge Plan and Elevations.pdf [PDF]
- 2139-2171 Lough Atalia Bridge Typical Road Sections.pdf [PDF]
- 2139-2172 Road Construction Cross Sections.pdf [PDF]
- 2139-2173 Auto-Track Analysis Site Access Junction.pdf [PDF]
- 2139-2174 Auto-Track Analysis Internal Layout Sheet 1 of 4.pdf [PDF]
- 2139-2175 Auto-Track Analysis Internal Layout Sheet 2 of 4.pdf [PDF]
- 2139-2176 Auto-Track Analysis Internal Layout Sheet 3 of 4.pdf [PDF]
- 2139-2177 Auto-Track Analysis Internal Layout Sheet 4 of 4.pdf [PDF]
- 2139-2178 Construction Traffic Haulage Routes.pdf [PDF]
- 2139-2179 Lough Atalia Bridge Closure Diversion Route.pdf [PDF]
- 2139-2180 Operational Traffic Proposed Haulage Routes.pdf [PDF]
- 2139-2181 Rail Link Layout Plan.pdf [PDF]
- 2139-2182 Rail Link Longitudinal Section.pdf [PDF]
- 2139-2183 Rail Link Cross Sections.pdf [PDF]
- 2139-2184 Fire Water Bund Layout Plan.pdf [PDF]
- 2139-2185 Fire Water Bund Cross Sections.pdf [PDF]
- 2139-2186 Oil Jetty Plan and Sections.pdf [PDF]
- 2139-2187 Duct Chamber Plan and Section.pdf [PDF]
- 2139-2188 Evacuation Station Plan and Section.pdf [PDF]
- 2139-2189 Detail of Security Fence and Gate.pdf [PDF]
- 2139-2190 Site Layout of Marina Management Building and Harbour Warehouse Building.pdf [PDF]
- 2139-2191 Site Layout of Cruise Terminal Building and Harbour Offices.pdf [PDF]
- 2139-2192 Details of Temporary Wheelwash.pdf [PDF]
- 2139-2193 Cargo Ship Mooring Arrangement Layout.pdf [PDF]
- 2139-2194 Oil Bitumen Tanker Mooring Arrangement Layout.pdf [PDF]
- 2139-2195 Bunded Refuelling Tank.pdf [PDF]
- 2139-2196 Quay Wall Breakwater Elevations Sheet 1 of 2.pdf [PDF]
- 2139-2197 Quay Wall Breakwater Elevations Sheet 2 of 2.pdf [PDF]
- 2139-2198 Wave Wall Details Sheet 1 of 2.pdf [PDF]
- 2139-2199 Wave Wall Details Sheet 2 of 2.pdf [PDF]
- 2139-2200 Layout Plan of Spill and Waste Control.pdf [PDF]
- 2139-2201 Watermain Layout Plan.pdf [PDF]
- 2139-2202 Watermain Layout Sheet 1 of 4.pdf [PDF]
- 2139-2203 Watermain Layout Sheet 2 of 4.pdf [PDF]
- 2139-2204 Watermain Layout Sheet 3 of 4.pdf [PDF]
- 2139-2205 Watermain Layout Sheet 4 of 4.pdf [PDF]
- 2139-2206 Watermain Chambers and Road Gulley Details.pdf [PDF]
- 2139-2207 Foul Sewer Layout Key Plan.pdf [PDF]
- 2139-2208 Foul Sewer Layout Sheet 1 of 3.pdf [PDF]
- 2139-2209 Foul Sewer layout Sheet 2 of 3.pdf [PDF]
- 2139-2210 Foul Sewer Layout Sheet 3 of 3.pdf [PDF]
- 2139-2211 Longitudinal Foul Sections Sheet 1 of 2.pdf [PDF]
- 2139-2212 Longitudinal Foul Sections Sheet 2 of 2.pdf [PDF]
- 2139-2213 Details of Foul Sewage Pumping Station.pdf [PDF]
- 2139-2214 Storm Drainage Layout Plan.pdf [PDF]
- 2139-2215 Storm Drainage Network A.pdf [PDF]
- 2139-2216 Storm Drainage Network B.pdf [PDF]
- 2139-2217 Storm Drainage Network C.pdf [PDF]
- 2139-2218 Storm Drainage Network D.pdf [PDF]
- 2139-2219 Longitudinal Storm Section Sheet 1 of 5.pdf [PDF]
- 2139-2220 Longitudinal Storm Section Sheet 2 of 5.pdf [PDF]
- 2139-2221 Longitudinal Storm Section Sheet 3 of 5.pdf [PDF]
- 2139-2222 Longitudinal Storm Section Sheet 4 of 5.pdf [PDF]
- 2139-2223 Longitudinal Storm Section Sheet 5 of 5.pdf [PDF]
- 2139-2224 Petrol Interceptor Detail.pdf [PDF]
- 2139-2225 Detail of Stormwater Outfall.pdf [PDF]
- 2139-2226 Detail of Manholes.pdf [PDF]
- 2139-2227 Saltwater and Firefighting Main Key Plan.pdf [PDF]
- 2139-2228 Saltwater Firefighting Main Sheet 1 of 4.pdf [PDF]
- 2139-2229 Saltwater Firefighting Main Sheet 2 of 4.pdf [PDF]
- 2139-2230 Saltwater Firefighting Main Sheet 3 of 4.pdf [PDF]
- 2139-2231 Saltwater Firefighting Main Sheet 4 of 4.pdf [PDF]
- 2139-2232 Utilities Layout Plan.pdf [PDF]
- 2139-2233 Layout Plan of Waste Reception Facilities.pdf [PDF]
- FIG 1 Landscape Master Plan.pdf [PDF]
- FIG 2 Environmental Circulation Pattern.pdf [PDF]
- FIG 3 Detail Area 1.pdf [PDF]
- FIG 4 Detail Area 2.pdf [PDF]
- FIG 5 Landscape Detail and Section A-A.pdf [PDF]
- FIG 6 Section C-C.pdf [PDF]
- FIG 7 Planting Detail.pdf [PDF]
- LS12090-1 Proposed Lighting Key Plan Sheet 1 of 4.pdf [PDF]
- LS12090-2 Proposed Lighting Sheet 2 of 4.pdf [PDF]
- LS12090-3 Proposed Lighting Sheet 3 of 4.pdf [PDF]
- LS12090-4 Proposed Lighting Sheet 4 of 4.pdf [PDF]
- LS12090-5 Lighting Columns.pdf [PDF]
- Model 1 Ground Level View North Eastwards.pdf [PDF]
- Model 2 Elevated View Northwards.pdf [PDF]
- Model 3 Ground Level View from Passenger Terminal.pdf [PDF]
- Model 4 Elevated View North Westward.pdf [PDF]
- Model 5 Elevated View South Eastward.pdf [PDF]
- Model 6 Ground Level View of Parkland Link.pdf [PDF]
- Plate 0 Photomontage Viewpoint Locations.pdf [PDF]
- Plate 1 Circular Road and Letteragh.pdf [PDF]
- Plate 10 Dock Road.pdf [PDF]
- Plate 11 Lough Atalia Railway Bridge.pdf [PDF]
- Plate 12 Railway Line Renmore.pdf [PDF]
- Plate 13 Mellows Park Renmore.pdf [PDF]
- Plate 14 Hawthorn Drive Renmore.pdf [PDF]
- Plate 15 Ballyloughan Road Ballyloughan.pdf [PDF]
- Plate 16 Roscam.pdf [PDF]
- Plate 17 Grattan Road Claddagh (Night View).pdf [PDF]
- Plate 18 The Long Walk (Night View).pdf [PDF]
- Plate 19 Mellows Park Renmore (Night View).pdf [PDF]
- Plate 2 Seapoint and Salthill.pdf [PDF]
- Plate 20 Hawthorn Drive Renmore (Night View).pdf [PDF]
- Plate 21 Stage 1 of Construction.pdf [PDF]
- Plate 22 Stage 2 of Construction.pdf [PDF]
- Plate 23 Stage 3 of Construction.pdf [PDF]
- Plate 24 Stage 4 of Construction.pdf [PDF]
- Plate 3 Mutton Island Causeway.pdf [PDF]
- Plate 4 South Park and Claddagh.pdf [PDF]
- Plate 5 Grattan Road and Claddagh.pdf [PDF]
- Plate 6 Nimmos Pier.pdf [PDF]
- Plate 7 Claddagh Basin.pdf [PDF]
- Plate 8 The Long Walk.pdf [PDF]
- Plate 9 The Roof of the Hynes Car Park Dock Road.pdf [PDF]
- 02. Further Information - 2014
- 1 Response to RFI 2014
- 2 Appendices to Response to RFI
- 3 NIS Addendum-Errata
- 4 Appendices to NIS Addendum-Errata
- 1 Appendices 2.1 to 2.9 to NIS Addendum-Errata.pdf [PDF]
- 2 Appendix 3.1 Potential Impacts and Mitigation.pdf [PDF]
- 3 Appendix 3.2 Chapter 8 from original EIS.pdf [PDF]
- 4 Appendices 3.3.pdf [PDF]
- 5 Appendices 3.4 Bird Species Assessment.pdf [PDF]
- 6 Appendix 3.5 Oil Spill Contingency.pdf [PDF]
- 7 Appendix 3.6 Galfire Emergency Plan.pdf [PDF]
- 8 Appendix 3.7 Environmental Management Framework.pdf [PDF]
- 5 EIS Addenda-Errata to Chapters
- PA0033.FI.NOTICES.pdf [PDF]
- PA0033.FI.NOTIFICATIONS.pdf [PDF]
- Time Extension Request received.pdf [PDF]
- 03. Further Information Response - 2015
- Cover Documents Received with Proposed Compensatory Measures.pdf [PDF]
- Cover letter for GIS shape file - 17.11.2016.pdf [PDF]
- PA0033 Email 01-10-15 to NPWS.pdf [PDF]
- PA0033 Email 05-10-15 from NPWS.pdf [PDF]
- PA0033 Letter 10-11-15 to NPWS.pdf [PDF]
- Proposed Compensatory Measures - November 2015.pdf [PDF]
- 04. Compensatory Measures - Tripartite Meeting Documents - 2016
- FW 7476 - GHE Compensatory Measures - Tripartite Meeting 13.12.2016 (Pl Ref PA 61.0033) Email 1 of 4.pdf [PDF]
- FW 7476 - GHE Compensatory Measures - Tripartite Meeting 13.12.2016 (Pl Ref PA 61.0033) Email 2 of 4.pdf [PDF]
- FW 7476 - GHE Compensatory Measures - Tripartite Meeting 13.12.2016 (Pl Ref PA 61.0033) Email 3 of 4.pdf [PDF]
- FW 7476 - GHE Compensatory Measures - Tripartite Meeting 13.12.2016 (Pl Ref PA 61.0033) Email 4 of 4.pdf [PDF]
- FW 7476 - GHE Compensatory measures V2.1 - Tripartite meeting 13.12.16 (Pl Ref PA 61.0033) Cover Letter.pdf [PDF]
- PA0033 Notification of Comp Measures issued to ABP.pdf [PDF]
