An Coimisiún Pleanála - Tagairt an cháis: NA29N.314724
Metrolink. Estuary through Swords, Dublin Airport, Ballymun, Glasnevin and City Centre to Charlemont, Co. Dublin
Comhairle Cathrach Bhaile Átha Cliath
Cur síos
Railway (Metrolink - Estuary to Charlemont via Dublin Airport) Order [2022]
Cineál Cáis
Iarratas ar Ordú Iarnróid
Cinneadh
Make Railway Order w cons
Dáta an tsínithe
30/09/2025
TMTT
Tá
RTN
Tá
Páirtithe
-
Transport Infrastructure Ireland (TII) (Applicant)
-
Other parties and observers listed in Appendix 2 of the Inspectors Report
Stair
-
30/09/2025
Make Railway Order w cons
-
30/09/2022
Lodged
Doiciméid
Additional Inspectors Report (314/R314724A.pdf, .PDF format 6068KB)
Additional Meeting Records (314/B314724A.pdf, .PDF format 152KB)
Additional Meeting Records (314/B314724B.pdf, .PDF format 155KB)
-
Case Documentation
- Féach ar dhoiciméid ghaolmhara
- Applicant Documents
- Application Documents
- 1_Application
- FINAL ABP Cover Letter.PDF [PDF]
- MetroLink_Application_Site_Boundary
- MetroLink_Application_Site_Boundary.cpg [CPG]
- MetroLink_Application_Site_Boundary.dbf [DBF]
- MetroLink_Application_Site_Boundary.prj [PRJ]
- MetroLink_Application_Site_Boundary.sbn [SBN]
- MetroLink_Application_Site_Boundary.sbx [SBX]
- MetroLink_Application_Site_Boundary.shp [SHP]
- MetroLink_Application_Site_Boundary.shp.xml [XML]
- MetroLink_Application_Site_Boundary.shx [SHX]
- 2_DRAFT Railway Order
- 3_Railway Order Book of Reference
- 4_Railway Order Drawings
- 5_EIAR
- Volume 1 Book 1 Non Technical Summary
- Volume 2 Introduction and Project Description
- Chapter 01 Introduction.pdf [PDF]
- Chapter 02 Methodology used in Preparation of the EIAR.pdf [PDF]
- Chapter 03 Background to the MetroLink Project.pdf [PDF]
- Chapter 04 Description of the MetroLink Project.pdf [PDF]
- Chapter 05 MetroLink Construction Phase.pdf [PDF]
- Chapter 06 MetroLink Operations and Maintenance.pdf [PDF]
- Chapter 07 Consideration of Alternatives.pdf [PDF]
- Chapter 08 Consultation.pdf [PDF]
- Volume 3 Environmental Baseline and Assessment
- Chapter 09 Traffic and Transport.pdf [PDF]
- Chapter 10 Human Health.pdf [PDF]
- Chapter 11 Population and Land Use.pdf [PDF]
- Chapter 12 Electromagnetic Compatibility and Stray Current.pdf [PDF]
- Chapter 13 Airborne Noise and Vibration.pdf [PDF]
- Chapter 14 Ground-borne Noise and Vibration.pdf [PDF]
- Chapter 15 Biodiversity.pdf [PDF]
- Chapter 16 Air Quality.pdf [PDF]
- Chapter 17 Climate.pdf [PDF]
- Chapter 18 Hydrology.pdf [PDF]
- Chapter 19 Hydrogeology.pdf [PDF]
- Chapter 20 Soils and Geology.pdf [PDF]
- Chapter 21 Land Take.pdf [PDF]
- Chapter 22 Infrastructure and Utilities.pdf [PDF]
- Chapter 23 Agronomy.pdf [PDF]
- Chapter 24 Material & Waste Management.pdf [PDF]
- Chapter 25 Archaeology and Cultural Heritage.pdf [PDF]
- Chapter 26 Architectural Heritage.pdf [PDF]
- Chapter 27 The Landscape.pdf [PDF]
- Chapter 28 Risk of Major Accidents and Disasters.pdf [PDF]