- 05. Compensatory Measures Documents - 2017
- FW 7476 Galway Harbour Extension Compensatory Measures Report V2.2 280217 . Your Ref. 61.PA0033.pdf [PDF]
- PA0033 - Map - Renmore - Mweeloon Comparison of Areas.pdf [PDF]
- PA0033 7476 BOC 10.11.15 Compensatory Report Aquafact.pdf [PDF]
- PA0033 Proposed Compensatory Measures V2.3B Aug 17.pdf [PDF]
- PA0033 Proposed Compensatory Measures V2.3B Cover Letter to NPWS.pdf [PDF]
- PA0033 Proposed Compensatory Measures V2.3B Cover Letter to ABP.pdf [PDF]
- PA0033 Proposed Compensatory Measures V2.3B Summary.pdf [PDF]
- 06. Final Compensatory Measures Report - 2019
- Compensatory Report 2019 - Review Comments - Reply to Further Information.pdf [PDF]
- PA0033 - Addendum to NIS to include Consideration of Compensatory Meaures (4).pdf [PDF]
- PA0033 - CMR - Appendix 1.pdf [PDF]
- PA0033 - CMR - Appendix 2.pdf [PDF]
- PA0033 - CMR - Appendix 3.pdf [PDF]
- PA0033 - CMR Appendices
- Appendix No 1.pdf [PDF]
- Appendix No 10.pdf [PDF]
- Appendix No 11.pdf [PDF]
- Appendix No 12.pdf [PDF]
- Appendix No 13.pdf [PDF]
- Appendix No 14.pdf [PDF]
- Appendix No 15.pdf [PDF]
- Appendix No 16.pdf [PDF]
- Appendix No 17.pdf [PDF]
- Appendix No 18.pdf [PDF]
- Appendix No 19.pdf [PDF]
- Appendix No 2.pdf [PDF]
- Appendix No 20.pdf [PDF]
- Appendix No 21.pdf [PDF]
- Appendix No 3.pdf [PDF]
- Appendix No 4.pdf [PDF]
- Appendix No 5.pdf [PDF]
- Appendix No 6.pdf [PDF]
- Appendix No 7.pdf [PDF]
- Appendix No 8.pdf [PDF]
- Appendix No 9.pdf [PDF]
- PA0033 - Compensatory Measures Report.pdf [PDF]
- PA0033 - Cover Letter enclosing Compensatory Measures Report - April 2019.pdf [PDF]
- PA0033 - GHC-Compensatory Measures Report 2019.pdf [PDF]
- 07. Compensatory Measures Proposal Response - 2019
- 08. Compensatory Measures Proposal Response - 2022
- 09. Further Information - 2024
- ABP-PA0033-24 - Further Information Cover Letter.pdf [PDF]
- PA0033 - Galway Harbour Extension - September 2024
- 01 - EIS Addendum Vol. 1 - Main EIS Chapters
- CH01 - Introduction & Background.pdf [PDF]
- CH02 - Planning & Policy Context.pdf [PDF]
- CH03 - Alternatives.pdf [PDF]
- CH04 - Description of Development.pdf [PDF]
- CH05 - Human Beings.pdf [PDF]
- CH06 - Soils.pdf [PDF]
- CH07 - Flora & Fauna.pdf [PDF]
- CH08 - Water.pdf [PDF]
- CH09 - Air Quality.pdf [PDF]
- CH10 - Noise & Vibration.pdf [PDF]
- CH11 - Climatic Factors.pdf [PDF]
- CH12 - Landscape & Visual.pdf [PDF]
- CH13.1 - Architectural & Cultural.pdf [PDF]
- CH13.2 - Archaeology.pdf [PDF]
- CH13.3 - Rail.pdf [PDF]
- CH13.4 - Road Traffic & Infrastructure.pdf [PDF]
- CH13.5 - Mobility Management Framework.pdf [PDF]
- CH13.6 - Risk Assessment.pdf [PDF]
- CH13.7 - Safety, Health & Welfare.pdf [PDF]
- CH14 - Interactions.pdf [PDF]
- 01A - Connacht Tribune 06.12.2024.pdf [PDF]
- 01B - Irish Independent 06.12.2024.pdf [PDF]
- 02 - EIS Addendum Vol. 2 - Appendices Part 1 of 2
- 02 - Galway Harbour Site Notice 06.12.2024.pdf [PDF]
- 03 - EIS Addendum Vol. 2 - Appendices Part 2 of 2
- Appendix 10.1 to 10.15 - Noise.pdf [PDF]
- Appendix 11.1 - Carbon Assessment LCA_RevA_20240712.pdf [PDF]
- Appendix 11.2 and 11.3 Climate Agreements and Mitigations.pdf [PDF]
- Appendix 13.4.1 - Traffic Counts 2022.pdf [PDF]
- Appendix 13.4.2 - Traffic Counts 2010.pdf [PDF]
- Appendix 13.6.1 - Comah Land Use Assessment.pdf [PDF]
- Appendix 4.1 - 2139-2117 Site Layout Map.pdf [PDF]
- Appendix 6.1 HS24007 Part 1.pdf [PDF]
- Appendix 6.2 HS24007 Part 2.pdf [PDF]
- Appendix 7.1 Intertidal Renmore June 2023.pdf [PDF]
- Appendix 7.10 Invasive Species Management Plan.pdf [PDF]
- Appendix 7.2 Renmore stony bank report.pdf [PDF]
- Appendix 7.3 Galway Bay Subtidal Survey 2023.pdf [PDF]
- Appendix 7.4 Intertidal Renmore 2016.pdf [PDF]
- Appendix 7.5 Bird Report Gittings - GALWAY HARBOUR EXTENSION WATERBIRD SURVEY, WINTER.pdf [PDF]
- Appendix 7.6 Marine Mammal Observer Report.pdf [PDF]
- Appendix 7.7 Marine Mammal Desk Study.pdf [PDF]
- Appendix 7.8 MKO-Bat Report 2023.07.13.pdf [PDF]
- Appendix 7.9 Lagoons Report Final.pdf [PDF]
- Appendix 8.1 HS24007 Part 1.pdf [PDF]
- Appendix 8.2 HS24007 Part 2.pdf [PDF]
- Appendix 9.1 - Dust Management Plan.pdf [PDF]
- 03 - GHE Letters Galway City Council 06.12.2024.pdf [PDF]
- 04 - GHE Letters Prescribed Bodies 06.12.2024.pdf [PDF]
- 04 - NIS Addendum
- Natura Impact Statement Addendum 2024.pdf [PDF]
- NIS Appendices
- NIS App A - Intertidal Renmore June 2023.pdf [PDF]
- NIS App B - Galway Bay Subtidal Survey 2023.pdf [PDF]
- NIS App C - Marine Mammal Studies.pdf [PDF]
- NIS App D - Lagoons Report Final.pdf [PDF]
- NIS App E - MKO-BR F - 210130 - 2023.07.13.pdf [PDF]
- NIS App F - Renmore stony bank report- John Conaghan Report.pdf [PDF]
- NIS App G - ISMP- F1- 240528- 05.09.2024- RM.pdf [PDF]
- NIS App H -Gittings - GALWAY HARBOUR EXTENSION WATERBIRD SURVEY, WINTER.pdf [PDF]
- NIS App I-1 - GHE NPWS ABP Response Report 22072022.pdf [PDF]
- NIS App I-2 - GHE CMP 22072022.pdf [PDF]
- NIS App I-3 - GHE NIS 26072022.pdf [PDF]
- NIS App I-4 - HLG 00090-24 Signed Letter to ABP - Niamh Thornton.pdf [PDF]
- NIS App I-5 - HLG 00090-24 Appendix 1 Letter from Minister Noonan re Compensatory Measures.pdf [PDF]
- NIS App I-6 - ABP Letter March 2021 Statement of Case.pdf [PDF]
- 06.12.24 - 7476 06122024 GHE Issued ABP re Publication.pdf [PDF]
- 09.12.24 - PA0033 - Response - Galway Harbour Extension.pdf [PDF]
- 27.09.24 - 7476 270924 GHE Issued ABP.pdf [PDF]
- 01 - EIS Addendum Vol. 1 - Main EIS Chapters
- 10. Response to Submissions - 2025
- Compensatory Measures Drawing - Renmore - Mweeloon Comparison of Areas
- Environmental
- Vol 2A Non Technical Summary
- Vol 2B Main EIS
- Ch 01 Introduction and Background.pdf [PDF]
- Ch 02 Project Context - Planning and Business Case.pdf [PDF]
- Ch 03 Alternatives.pdf [PDF]
- Ch 04 Description of Development.pdf [PDF]
- Ch 05 Human Beings and Socio Economic.pdf [PDF]
- Ch 06 Soils.pdf [PDF]
- Ch 07 Flora and Fauna.pdf [PDF]
- Ch 08 Water.pdf [PDF]
- Ch 09 Air Quality.pdf [PDF]
- Ch 10 Noise and Vibration.pdf [PDF]
- Ch 11 Climatic Factors.pdf [PDF]
- Ch 12 The Landscape and Visual.pdf [PDF]
- Ch 13.1 Architectural Cultural and Architectural Study.pdf [PDF]
- Ch 13.2 Archaeological.pdf [PDF]
- Ch 13.3 Rail.pdf [PDF]
- Ch 13.4 Road Traffic and Infrastructure.pdf [PDF]
- Ch 13.5 Mobility Management Programme.pdf [PDF]
- Ch 13.6 Risk Assessment.pdf [PDF]
- Ch 13.7 Safety Health and Welfare.pdf [PDF]
- Ch 14 Interactions of the above.pdf [PDF]
- Ch 15 Mitigation Measures and Monitoring Proposals.pdf [PDF]
- Vol 2C Appendices to EIS
- Appendix 1
- Appendix 10
- Appendix 11
- Appendix 12
- Appendix 13
- Appendix 14
- Appendix 15
- Appendix 2
- 2.2.1 DKM Business Case Report
- 2.3.1 ABP Consultations
- ABP 1st Consultation - Record 1 - 180607.pdf [PDF]
- ABP 1st Consultation - Record 2 - 051207.pdf [PDF]
- ABP 1st Consultation - Record 3 - 070510.pdf [PDF]
- ABP 1st Consultation - Record 4 - 180810.pdf [PDF]
- ABP 2nd Consultation record 1 01.10.2012.pdf [PDF]
- ABP 2nd Consultation record 2 15.01.2013.pdf [PDF]
- ABP 2nd Consultation record 3 24.04.2013.pdf [PDF]
- ABP 2nd Consultation record 4 11.07.2013.pdf [PDF]
- 2.3.2 SID Determinations
- 2.3.3 Scoping Submitted
- 2.3.4 Scoping Report
- 2.3.5 Consultees Responses to Scoping
- 2.3.6 List of Presribed Bodies
- 2.3.7 List of Consultations
- 2.3.8 Public Consulltation Posters
- Appendix 3
- Appendix 4
- App 4.1 Cover Letter.pdf [PDF]
- Appendix 4.1 Waste Management Plan.pdf [PDF]
- Appendix 4.2 Environmental Management Framework.pdf [PDF]
- Appendix 4.3 Oil Spill Contingency Plan.pdf [PDF]
- Appendix 4.4 Galfire Plan.pdf [PDF]
- Appendix 4.5 Port bye laws.pdf [PDF]
- Appendix 4.6 G. Evans Report on Safety Protocols.pdf [PDF]
- Appendix 4.7 Civil Works Design Report.pdf [PDF]
- Appendix 5
- Appendix 6
- Appendix 7
- Appendix 8
- Appendix 9
- Appendix 1
- Vol 2D Drawings - See Main Drawings Folder
- Galway Harbour Extension Master Template.pdf [PDF]
- Newspaper Notices 2014
- Planning
- Vol 1A Planning Application Documents
- 0 - Letter to An Bord Pleanala.pdf [PDF]
- 1 - Planning Application Form.pdf [PDF]
- 10 - Notice to Prescribed Bodies.pdf [PDF]
- 2 - Schedule of Drawings.pdf [PDF]
- 3 - Galway Harbour Land Ownership Maps.pdf [PDF]
- 4 - Letters of Consent.pdf [PDF]
- 5 - Newspapers Notices.pdf [PDF]
- 7 - Location Map for Site Notices.pdf [PDF]
- 8 - Schedule of Consultations.pdf [PDF]
- 9 - Letter to Local Authority.pdf [PDF]
- Vol 1B Planning Report
- Vol 1C Natura Impact Statement
- Vol 1D - See Main Drawings Folder
- Vol 1A Planning Application Documents
- Planning and Environmental Drawings
- Drawing Index Sheet.pdf [PDF]
- Drawings
- 01-0110 Harbour Company Offices.pdf [PDF]
- 02-0110 Cruise Terminal Building.pdf [PDF]
- 03-0110 Marina Management Building and Screen Wall.pdf [PDF]
- 04-0110 Harbour Management Building.pdf [PDF]
- 05-0110 Ancillary Buildings Plans Elevations and Section.pdf [PDF]
- 06-0110 Visual Envelope and Refined Study.pdf [PDF]
- 07-0110 Visbility Map.pdf [PDF]
- 08-0110 Landscape Character Areas.pdf [PDF]
- 2139-2101 Main Ports of Ireland.pdf [PDF]
- 2139-2102 Galway Bay Context.pdf [PDF]
- 2139-2103 Admiralty Map showing Navigation Route.pdf [PDF]
- 2139-2104 Galway Bay Conservation Areas (cSAC).pdf [PDF]
- 2139-2105 Galway Bay Special Protection Areas (SPA).pdf [PDF]
- 2139-2106 Galway Bay Proposed Natural Heritage Areas (pNHA).pdf [PDF]
- 2139-2107 cSAC within Enterprise Park and Harbour Extension.pdf [PDF]
- 2139-2108 pNHA within Enterprise Park and Harbour Extension.pdf [PDF]
- 2139-2109 SPA within Enterprise Park and Harbour Extension.pdf [PDF]
- 2139-2110 Terrestrial Habitats within Harbour Extension.pdf [PDF]
- 2139-2111 Marine Habitats within Harbour Extension.pdf [PDF]
- 2139-2112 General Arrangement Map and Grid.pdf [PDF]
- 2139-2112 General Arrangement Map and Grid.pdf [PDF]
- 2139-2113 Site Location Map showing Application Lands and Site Notices.pdf [PDF]
- 2139-2114 Map showing Lands Owned or Occupied by Galway Harbour Company.pdf [PDF]
- 2139-2115 Map showing Ownership of Application Lands.pdf [PDF]
- 2139-2116 Exsting Docks Map.pdf [PDF]
- 2139-2117 Site Layout Map.pdf [PDF]
- 2139-2118 Habitat Map showing GHEP Lands pre 1990.pdf [PDF]
- 2139-2121 Site Layout Plan.pdf [PDF]
- 2139-2122 Details of Site Layout Sheet 1 of 4.pdf [PDF]
- 2139-2123 Details of Site Layout Sheet 2 of 4.pdf [PDF]
- 2139-2124 Details of Site Layout Sheet 3 of 4.pdf [PDF]
- 2139-2125 Details of Site Layout Sheet 4 of 4.pdf [PDF]
- 2139-2127 Proposed Land Use.pdf [PDF]
- 2139-2128 Port Security Plan.pdf [PDF]
- 2139-2129 Escape Route Layout Plan.pdf [PDF]
- 2139-2131 Open Space Layout Plan.pdf [PDF]
- 2139-2132 Cycle Lanes and Link Paths.pdf [PDF]
- 2139-2133 Lighting Layout Plan.pdf [PDF]
- 2139-2134 Navigation Layout Plan.pdf [PDF]
- 2139-2135 Ship Manoeuvring Plan.pdf [PDF]
- 2139-2136 Site Investigation Exploratory Holes Layout Plan.pdf [PDF]
- 2139-2141 Stages of Construction.pdf [PDF]
- 2139-2142 Construction Cross Sections Sheet 1 of 2.pdf [PDF]
- 2139-2143 Construction Cross Sections Sheet 2 of 2.pdf [PDF]
- 2139-2144 Quay Wall Details.pdf [PDF]
- 2139-2145 Construction Sequencing Sheet 1 of 9.pdf [PDF]
- 2139-2146 Construction Sequencing Sheet 2 of 9.pdf [PDF]
- 2139-2147 Construction Sequencing Sheet 3 of 9.pdf [PDF]
- 2139-2148 Construction Sequencing Sheet 4 of 9.pdf [PDF]
- 2139-2149 Construction Sequencing Sheet 5 of 9.pdf [PDF]
- 2139-2150 Construction Sequencing Sheet 6 of 9.pdf [PDF]
- 2139-2151 Construction Sequencing Sheet 7 of 9.pdf [PDF]
- 2139-2152 Construction Sequencing Sheet 8 of 9.pdf [PDF]
- 2139-2153 Construction Sequencing Sheet 9 of 9.pdf [PDF]
- 2139-2154 Cross Sections Sheet 1 of 2.pdf [PDF]
- 2139-2155 Cross Sections Sheet 2 of 2.pdf [PDF]
- 2139-2161 Marina Layout Plan and Cross Section.pdf [PDF]
- 2139-2162 Nautical Slipway Plan and Sections.pdf [PDF]
- 2139-2163 Access Steps to Water Plan and Section.pdf [PDF]
- 2139-2164 Fishing Pier Plan and Section.pdf [PDF]
- 2139-2165 Layout of Access Junction.pdf [PDF]
- 2139-2166 Layout Plan of Enterprise Park Bridge.pdf [PDF]
- 2139-2167 Bridge Crossing Plan Elevation and Section.pdf [PDF]
- 2139-2168 Survey of Existing Lough Atalia Bridge and Road.pdf [PDF]
- 2139-2169 Lough Atalia Bridge Road Realignment and Storm Drainage.pdf [PDF]
- 2139-2170 Lough Atalia Bridge Plan and Elevations.pdf [PDF]
- 2139-2171 Lough Atalia Bridge Typical Road Sections.pdf [PDF]
- 2139-2172 Road Construction Cross Sections.pdf [PDF]
- 2139-2173 Auto-Track Analysis Site Access Junction.pdf [PDF]
- 2139-2174 Auto-Track Analysis Internal Layout Sheet 1 of 4.pdf [PDF]
- 2139-2175 Auto-Track Analysis Internal Layout Sheet 2 of 4.pdf [PDF]
- 2139-2176 Auto-Track Analysis Internal Layout Sheet 3 of 4.pdf [PDF]
- 2139-2177 Auto-Track Analysis Internal Layout Sheet 4 of 4.pdf [PDF]
- 2139-2178 Construction Traffic Haulage Routes.pdf [PDF]
- 2139-2179 Lough Atalia Bridge Closure Diversion Route.pdf [PDF]
- 2139-2180 Operational Traffic Proposed Haulage Routes.pdf [PDF]
- 2139-2181 Rail Link Layout Plan.pdf [PDF]
- 2139-2182 Rail Link Longitudinal Section.pdf [PDF]
- 2139-2183 Rail Link Cross Sections.pdf [PDF]
- 2139-2184 Fire Water Bund Layout Plan.pdf [PDF]
- 2139-2185 Fire Water Bund Cross Sections.pdf [PDF]
- 2139-2186 Oil Jetty Plan and Sections.pdf [PDF]
- 2139-2187 Duct Chamber Plan and Section.pdf [PDF]
- 2139-2188 Evacuation Station Plan and Section.pdf [PDF]
- 2139-2189 Detail of Security Fence and Gate.pdf [PDF]
- 2139-2190 Site Layout of Marina Management Building and Harbour Warehouse Building.pdf [PDF]
- 2139-2191 Site Layout of Cruise Terminal Building and Harbour Offices.pdf [PDF]
- 2139-2192 Details of Temporary Wheelwash.pdf [PDF]
- 2139-2193 Cargo Ship Mooring Arrangement Layout.pdf [PDF]
- 2139-2194 Oil Bitumen Tanker Mooring Arrangement Layout.pdf [PDF]
- 2139-2195 Bunded Refuelling Tank.pdf [PDF]
- 2139-2196 Quay Wall Breakwater Elevations Sheet 1 of 2.pdf [PDF]
- 2139-2197 Quay Wall Breakwater Elevations Sheet 2 of 2.pdf [PDF]
- 2139-2198 Wave Wall Details Sheet 1 of 2.pdf [PDF]
- 2139-2199 Wave Wall Details Sheet 2 of 2.pdf [PDF]
- 2139-2200 Layout Plan of Spill and Waste Control.pdf [PDF]
- 2139-2201 Watermain Layout Plan.pdf [PDF]
- 2139-2202 Watermain Layout Sheet 1 of 4.pdf [PDF]
- 2139-2203 Watermain Layout Sheet 2 of 4.pdf [PDF]
- 2139-2204 Watermain Layout Sheet 3 of 4.pdf [PDF]
- 2139-2205 Watermain Layout Sheet 4 of 4.pdf [PDF]
- 2139-2206 Watermain Chambers and Road Gulley Details.pdf [PDF]
- 2139-2207 Foul Sewer Layout Key Plan.pdf [PDF]
- 2139-2208 Foul Sewer Layout Sheet 1 of 3.pdf [PDF]
- 2139-2209 Foul Sewer layout Sheet 2 of 3.pdf [PDF]
- 2139-2210 Foul Sewer Layout Sheet 3 of 3.pdf [PDF]
- 2139-2211 Longitudinal Foul Sections Sheet 1 of 2.pdf [PDF]
- 2139-2212 Longitudinal Foul Sections Sheet 2 of 2.pdf [PDF]