- Chapter 29 Interactions between the various environmental aspects.pdf [PDF]
- Chapter 30 Cumulative impacts of interaction between other projects and MetroLink.pdf [PDF]
- Chapter 31 Summaries of the route wide mitigation and monitoring proposed.pdf [PDF]
- Volume 4 Figures
- Chapter 01 Introduction
- Chapter 02 Methodology used in Preparation of the EIAR
- Chapter 03 Background to the MetroLink Project
- Chapter 04 Description of the MetroLink Project
- Chapter 05 MetroLink Construction Phase
- Chapter 06 MetroLink Operations and Maintenance
- Chapter 07 Consideration of Alternatives
- Chapter 08 Consultation
- Chapter 09 Traffic and Transport
- Figure 9.10 Cycle Trips - Percentage Difference 12hr Scenario A 2035.pdf [PDF]
- Figure 9.11 Cycle Trips - Total Difference 12hr Scenario A 2035.pdf [PDF]
- Figure 9.12 Active Modes - Total Trips Attracted Scenario A 2035 12hr.pdf [PDF]
- Figure 9.13 Active Modes - Total Trips Produced Scenario A 2035 12hr.pdf [PDF]
- Figure 9.14 Mode Share - Sheet 1 of 2 - Scenario A 2035 AM Road.pdf [PDF]
- Figure 9.14 Mode Share - Sheet 2 of 2 - Scenario A 2035 AM PT+Metro.pdf [PDF]
- Figure 9.15 Mode Share - Sheet 1 of 2 - Scenario A 2050 AM Road.pdf [PDF]
- Figure 9.15 Mode Share - Sheet 2 of 2 - Scenario A 2050 AM PT+Metro.pdf [PDF]
- Figure 9.16 Mode Share - Sheet 1 of 2 - Scenario A 2065 AM Road.pdf [PDF]
- Figure 9.16 Mode Share - Sheet 2 of 2 - Scenario A 2065 AM PT+Metro.pdf [PDF]
- Figure 9.17 Mode Share - Sheet 1 of 2 - Scenario A 2035 PM Road Sheet.pdf [PDF]
- Figure 9.17 Mode Share - Sheet 2 of 2 - Scenario A 2035 PM PT+Metro.pdf [PDF]
- Figure 9.18 Mode Share - Sheet 1 of 2 - Scenario A 2050 PM Road Sheet.pdf [PDF]
- Figure 9.18 Mode Share - Sheet 2 of 2 - Scenario A 2050 PM PT+Metro.pdf [PDF]
- Figure 9.19 Mode Share - Sheet 1 of 2 - Scenario A 2065 PM Road.pdf [PDF]
- Figure 9.19 Mode Share - Sheet 2 of 2 - Scenario A 2065 PM PT+Metro.pdf [PDF]
- Figure 9.1 Project's Area of Influence.pdf [PDF]
- Figure 9.2 Existing Road Network near stations - Overall.pdf [PDF]
- Figure 9.20 Mode Share - Sheet 1 of 2 - Scenario B 2035 AM Road.pdf [PDF]
- Figure 9.20 Mode Share - Sheet 2 of 2 - Scenario B 2035 AM PT+Metro.pdf [PDF]
- Figure 9.21 Mode Share - Sheet 1 of 2 - Scenario B 2050 AM Road.pdf [PDF]
- Figure 9.21 Mode Share - Sheet 2 of 2 - Scenario B 2050 AM PT+Metro.pdf [PDF]
- Figure 9.22 Mode Share - Sheet 1 of 2 - Scenario B 2065 AM Road.pdf [PDF]
- Figure 9.22 Mode Share - Sheet 2 of 2 - Scenario B 2065 AM PT+Metro.pdf [PDF]
- Figure 9.23 Mode Share - Sheet 1 of 2 - Scenario B 2035 PM Road.pdf [PDF]
- Figure 9.23 Mode Share - Sheet 2 of 2 - Scenario B 2035 PM PT+Metro.pdf [PDF]
- Figure 9.24 Mode Share - Sheet 1 of 2 - Scenario B 2050 PM Road.pdf [PDF]
- Figure 9.24 Mode Share - Sheet 2 of 2 - Scenario B 2050 PM PT+Metro.pdf [PDF]
- Figure 9.25 Mode Share - Sheet 1 of 2 - Scenario B 2065 PM Road.pdf [PDF]