- 2139-2213 Details of Foul Sewage Pumping Station.pdf [PDF]
- 2139-2214 Storm Drainage Layout Plan.pdf [PDF]
- 2139-2215 Storm Drainage Network A.pdf [PDF]
- 2139-2216 Storm Drainage Network B.pdf [PDF]
- 2139-2217 Storm Drainage Network C.pdf [PDF]
- 2139-2218 Storm Drainage Network D.pdf [PDF]
- 2139-2219 Longitudinal Storm Section Sheet 1 of 5.pdf [PDF]
- 2139-2220 Longitudinal Storm Section Sheet 2 of 5.pdf [PDF]
- 2139-2221 Longitudinal Storm Section Sheet 3 of 5.pdf [PDF]
- 2139-2222 Longitudinal Storm Section Sheet 4 of 5.pdf [PDF]
- 2139-2223 Longitudinal Storm Section Sheet 5 of 5.pdf [PDF]
- 2139-2224 Petrol Interceptor Detail.pdf [PDF]
- 2139-2225 Detail of Stormwater Outfall.pdf [PDF]
- 2139-2226 Detail of Manholes.pdf [PDF]
- 2139-2227 Saltwater and Firefighting Main Key Plan.pdf [PDF]
- 2139-2228 Saltwater Firefighting Main Sheet 1 of 4.pdf [PDF]
- 2139-2229 Saltwater Firefighting Main Sheet 2 of 4.pdf [PDF]
- 2139-2230 Saltwater Firefighting Main Sheet 3 of 4.pdf [PDF]
- 2139-2231 Saltwater Firefighting Main Sheet 4 of 4.pdf [PDF]
- 2139-2232 Utilities Layout Plan.pdf [PDF]
- 2139-2233 Layout Plan of Waste Reception Facilities.pdf [PDF]
- FIG 1 Landscape Master Plan.pdf [PDF]
- FIG 2 Environmental Circulation Pattern.pdf [PDF]
- FIG 3 Detail Area 1.pdf [PDF]
- FIG 4 Detail Area 2.pdf [PDF]
- FIG 5 Landscape Detail and Section A-A.pdf [PDF]
- FIG 6 Section C-C.pdf [PDF]
- FIG 7 Planting Detail.pdf [PDF]
- LS12090-1 Proposed Lighting Key Plan Sheet 1 of 4.pdf [PDF]
- LS12090-2 Proposed Lighting Sheet 2 of 4.pdf [PDF]
- LS12090-3 Proposed Lighting Sheet 3 of 4.pdf [PDF]
- LS12090-4 Proposed Lighting Sheet 4 of 4.pdf [PDF]
- LS12090-5 Lighting Columns.pdf [PDF]
- Model 1 Ground Level View North Eastwards.pdf [PDF]
- Model 2 Elevated View Northwards.pdf [PDF]
- Model 3 Ground Level View from Passenger Terminal.pdf [PDF]
- Model 4 Elevated View North Westward.pdf [PDF]
- Model 5 Elevated View South Eastward.pdf [PDF]
- Model 6 Ground Level View of Parkland Link.pdf [PDF]
- Plate 0 Photomontage Viewpoint Locations.pdf [PDF]
- Plate 1 Circular Road and Letteragh.pdf [PDF]
- Plate 10 Dock Road.pdf [PDF]
- Plate 11 Lough Atalia Railway Bridge.pdf [PDF]
- Plate 12 Railway Line Renmore.pdf [PDF]
- Plate 13 Mellows Park Renmore.pdf [PDF]
- Plate 14 Hawthorn Drive Renmore.pdf [PDF]
- Plate 15 Ballyloughan Road Ballyloughan.pdf [PDF]
- Plate 16 Roscam.pdf [PDF]
- Plate 17 Grattan Road Claddagh (Night View).pdf [PDF]
- Plate 18 The Long Walk (Night View).pdf [PDF]
- Plate 19 Mellows Park Renmore (Night View).pdf [PDF]
- Plate 2 Seapoint and Salthill.pdf [PDF]
- Plate 20 Hawthorn Drive Renmore (Night View).pdf [PDF]
- Plate 21 Stage 1 of Construction.pdf [PDF]
- Plate 22 Stage 2 of Construction.pdf [PDF]
- Plate 23 Stage 3 of Construction.pdf [PDF]
- Plate 24 Stage 4 of Construction.pdf [PDF]
- Plate 3 Mutton Island Causeway.pdf [PDF]
- Plate 4 South Park and Claddagh.pdf [PDF]
- Plate 5 Grattan Road and Claddagh.pdf [PDF]
- Plate 6 Nimmos Pier.pdf [PDF]
- Plate 7 Claddagh Basin.pdf [PDF]
- Plate 8 The Long Walk.pdf [PDF]
- Plate 9 The Roof of the Hynes Car Park Dock Road.pdf [PDF]
- 00. Correspondence
- Commission Documents
- Correspondence
- 2014
- 04.11.2014 - Acknowledgement or receipt of copy of Newspaper Notice and copy of Letters to Prescribed Bodies.pdf [PDF]
- 13,01,2014 0 Acknowledgement Letter.pdf [PDF]
- 20.10.14 - Acknowledgement letter issued to applicant re FI received.pdf [PDF]
- 2014 - Consultant to Inspector.pdf [PDF]
- 2014 - Time Extension Letters.pdf [PDF]
- 21,01.14 - Request to Applicant to Inform Irish Water.pdf [PDF]
- 21.10.14 - Letter to applicant re publication of FI notices.pdf [PDF]
- 22.10.14 - Letter to DAU re further information received from applicant.pdf [PDF]
- 22.10.2014 - Notification to Parties of Revised Notices Request.pdf [PDF]
- 23.07.2014 - Ack Letter to John P Kells.pdf [PDF]
- 23.10.2014 - Notification as Gaeilge.pdf [PDF]
- 23.10.2014 Litir do Stiofán O'Cúláin.pdf [PDF]
- 24.10.14 - Letter to IBEC re further information received from applicant.pdf [PDF]
- 27.05.14 - Letter to applicant requesting further information.pdf [PDF]
- 29 July 2014 Notification Letters of Extension of time date.pdf [PDF]
- 30.01.2014 - Letter to EPA.pdf [PDF]
- Jan 2014 Acknowledgement of OH Submissions.pdf [PDF]
- 2015
- 07.01.15 - Agenda letter to Údarás na Gaeltachta.pdf [PDF]
- 11.11.15 - Letter to applicant requesting red line boundary shapefile.pdf [PDF]
- 25.11.2015 - Response to letter from NPWS.pdf [PDF]
- 27.07.2017 - email to Galway City Council re Decision date.pdf [PDF]
- 29.09.15 - Letter to applicant requesting further information re compensatory measures.pdf [PDF]
- 29.09.2015 - Statement of Appropriate Assessment.pdf [PDF]
- 30.09.2015 - Information Notice Letters.pdf [PDF]
- Acknowledgements of O.H. submissions.pdf [PDF]
- 2016
- 2017
- 02.03.17 - Acknowledgement of Proposed Compensatory Measures (Version 2.2) report, dated February 2017 from Tobin Consulting Engineers.pdf [PDF]
- 04.08.17 - Circulation letter of meeting record of the 27.07.17 to NPWS.pdf [PDF]
- 06.11.17 - Acknowledgement of letter dated 02.11.17 from Tobin Consulting Engineers.pdf [PDF]
- 09.08.17 - Acknowledgement of recent letter received from Tobin Consulting Engineers.pdf [PDF]
- 09.11.17 - Letter issued to Galway City Business Association re update.pdf [PDF]
- 12.09.17 - Report on the proposed Phase 1 approach to compensatory from MPM to Board.pdf [PDF]
- 13.10.17 - Circulation of report by ABP consultant ecologist Daniel Bastre to Tobin Consulting Engineers.pdf [PDF]
- 17.07.17 - Notification of meeting on 27.07.17 to NPWS.pdf [PDF]
- 17.10.17 - Letter issued to Galway City Business Association re update.pdf [PDF]
- 17.10.17 - Requeste by ABP to further develop these proposed compensatory measures and to submit them to ABP in due course - To all parties.pdf [PDF]
- 17.11.17 - Notification of tripartite meeting on 11.12.17 - NPWS.pdf [PDF]
- 18.07.17 - Notification of meeting on 27.07.17 to CEO Galway Harouor Company.pdf [PDF]
- 18.07.17 - Notification of meeting on 27.07.17 to Tobin Consulting Engineers.pdf [PDF]
- 22.08.17 - Request for Obs by 12.09.17 to NPWS.pdf [PDF]
- 23.11.17 - Notification of meeting 11.12.17 and request for list of attendees.pdf [PDF]
- 25.01.17 - Acknowledgement of letter receiverd on 13.12.17 from Tobin Consulting Engineers.pdf [PDF]
- 25.01.17 - Background and Brief for Consultant Mr D Bastreri Assessment of Compensatory Measures.pdf [PDF]
- 25.07.17 - Acknowledgement of Email from Tobin Consulting Engineers.pdf [PDF]
- 26.01.17 - Acknowledgement of letter receiverd on 13.01.17 from Tobin Consulting Engineers.pdf [PDF]
- 26.10.17 - Acknowledgement of letter dated 24.10.17 from Galway Bay Inshore Fishermen's Association.pdf [PDF]
- 27.07.17 - List of attendees for 27.07.17.pdf [PDF]
- 30.05.17 - Acknowledgement of Email from Tobin Consulting Engineers.pdf [PDF]
- 31.01.17 - Circulation of tripartite meeting on 13.12.16 to Tobin Consulting Engineers.pdf [PDF]
- 2018
- 2019
- 01.05.19 - Acknowledgement letter to applicant re documentation received 29.04.19.pdf [PDF]
- 02.07.19 - Circulation letter to the DAU encl. Compensatory Measures Report.pdf [PDF]
- 03.12.19 - Email to applicant re additional intertidal reference area proposed.pdf [PDF]
- 05.11.19 - Email from Inspector re ecological surveys.pdf [PDF]