- Figure 9.25 Mode Share - Sheet 2 of 2 - Scenario B 2065 PM PT+Metro.pdf [PDF]
- Figure 9.26 Changes in Public Transport Link Flows - Scenario A 2035 AM Peak Period.pdf [PDF]
- Figure 9.27 Changes in Public Transport Link Flows - Scenario A 2035 PM Peak Period.pdf [PDF]
- Figure 9.28 Changes in Public Transport Link Flows - Scenario B 2035 AM Peak Period.pdf [PDF]
- Figure 9.29 Changes in Public Transport Link Flows - Scenario B 2035 PM Peak Period.pdf [PDF]
- Figure 9.3 Stations within GDA Cycle Network - Overall.pdf [PDF]
- Figure 9.30 Road Impacts Scenario A AADT Difference 2035.pdf [PDF]
- Figure 9.31 Road Impacts Scenario A AADT Difference 2050.pdf [PDF]
- Figure 9.32 Road Impacts Scenario A AADT Difference 2065.pdf [PDF]
- Figure 9.33 Road Impacts Scenario B AADT Difference 2035.pdf [PDF]
- Figure 9.34 Road Impacts Scenario B AADT Difference 2050.pdf [PDF]
- Figure 9.35 Road Impacts Scenario B AADT Difference 2065.pdf [PDF]
- Figure 9.36 Road Impacts - Delay Scenario A 2035 Difference.pdf [PDF]
- Figure 9.37 Road Impacts - Delay Scenario A 2050 Difference.pdf [PDF]
- Figure 9.38 Road Impacts - Delay Scenario A 2065 Difference.pdf [PDF]
- Figure 9.39 Road Impacts - Delay Scenario B 2035 Difference.pdf [PDF]
- Figure 9.4 Proposed Station Locations.pdf [PDF]
- Figure 9.40 Road Impacts - Delay Scenario B 2050 Difference.pdf [PDF]
- Figure 9.41 Road Impacts - Delay Scenario B 2065 Difference.pdf [PDF]
- Figure 9.42 Passenger Origins within Walking Isochrones.pdf [PDF]
- Figure 9.43 Passenger Destinations within Walking Isochrones.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from Airport Sheet 1 of 5.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from DCU Sheet 2 of 5.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from Swords East Sheet 3 of 5.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from Swords NW Sheet 4 of 5.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from Swords SW Sheet 5 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to Airport Sheet 1 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to DCU Sheet 2 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to Swords East Sheet 3 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to Swords NW Sheet 4 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to Swords SW Sheet 5 of 5.pdf [PDF]
- Figure 9.46 Pedestrian Analysis - 2050 with Metro Comfort Level - Overview.pdf [PDF]
- Figure 9.47 Pedestrian Analysis - 2050 with Metro Comfort Level.pdf [PDF]
- Figure 9.48 Pedestrian Analysis - 2065 with Metro Comfort Level - Overview.pdf [PDF]
- Figure 9.49 Pedestrian Analysis - 2065 with Metro Comfort Level.pdf [PDF]
- Figure 9.5 Stations in Relation to Other Public Transport Facilities.pdf [PDF]
- Figure 9.6 Existing Road Network near stations.pdf [PDF]
- Figure 9.7 Station within GDA Cycle Network.pdf [PDF]
- Figure 9.8 Pedestrian Modelling - Base Comfort Level.pdf [PDF]
- Figure 9.9 HGV Routing Options.pdf [PDF]