- 06.11.19 - Letter to applicant granting time extension request.pdf [PDF]
- 07.10.19 - Letter to applicant requesting clarification on Compensatory Measures Report.pdf [PDF]
- 11.09.19 - Email from consultant with review of comments previously circulated.pdf [PDF]
- 11.11.19 - Email from consultant re applicant's monitoring programme.pdf [PDF]
- 11.11.19 - Email from consultant re drafting of response to applicant.pdf [PDF]
- 12.11.19 - Email response to applicant query re monitoring programme.pdf [PDF]
- 16.07.19 - Email thread with ICT queries.pdf [PDF]
- 18.12.19 - Email to applicant re consultant's response.pdf [PDF]
- 19.12.19 - Email correspondence with consultant.pdf [PDF]
- 20.10.19 - Email from consultant re clarification to be issued to applicant.pdf [PDF]
- 29.08.19 - Email to consultant attaching comments received.pdf [PDF]
- 29.11.19 - Email from consultant re CMR additional intertidal reference area proposed.pdf [PDF]
- 2020
- 2021
- 01.07.21 - Letter to applicant re case update.pdf [PDF]
- 06.08.21 - Email from SAO to Minister for Housing requesting update on IROPI.pdf [PDF]
- 09.09.21 - Letters issued re correspondence received from DHLGH.pdf [PDF]
- 12.05.21 - Letter to applicant re website update request.pdf [PDF]
- 13.04.21 - Letters circulating IROPI letter to all parties.pdf [PDF]
- 13.12.21-20.04.22 - Email Correspondence - Attached GH Extension Issued to ABP.pdf [PDF]
- 14.12.21 - Email from Inspector re time extension request.pdf [PDF]
- 14.12.21 - Letter granting time extension request until 28th February 2022.pdf [PDF]
- 15.11.21 - Email thread with Inspector re time extension request.pdf [PDF]
- 18.02.21 - Internal email.pdf [PDF]
- 20.10.21 - Request for applicant's response to NPWS submission.pdf [PDF]
- 22.12.21 - Email circulation submission & reports to applicant.pdf [PDF]
- 24.03.21 - Letter to applicant enclosing copy of letter to Minister issued same day.pdf [PDF]
- 24.03.21 - Letter to Minister advising application be given consent for IROPI.pdf [PDF]
- 24.08.21 - Letter to applicant re case update.pdf [PDF]
- 25.11.21 - Letter granting FI time extension request until 17th December 2021.pdf [PDF]
- 28.07.21 - Email from applicant requesting update on IROPI.pdf [PDF]
- 2022
- 01.03.22 - Email correspondence (Letter from NPWS to ABP in relation to Galway Port Compensatory measures).pdf [PDF]
- 01.03.22 - Letter to NPWS re compensatory measures.pdf [PDF]
- 01.03.22 - Letter to NPWS responding to email dated 22nd Feb 2022.pdf [PDF]
- 07.03.22 - Email thread with applicant.pdf [PDF]
- 07.09.22 - Time extension request and approval until 24th October 2022.pdf [PDF]
- 08.03.22 - Ack Letter to Tobin Consulting Engineers - email correspondence 7th March and 22nd Feb attached.pdf [PDF]
- 08.03.22 - Correspondence to applicant enclosing letter issued to NPWS.pdf [PDF]
- 08.03.22 - Email request 7th March 22 - attached copy of ABP letter issued to NPWS on 1st March 22 and letter to Tobin C.pdf [PDF]
- 08.03.22 - Letter to applicant enclosing ABP Letter to the NPWS dated 1st March 2022.pdf [PDF]
- 09.12.22 - Email circulating requested documentation to applicant.pdf [PDF]
- 12.10.22 - Acknowledgement letter to applicant re response to compensatory measures proposal.pdf [PDF]
- 13.12.21-20.04.22 - Email Correspondence - Attached GH Extension Issued to ABP.pdf [PDF]
- 16.06.22 - Letter granting time extension request until 12th September 2022.pdf [PDF]
- 21.04.22 - Letter granting FI time extension request until 20th June 2022.pdf [PDF]
- 22.02.22 - 07.03.22 - Email Correspondence - attached Compensatory Measure for Galway Port Development letters.pdf [PDF]
- 22.02.22-07.03.22 - Email correspondence re postal address for NPWS.pdf [PDF]
- 24.02.22 - Email thread with Inspector re time extension request.pdf [PDF]
- 25.02.22 - Email granting time extension request until 25th April 22.pdf [PDF]
- 25.02.22 - Letter granting time extension request until 25th April 2022.pdf [PDF]
- 2023
- 07.07.23 - Letter to Declan Scully re availability of documents for public inspection.pdf [PDF]
- 09.11.23 - Letter to DHLGH re response requested.pdf [PDF]
- 11.05.23 - Case update request from applicant.pdf [PDF]
- 26.05.23 - Letter to the Minister of Housing re proposed compensatory measures & IROPI.pdf [PDF]
- 29.05.23 - Letter to John G. Deely enclosing letter to the minister dated 26th May 2023.pdf [PDF]
- 29.05.23 - Letter to parties enclosing letter to the minister dated 26th May 2023.pdf [PDF]
- 31.05.23 - Reissued letter to the Minister of Housing re proposed compensatory measures & IROPI.pdf [PDF]
- 2024
- 06.12.24 - Letter to all parties re publication of SFI notices.pdf [PDF]
- 11.01.24 - Email to DHLGH & NPWS re receipt of letters.pdf [PDF]
- 16.07.24 - Letter requesting further information issued to applicant.pdf [PDF]
- 17.07.24 - Notification letters to parties for info only re FI requested from applicant.pdf [PDF]
- 18.09.24 - Email chain regarding further time extension request by applicant.pdf [PDF]
- 18.09.24 - Letter to applicant granting FI time extension request.pdf [PDF]
- 18.11.24 - Further Information Notice to applicant.pdf [PDF]
- 20.05.24 - Circulation of meeting agenda to applicant.pdf [PDF]
- 22.07.24 - Letter issued in Irish to Údarás na Gaeltachta.pdf [PDF]
- 28.01.24 - Letter to HSA requesting technical advice on proposed development.pdf [PDF]
- 29.02.24 - Acknowledgement letter to applicant re IROPI info rec'd.pdf [PDF]
- 29.05.24 - Circulation of meeting record to applicant.pdf [PDF]
- 29.08.24 - Email chain and letter re time extension request.pdf [PDF]
- 30.04.24 - Letter to applicant re arrangements for upcoming meeting.pdf [PDF]
- 30.09.24 - Acknowledgement letter to applicant re FI received.pdf [PDF]
- 2025
- 04.04.25 - Extension of time granted until 24th April 2025.pdf [PDF]
- 07.03.25 - Circulation for information only to LA of FI submisssions.pdf [PDF]
- 07.03.25 - Circulation of Submissions to Applicant.pdf [PDF]
- 13.02.25 - Letter issued to Uisce Éireann requesting submission on FI.pdf [PDF]
- 14.02.25 - Circulation of 21 Submissions to Applicant.pdf [PDF]
- 16.05.25 - Invitation for response issued to Declan W. Scully.pdf [PDF]
- 17.06.25 - Further comments circulated to LA for info only.pdf [PDF]
- 19.02.25 - Letters to Galway City Co & Galway Co Co requesting observations as per Inspector's Memo.pdf [PDF]
- 19.06.25 - Declan Scully's time extension request refused.pdf [PDF]
- 27.03.25 - Time extension request and approval until 24 April 2025.pdf [PDF]
- 30.04.25 - Request for comments from observers in repsonse to applicant's FI response.pdf [PDF]
- 2026
- 2014
- Directions
- 02.09.16 - Direction.pdf [PDF]
- 05.10.17 - Direction.pdf [PDF]
- 06.11.24 - Direction.pdf [PDF]
- 11.03.21 - Direction.pdf [PDF]
- 11.03.26 - Direction CD-021999-26.pdf [PDF]
- 15.05.23 - Direction.pdf [PDF]
- 17.06.19 - Direction.pdf [PDF]
- 18.10.21 - Direction.pdf [PDF]
- 19.03.26 - Direction CD-021997-26.pdf [PDF]
- 19.12.18 - Direction.pdf [PDF]
- 20.11.25 - Direction CME-005512-25.pdf [PDF]
- 28.06.24 - Direction.pdf [PDF]
- Documentation
- Assessment of Ecological Impacts on the Marine Environment (February 2015).pdf [PDF]
- Assessment of Proposed Compensatory Measures (September 2017).pdf [PDF]
- Background and Brief for Consultant's Assessment of Compensatory Measures.pdf [PDF]
- Board Direction - 29.01.2016.pdf [PDF]
- Board's Statement of Appropriate Assessment - September 2015.pdf [PDF]
- Brief for Marine Ecology Consultant.pdf [PDF]
- Case history as of ~2020.pdf [PDF]
- Compensatory Measures Public Notice DRAFT.pdf [PDF]
- Consultant's Report re. Proposed Compensatory Measures.pdf [PDF]
- Review Comments on Compensatory Measures Report 2019, Reply to Further Information.pdf [PDF]
- Review of Marine Hydrology Issues.pdf [PDF]
- Stages in the Site Designation Process.pdf [PDF]
- Inspector Reports
- 2020
- Addendum Report - 2026
- Appendix 1 - 2024 EIS & NIS Addenda Review Comments.pdf [PDF]
- Appendix 2 - Review of Marine Hydrology Issues.pdf [PDF]
- Appendix 3 - Water Framework Directive Assessment.pdf [PDF]
- Appendix 4 - Appropriate Assessment Screening.pdf [PDF]
- Appendix 5 - Appropriate Assessment.pdf [PDF]
- Inspector's Addendum Report.pdf [PDF]
- Inspector's Report - 2015.pdf [PDF]
- Site Visit Photographs.pdf [PDF]
- Meeting Records & Agendas
- 00. PA0033 Agenda NPWS Meeting - Date TBA.pdf [PDF]
- 01. PA0033 Agenda NPWS Meeting - 28.06.16.pdf [PDF]
- 02. PA0033 Meeting Agenda NPWS - 28.06.16.pdf [PDF]
- 03 PA0033 Record of NPWS meeting June 2016 - 28.06.16.pdf [PDF]
- 04. PA0033 Record of 1st tripartite meeting NPWS and Galway Harbour Company - 13.12.16.pdf [PDF]
- 05. PA0033 Record of meeting with NPWS (2nd) - 03.04.17.pdf [PDF]
- 06. PA0033 Record of 2nd tripartite meeting NPWS and Galway Harbour Company - 27.07.17.pdf [PDF]
- Commission Meeting Record - 10.03.26.pdf [PDF]
- Commission Meeting Record - 20.11.25.pdf [PDF]
- Meeting Agenda - 11.12.17.pdf [PDF]
- Meeting Agenda -23.05.24.pdf [PDF]
- Meeting Record - 23.05.24.pdf [PDF]
- Record of meeting held on 13.12.16 Galway Harbour Extensdion.pdf [PDF]
- Memos
- Memo for AI Galway Harbour PC.pdf [PDF]
- Memo from ADP to DoP - 04.03.24.pdf [PDF]
- Memo re Further Information received 27 September 2024 - 16.10.24.pdf [PDF]
- Memo re lodgement of Application 17.01.2014.pdf [PDF]
- Memo re no oral hearing - 12.11.25.pdf [PDF]
- Memo re request for submissions on FI from LAs - 18.02.25.pdf [PDF]
- Memo re requested comments received from applicant - 18.10.22.pdf [PDF]
- Memo re time extension request to submit FI - 23.07.14.pdf [PDF]
- Memo to Board - 06.03.24.pdf [PDF]
- Memo to Board re correspondence with DHLGH - 08.09.21.pdf [PDF]
- Memo to Board re IROPI procedures - 08.10.20.pdf [PDF]
- Memo to board re-appointment of ecological consultant - 23.01.17.pdf [PDF]
- Memo to Bord re ecological consultant continue on case - 18.01.17.pdf [PDF]
- Memo to Chairperson re IROPI procedures - 08.10.20.pdf [PDF]
- Memo to Inspector re response to submissions received - 24.04.25.pdf [PDF]
- Oral Hearing - January 2015
- Correspondence
- HLG 00090- 24 Appendix 2 Letter from ABP 24 March 21.pdf [PDF]
- HLG 00090-24 Appendix 1 Letter from Minister Noonan re Compensatory Measures.pdf [PDF]
- HLG 00090-24 Appendix 3 Galway Harbour Extension Compensatory Measures Plan.pdf [PDF]
- HLG 00090-24 Signed Letter to ABP - Niamh Thornton.pdf [PDF]
- Public Notices
- Third Party Documents
- 00. Invalid Submissions (Miscellaneous)
- 01. Submissions - January-March 2014
- 002. GALWAY CO CO.pdf [PDF]
- 003. Bus Éireann.pdf [PDF]
- 004. CIE GROUP PROPERTY MANAGEMENT.pdf [PDF]
- 005. DEPT OF AGRICULTURE FOOD MARINE.pdf [PDF]
- 006. DAHLG.pdf [PDF]
- 007. DECLG Marine Planning.pdf [PDF]
- 008. Transport Tourism and Sport.pdf [PDF]
- 009. EPA.pdf [PDF]
- 010. Failte Ireland.pdf [PDF]
- 011. GSI DECNR.pdf [PDF]
- 012. HSA.pdf [PDF]
- 013. HSE.pdf [PDF]
- 014. Iarnrod Eireann.pdf [PDF]
- 015. Inland Fisheries Ireland.pdf [PDF]
- 016. NRA.pdf [PDF]
- 016B National Roads Authority FI sub.pdf [PDF]
- 017. National Transport Authority.pdf [PDF]
- 018. AN TAISCE.pdf [PDF]
- 018B An Taisce.pdf [PDF]
- 019. UDARAS NA GAELTACHTA.pdf [PDF]
- 100. SCCUL ENTERPRISES.pdf [PDF]
- 101. SCULLLY DECLAN.pdf [PDF]
- 102.A. SHANNON FOYNES PORT COMPANY.pdf [PDF]
- 102.B. SHANNON FOYENES PORT COMPANY.pdf [PDF]
- 103. SKAL.pdf [PDF]
- 104. SUIL NUA.pdf [PDF]
- 105. ARDILAUN HOTEL.pdf [PDF]
- 106. HARBOUR HOTEL.pdf [PDF]
- 107. HOUSE HOTEL.pdf [PDF]
- 108. LATIN QUARTER.pdf [PDF]
- 109. TOPAZ.pdf [PDF]
- 110. TRAD ON THE PROM.pdf [PDF]
- 111. TROY CHARLIE.pdf [PDF]
- 112. VSHIPS.pdf [PDF]
- 113. VINTNERS FEDERATION.pdf [PDF]
- 114. WESTERN DEVELOPMENT COMMISSION.pdf [PDF]
- 115. WESTPORT CHAMBER.pdf [PDF]
- 116. WESTSAILS.pdf [PDF]
- 117. Office of Public Works.pdf [PDF]
- 20. WRA.pdf [PDF]
- 21. KITT MICHAEL TD.pdf [PDF]
- 22. KYNE SEAN TD.pdf [PDF]
- 23. Eamon O CUIV TD.pdf [PDF]
- 24. WALSH BRIAN TD.pdf [PDF]
- 25. CONNOLLY CATHERINE CLLR.pdf [PDF]
- 26. ACHILLES PROCUREMENT.pdf [PDF]
- 27. ARAN and Island FERRIES.pdf [PDF]
- 28. ATLANTIC FUEL.pdf [PDF]
- 29. ATLANTIC OCEAN ENERGY ALLIANCE.pdf [PDF]
- 30. BADOIRI TEO.pdf [PDF]
- 31. BALLYHAUNIS CHAMBER.pdf [PDF]
- 32. BEM IRELAND.pdf [PDF]
- 33. BIRDWATCH IRELAND.pdf [PDF]
- 34. BORD IASCAIGH MHARA.pdf [PDF]
- 35. BORD NA MONA.pdf [PDF]
- 36. BOWWAVES.pdf [PDF]
- 37.A. BROWNE BRENDAN AND OTHERS.pdf [PDF]
- 37.B. BROWNE BRENDAN VIDEO
- 38. BRUSCAR BHEARNA TEO.pdf [PDF]
- 39. CITY GALWAY SHIPPING CO.pdf [PDF]
- 40. CLADDAGH JEWELLERS.pdf [PDF]
- 41. CLADDAGH RESIDENTS.pdf [PDF]
- 42. COISTE TACAIOCHTA.pdf [PDF]
- 43. COLD CHON.pdf [PDF]
- 44. CURRAN SUSAN AND SARAH.pdf [PDF]
- 45. DOMINIC LYDON.pdf [PDF]
- 46. eGROUP.pdf [PDF]
- 47. ENGINEERS IRELAND WEST.pdf [PDF]
- 48. ENWEST LTD.pdf [PDF]
- 49. EZ LIVING.pdf [PDF]
- 50. FLAGSHIP.pdf [PDF]
- 51. GALWAY ARTS FESTIVAL.pdf [PDF]
- 52. GALWAY BAY HOTEL.pdf [PDF]
- 53. GALWAY BAY INSHORE FISHERMANS.pdf [PDF]
- 54. GALWAY BAY SAILING CLUB.pdf [PDF]
- 55. GALWAY BOAT BUILD.pdf [PDF]
- 56. GALWAY BUSINESS PROFESSIONAL WOMEN.pdf [PDF]
- 57. GALWAY BUSINESS NETWORKING INTL.pdf [PDF]
- 58. GALWAY CHAMBER.pdf [PDF]
- 59. GALWAY CITY BUSINESS ASSOC.pdf [PDF]
- 60. GALWAY CITY SAILING CLUB.pdf [PDF]
- 61. GALWAY CYCLING CAMPAIGN.pdf [PDF]
- 62. GALWAY FAMINE MEMORIAL COMMITTEE.pdf [PDF]
- 63. GALWAY METAL.pdf [PDF]
- 64. GALWAY PROPERTY MANAGEMENT.pdf [PDF]
- 65. GALWAY TECHNOLOGY CENTRE.pdf [PDF]
- 66. GALWAY TOUR GUIDES ASSOC.pdf [PDF]
- 67. GALWAYS WEST END TRADERS.pdf [PDF]
- 68. DERRICK HAMBLETON.pdf [PDF]
- 69. HARTE SCARRIFF.pdf [PDF]
- 70. HERITAGE HARBOUR HOLDINGS.pdf [PDF]
- 71. HYGEIA.pdf [PDF]
- 72. IBEC.pdf [PDF]
- 73. IDA.pdf [PDF]
- 74. INLAND AND COASTAL MARINA.pdf [PDF]
- 75. IRISH OFFSHORE OPERATORS.pdf [PDF]
- 76. JFC MANUFACTURING.pdf [PDF]
- 77. KYLEMORE ABBEY.pdf [PDF]
- 78. LIAM MELLOWS GAA.pdf [PDF]
- 79. MANANNAN MARINE.pdf [PDF]
- 80. MANNION PA.pdf [PDF]
- 81. MARINE TECHNOLOGY.pdf [PDF]
- 82. MAYO SAILING CLUB.pdf [PDF]
- 83. MCDONOUGH MARY.pdf [PDF]
- 84. MOROIL.pdf [PDF]
- 84. Withdrawal MoroOil.pdf [PDF]
- 85. MULLOCK.pdf [PDF]
- 86. NUI GALWAY.pdf [PDF]
- 87. JOHN O DONNELL.pdf [PDF]
- 88. DARRAGH O LOUGHLIN.pdf [PDF]
- 89. SEAN O LOUGHLIN.pdf [PDF]
- 90. OCEAN CREST MARINE.pdf [PDF]
- 91. O NEILL BILLY.pdf [PDF]
- 92. OPEN HOUSE GALWAY.pdf [PDF]
- 93. OPTIM FINANCIAL.pdf [PDF]
- 94. P AND O Maritime.pdf [PDF]
- 95. P. POWELL.pdf [PDF]
- 96. RESTAURANTS ASSOCIATION.pdf [PDF]
- 97. ROSHIN LTD.pdf [PDF]
- 98. RYNN.pdf [PDF]
- 99. SALTHILL TOURISM AND DEVELOPMENT.pdf [PDF]
- 02. Planning Authority Report - March 2014
- 03. Supplementary Information from Shannon Foynes Port Company - November 2014
- 04. FI Submissions - December 2014
- FI Sub 2014 - Atlantic Fuel Supply Company.pdf [PDF]
- FI Sub 2014 - Birdwatch Ireland.pdf [PDF]
- FI Sub 2014 - Dept. Arts Heritage and Gaeltacht.pdf [PDF]
- FI Sub 2014 - Galway Bay Inshore Fishermen's Association.pdf [PDF]
- FI Sub 2014 - Galway City Council.pdf [PDF]
- FI Sub 2014 - Gia Griffiths Howard.pdf [PDF]
- FI Sub 2014 - Health Service Executive.pdf [PDF]
- FI Sub 2014 - Inland Fisheries Ireland.pdf [PDF]
- FI Sub 2014 - Irish Water.pdf [PDF]
- FI Sub 2014 - McGraths Limestone (Cong) Ltd.pdf [PDF]
- FI Sub 2014 - Murray Timber Group.pdf [PDF]
- FI Sub 2014 - Office of Public Works.pdf [PDF]
- FI Sub 2014 - Shannon Foynes.pdf [PDF]
- 05. Oral Hearing Submissions - January 2015
- PA0033 DAY 1 OH GHC BRIEF NO 6 WETLAND ECOSYSTEM+HABITAT.pdf [PDF]
- PA0033 DAY 2 OH GHC BRIEF NO 9 MARINE ECOLOGY.pdf [PDF]
- PA0033 OH DAY 4 GALWAY CITY COUNCIL SUBMISSION.pdf [PDF]
- PA0033 OH Birdwatch Ireland OH Submission.pdf [PDF]
- PA0033 OH BRIEF 3 Hydrology.pdf [PDF]
- PA0033 OH BRIEF Engineering.pdf [PDF]
- PA0033 OH DAY 1 GHC BRIEF NO 1 ENGINEERING.pdf [PDF]
- PA0033 OH DAY 1 GHC BRIEF NO 2 EIS ADDENDA+ERRATA.pdf [PDF]
- PA0033 OH DAY 1 GHC BRIEF NO 3 HYDROLOGY.pdf [PDF]
- PA0033 OH DAY 1 GHC BRIEF NO 4 NOISE+VIBRATION.pdf [PDF]
- PA0033 OH DAY 1 GHC BRIEF NO 5 AIR QUALITY+CLIMATE.pdf [PDF]
- PA0033 OH DAY 1 GHC BRIEF NO 7 TERRESTRIAL HABITAT MAMMALS + BIRDS.pdf [PDF]
- PA0033 OH DAY 1 GHC BRIEF NO 8 AVIAN ECOLOGY.pdf [PDF]
- PA0033 OH DAY 2 CLADONIAN MARINERS SUBMSN.pdf [PDF]
- PA0033 OH DAY 2 GHC RESPONSE TO BIRDWATCH IRL.pdf [PDF]
- PA0033 OH DAY 2 GHC RESPONSE TO IFI.pdf [PDF]
- PA0033 OH DAY 2 IFI SUBMSN.pdf [PDF]
- PA0033 OH DAY 3 GHC RESPONSE TO DAHG SUB.pdf [PDF]
- PA0033 OH DAY 3 GHC RESPONSE TO PRESCRIBED BODIES.pdf [PDF]
- PA0033 OH DAY 3 NPWS SUBMSN.pdf [PDF]
- PA0033 OH DAY 4 AN TAISCE SUBMSN.pdf [PDF]
- PA0033 OH DAY 4 ANNE CAREY ARCHITECTURAL HRTG BRF.pdf [PDF]
- PA0033 OH DAY 4 COST BENEFIT BRF.pdf [PDF]
- PA0033 OH DAY 4 ENGINEERING BRIEF PART2.pdf [PDF]
- PA0033 OH DAY 4 JULIANNA ODONOGHUE ARCHAEOLOGY BRF.pdf [PDF]
- PA0033 OH DAY 4 R BURKE BUSINESS CASE.pdf [PDF]
- PA0033 OH DAY 5 AN TAISCE SUBMSN.pdf [PDF]
- PA0033 OH DAY 5 D DUGGAN SOILS.pdf [PDF]
- PA0033 OH DAY 5 M EGAN LANDSCAPE VISUAL VISUAL.pdf [PDF]
- PA0033 OH DAY 5 T CANNON TRANSPORT BRF.pdf [PDF]
- PA0033 OH DAY 6 ATLANTIC FUEL SUPPLY COMPANY SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 CLADDAGH RESIDENTS ASSOC SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 CLLR CONNOLLY SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 GALWAY BAY SAILING CLUB SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 GALWAY CHAMBER SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 GALWAY CYCLING CAMPAIGN BRF.pdf [PDF]
- PA0033 OH DAY 6 GALWAY METAL CO SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 GALWAY SHIPPING CO SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 GBIFA SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 GIA GRIFFITH HOWARD.pdf [PDF]
- PA0033 OH DAY 6 IBEC WEST SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 IDA IRELAND WEST SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 MCGRATHS LIMESTONE LTD.pdf [PDF]
- PA0033 OH DAY 6 MURRAY TIMBER SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 ROSSAVEAL PORT.pdf [PDF]
- PA0033 OH DAY 6 SARAH+SUSAN CURRAN.pdf [PDF]
- PA0033 OH DAY 6 TOPAZ SUBMSN.pdf [PDF]
- PA0033 OH DAY 6 TRAD ON THE PROM SUBMSN.pdf [PDF]
- PA0033 OH DAY 7 GALWAY CITY CO FINAL SUBMISSION.pdf [PDF]
- PA0033 OH DAY 7 GHC GRT NORTH DIVER SURVEY.pdf [PDF]
- PA0033 OH DAY 7 GHC RESPONSES.pdf [PDF]
- PA0033 OH DAY 7 SHANNON FOYNES PORTCO SUBMSN.pdf [PDF]
- PA0033 OH DAY 7 TYNAGH MINES SUBMISSION.pdf [PDF]
- PA0033.OH.PRELIM.pdf [PDF]
- 06. DAHG response re. compensation measures - May 2016.pdf [PDF]
- 07. NPWS' comments on compensatory measures - September 2017.pdf [PDF]
- 08. Department of Culture Heritage and the Gaeltacht (DAU) Observations Report - August 2019.pdf [PDF]
- 09. Minister's response to IROPI update request - September 2021.pdf [PDF]
- 11. FI Submissions - February 2025
- FI Sub 2025 - An Taisce.pdf [PDF]
- FI Sub 2025 - Commission for Railway Regulation.pdf [PDF]
- FI Sub 2025 - DAU - Dept of Housing Local Government and Heritage.pdf [PDF]
- FI Sub 2025 - DAU - Government Offices.pdf [PDF]
- FI Sub 2025 - Dr James McCarthy.pdf [PDF]
- FI Sub 2025 - Environmental Protection Agency.pdf [PDF]
- FI Sub 2025 - Galway Bay Sailing Club.pdf [PDF]
- FI Sub 2025 - Galway Chamber of Commerce.pdf [PDF]
- FI Sub 2025 - Galway City Council Submission.pdf [PDF]
- FI Sub 2025 - Galway City Council.pdf [PDF]
- FI Sub 2025 - Health and Safety Authority.pdf [PDF]
- FI Sub 2025 - HSE.pdf [PDF]
- FI Sub 2025 - IBEC.pdf [PDF]
- FI Sub 2025 - Inland Fisheries Ireland.pdf [PDF]
- FI Sub 2025 - JFC Manufacturing Company Limited.pdf [PDF]
- FI Sub 2025 - Maritime Area Regulatory Authority.pdf [PDF]
- FI Sub 2025 - Northern and Western Reginal Assembly.pdf [PDF]
- FI Sub 2025 - Platform 94.pdf [PDF]
- FI Sub 2025 - Shane Foran.pdf [PDF]
- FI Sub 2025 - The Land Development Agency.pdf [PDF]
- FI Sub 2025 - TII.pdf [PDF]
- FI Sub 2025 - Uisce Éireann.pdf [PDF]
- FI Sub 2025 - Vincent Connell.pdf [PDF]
- FI Sub 2025 - Western Development Commission.pdf [PDF]
- Invalid FI Submissions - February 2025
- 12. Submissions on Applicant's Response to FI Submissions - May 2025
- Further Comment - Brendan Browne and Others.pdf [PDF]
- Further Comment - Dept of Agriculture.pdf [PDF]
- Further Comment - Galway Chamber of Commerce.pdf [PDF]
- Further Comment - MARA.pdf [PDF]
- Further Comment - OPW.pdf [PDF]
- Further Comment - Thomas Cox.pdf [PDF]
- Further Comment - TII.pdf [PDF]
- Further Comment - Vincent Connell.pdf [PDF]
- Further Comments - An Taisce.pdf [PDF]
- Further Comments - Derrick Hambleton.pdf [PDF]
- 31 12.2015 - Letter from Derrick Hambleton.pdf [PDF]
- Correspondence
- 01.03.22 - Email confirming NPWS' address.pdf [PDF]
- 02.02.16 - Requesting the applicant, NPWS to submit proposals.pdf [PDF]
- 03.02.16 - Notification of upcoming meeting to NPWS.pdf [PDF]
- 05.09.16 - Acknowledgement of Email receiverd on 24.10.16 from NPWS.pdf [PDF]
- 08.08.16 - Copy of meeting records of 28.06.16 sent to NPWS.pdf [PDF]
- 09.12.16 - Acknowledgement of letter receiverd on 06.12.16 from NPWS.pdf [PDF]
- 12.02.21 - Email from DHLGH to ABP.pdf [PDF]
- 12.06.20 - Case status update request from Derrick Hambleton.pdf [PDF]
- 14.12.21 - Email from NPWS re upcoming correspondence.pdf [PDF]
- 18.10.17 - Acknowledgement of correspondence from ABP dated 17.10.17 - NRWA.pdf [PDF]
- 22.02.22 - Email from NPWS re compensatory measures letter from DHLGH.pdf [PDF]
- 24.05.16 - Conformation to submit Obs by 27.05.16 to NPWS.pdf [PDF]
- 25.10.17 - Notification of No Obs from Irish Aviation Authority.pdf [PDF]
- 26.03.21 - Acknowledgement letter from DHLGH.pdf [PDF]
- 27.02.24 - Correspondence from Minister O'Brien in response to our letter re IROPI dated 24.03.21.pdf [PDF]
- 27.05.16 - Acknowledgement of Sub to Galway Cycling Campaign.pdf [PDF]
- 27.05.16 - Acknowledgement of Submission - NPWS.pdf [PDF]
- 29.01.16 - Department of Arts, Heritage and the Gaeltacht.pdf [PDF]
- 30.03.16 - Acknowledgement letter of extention request from NPWS.pdf [PDF]
- Response from Dept of Arts Heritage and Gaeltacht - 12.11.2015.pdf [PDF]
- View associated documents
-
2026Report&Appendices
-
Tá an t-iarratas seo faoi réir nós imeachta MTT.
- View associated documents
- EIA Agenda January 2015.pdf [PDF]
- EIS Addenda-Arrata to Chapters.pdf [PDF]
- Environmental
- Environmental
- Vol 2A Non Technical Summary
- Vol 2B Main EIS
- Ch 01 Introduction and Background.pdf [PDF]
- Ch 02 Project Context - Planning and Business Case.pdf [PDF]
- Ch 03 Alternatives.pdf [PDF]
- Ch 04 Description of Development.pdf [PDF]
- Ch 05 Human Beings and Socio Economic.pdf [PDF]
- Ch 06 Soils.pdf [PDF]
- Ch 07 Flora and Fauna.pdf [PDF]
- Ch 08 Water.pdf [PDF]
- Ch 09 Air Quality.pdf [PDF]
- Ch 10 Noise and Vibration.pdf [PDF]
- Ch 11 Climatic Factors.pdf [PDF]
- Ch 12 The Landscape and Visual.pdf [PDF]
- Ch 13.1 Architectural Cultural and Architectural Study.pdf [PDF]
- Ch 13.2 Archaeological.pdf [PDF]
- Ch 13.3 Rail.pdf [PDF]
- Ch 13.4 Road Traffic and Infrastructure.pdf [PDF]
- Ch 13.5 Mobility Management Programme.pdf [PDF]
- Ch 13.6 Risk Assessment.pdf [PDF]
- Ch 13.7 Safety Health and Welfare.pdf [PDF]
- Ch 14 Interactions of the above.pdf [PDF]
- Ch 15 Mitigation Measures and Monitoring Proposals.pdf [PDF]
- Vol 2C Appendices to EIS
- Appendix 1
- Appendix 10
- Appendix 11
- Appendix 12
- Appendix 13
- Appendix 14
- Appendix 15
- Appendix 2
- 2.2.1 DKM Business Case Report
- 2.3.1 ABP Consultations
- ABP 1st Consultation - Record 1 - 180607.pdf [PDF]
- ABP 1st Consultation - Record 2 - 051207.pdf [PDF]
- ABP 1st Consultation - Record 3 - 070510.pdf [PDF]
- ABP 1st Consultation - Record 4 - 180810.pdf [PDF]
- ABP 2nd Consultation record 1 01.10.2012.pdf [PDF]
- ABP 2nd Consultation record 2 15.01.2013.pdf [PDF]
- ABP 2nd Consultation record 3 24.04.2013.pdf [PDF]
- ABP 2nd Consultation record 4 11.07.2013.pdf [PDF]
- 2.3.2 SID Determinations
- 2.3.3 Scoping Submitted
- 2.3.4 Scoping Report
- 2.3.5 Consultees Responses to Scoping
- 2.3.6 List of Presribed Bodies
- 2.3.7 List of Consultations
- 2.3.8 Public Consulltation Posters
- Appendix 3
- Appendix 4
- App 4.1 Cover Letter.pdf [PDF]
- Appendix 4.1 Waste Management Plan.pdf [PDF]
- Appendix 4.2 Environmental Management Framework.pdf [PDF]
- Appendix 4.3 Oil Spill Contingency Plan.pdf [PDF]
- Appendix 4.4 Galfire Plan.pdf [PDF]
- Appendix 4.5 Port bye laws.pdf [PDF]
- Appendix 4.6 G. Evans Report on Safety Protocols.pdf [PDF]
- Appendix 4.7 Civil Works Design Report.pdf [PDF]
- Appendix 5
- Appendix 6
- Appendix 7
- Appendix 8
- Appendix 9
- Appendix 1
- Vol 2D Drawings - See Main Drawings Folder
- Environmental
- View associated documents
-
FurtherInformation
- View associated documents
- 01 - EIS Addendum Vol. 1 - Main EIS Chapters
- CH01 - Introduction & Background.pdf [PDF]
- CH02 - Planning & Policy Context.pdf [PDF]
- CH03 - Alternatives.pdf [PDF]
- CH04 - Description of Development.pdf [PDF]
- CH05 - Human Beings.pdf [PDF]
- CH06 - Soils.pdf [PDF]
- CH07 - Flora & Fauna.pdf [PDF]
- CH08 - Water.pdf [PDF]
- CH09 - Air Quality.pdf [PDF]
- CH10 - Noise & Vibration.pdf [PDF]
- CH11 - Climatic Factors.pdf [PDF]
- CH12 - Landscape & Visual.pdf [PDF]
- CH13.1 - Architectural & Cultural.pdf [PDF]
- CH13.2 - Archaeology.pdf [PDF]
- CH13.3 - Rail.pdf [PDF]
- CH13.4 - Road Traffic & Infrastructure.pdf [PDF]
- CH13.5 - Mobility Management Framework.pdf [PDF]
- CH13.6 - Risk Assessment.pdf [PDF]
- CH13.7 - Safety, Health & Welfare.pdf [PDF]
- CH14 - Interactions.pdf [PDF]
- 02 - EIS Addendum Vol. 2 - Appendices Part 1 of 2
- 03 - EIS Addendum Vol. 2 - Appendices Part 2 of 2
- Appendix 10.1 to 10.15 - Noise.pdf [PDF]
- Appendix 11.1 - Carbon Assessment LCA_RevA_20240712.pdf [PDF]
- Appendix 11.2 and 11.3 Climate Agreements and Mitigations.pdf [PDF]
- Appendix 13.4.1 - Traffic Counts 2022.pdf [PDF]
- Appendix 13.4.2 - Traffic Counts 2010.pdf [PDF]
- Appendix 13.6.1 - Comah Land Use Assessment.pdf [PDF]
- Appendix 4.1 - 2139-2117 Site Layout Map.pdf [PDF]
- Appendix 6.1 HS24007 Part 1.pdf [PDF]
- Appendix 6.2 HS24007 Part 2.pdf [PDF]
- Appendix 7.1 Intertidal Renmore June 2023.pdf [PDF]
- Appendix 7.10 Invasive Species Management Plan.pdf [PDF]
- Appendix 7.2 Renmore stony bank report.pdf [PDF]
- Appendix 7.3 Galway Bay Subtidal Survey 2023.pdf [PDF]
- Appendix 7.4 Intertidal Renmore 2016.pdf [PDF]
- Appendix 7.5 Bird Report Gittings - GALWAY HARBOUR EXTENSION WATERBIRD SURVEY, WINTER.pdf [PDF]
- Appendix 7.6 Marine Mammal Observer Report.pdf [PDF]
- Appendix 7.7 Marine Mammal Desk Study.pdf [PDF]
- Appendix 7.8 MKO-Bat Report 2023.07.13.pdf [PDF]
- Appendix 7.9 Lagoons Report Final.pdf [PDF]
- Appendix 8.1 HS24007 Part 1.pdf [PDF]
- Appendix 8.2 HS24007 Part 2.pdf [PDF]
- Appendix 9.1 - Dust Management Plan.pdf [PDF]
- 04 - NIS Addendum
- Natura Impact Statement Addendum 2024.pdf [PDF]
- NIS Appendices
- NIS App A - Intertidal Renmore June 2023.pdf [PDF]
- NIS App B - Galway Bay Subtidal Survey 2023.pdf [PDF]
- NIS App C - Marine Mammal Studies.pdf [PDF]
- NIS App D - Lagoons Report Final.pdf [PDF]
- NIS App E - MKO-BR F - 210130 - 2023.07.13.pdf [PDF]
- NIS App F - Renmore stony bank report- John Conaghan Report.pdf [PDF]
- NIS App G - ISMP- F1- 240528- 05.09.2024- RM.pdf [PDF]
- NIS App H -Gittings - GALWAY HARBOUR EXTENSION WATERBIRD SURVEY, WINTER.pdf [PDF]
- NIS App I-1 - GHE NPWS ABP Response Report 22072022.pdf [PDF]
- NIS App I-2 - GHE CMP 22072022.pdf [PDF]
- NIS App I-3 - GHE NIS 26072022.pdf [PDF]
- NIS App I-4 - HLG 00090-24 Signed Letter to ABP - Niamh Thornton.pdf [PDF]
- NIS App I-5 - HLG 00090-24 Appendix 1 Letter from Minister Noonan re Compensatory Measures.pdf [PDF]
- NIS App I-6 - ABP Letter March 2021 Statement of Case.pdf [PDF]
- 7476 270924 GHE Issued ABP.pdf [PDF]
- Applicant response to FI Submissions
- 01 - EIS Addendum Vol. 1 - Main EIS Chapters
- View associated documents
Is féidir tuairimí maidir leis an iarratas nó maidir leis an achomharc a thaisceadh laistigh den tréimhse ama chuí anseo.
Finscéal Léarscáil
- Cás Beo
- Deonaithe
- Diúltaithe
- Neamhbhailí
- Tarraingthe siar
- Féach Cás le haghaidh tuilleadh sonraí
Firefox
Safari
Chrome
Opera
Edge