- Chapter 10 Human Health
- Chapter 11 Population and Land Use
- Figure 11.1 Study Area for the Population Assessment.pdf [PDF]
- Figure 11.10 Educational Facilities in the Study Area.pdf [PDF]
- Figure 11.11 Open Space in the Study Area.pdf [PDF]
- Figure 11.12 Sports and Recreation Facilities in the Study Area.pdf [PDF]
- Figure 11.13 Public Transport in the Study Area.pdf [PDF]
- Figure 11.14 Road Network in the Study Area.pdf [PDF]
- Figure 11.15 Walking Times from Stations.pdf [PDF]
- Figure 11.16 Driving Times from Stations.pdf [PDF]
- Figure 11.17 Land Use Zoning in the Study Area.pdf [PDF]
- Figure 11.18 Residential Land in the Study Area.pdf [PDF]
- Figure 11.19 Shopping Centres and Retail Clusters in the Study Area.pdf [PDF]
- Figure 11.2 Population Density in the Study Area.pdf [PDF]
- Figure 11.20 Essential Services in the Study Area.pdf [PDF]
- Figure 11.21 Healthcare Facilities in the Study Area.pdf [PDF]
- Figure 11.3 Workplace Zones in the Study Area.pdf [PDF]
- Figure 11.4 Commercial Properties in the Study Area.pdf [PDF]
- Figure 11.5 Tourist Accommodation in the Study Area.pdf [PDF]
- Figure 11.6 Churches, Libraries and Childcare Facilities in the Study Area.pdf [PDF]
- Figure 11.7 Convenience Stores and Supermarkets in the Study Area.pdf [PDF]
- Figure 11.8 Deprivation in the Study Area.pdf [PDF]
- Figure 11.9 Health Status in the Study Area.pdf [PDF]
- Chapter 12 Electromagnetic Compatibility and Stray Current
- Chapter 13 Airborne Noise and Vibration
- Chapter 14 Ground-borne Noise and Vibration
- Figure 14.1 AWN Vibration Monitoring Locations.pdf [PDF]
- Figure 14.2 Groundborne Noise from Tunnel Boring Machine.pdf [PDF]
- Figure 14.3 Vibration from Mechanical Excavation.pdf [PDF]
- Figure 14.4 Blasting Contours of PPV.pdf [PDF]
- Figure 14.5 Blasting Air Overpressure Contours.pdf [PDF]
- Figure 14.6 Groundborne Noise from Operation.pdf [PDF]
- Chapter 15 Biodiversity
- Figure 15.1 Study areas for each ecological receptor.pdf [PDF]
- Figure 15.10 Wintering bird survey results.pdf [PDF]
- Figure 15.11 Suitable amphibian habitat.pdf [PDF]
- Figure 15.12 Suitable Common Lizard Habitat.pdf [PDF]
- Figure 15.13 Ecological Mitigation Measures Habitats within the red line boundary to be retained.pdf [PDF]
- Figure 15.2 Transect routes surveyed for bats and location of bat buildings and static bat detectors.pdf [PDF]
- Figure 15.3 Watercourses in the ZoI of the proposed Project.pdf [PDF]
- Figure 15.4 European sites located within 15km of the proposed Project.pdf [PDF]
- Figure 15.5 Natural Heritage Areas and Proposed Natural Heritage Areas located within 15km of the proposed Project.pdf [PDF]
- Figure 15.6 Habitat survey results (including locations of invasive plant species and relevé locations).pdf [PDF]
- Figure 15.7 Bat survey results (Walked Transect Surveys and Building Surveys).pdf [PDF]
- Figure 15.8 Mammal survey results.pdf [PDF]
- Figure 15.9 Breeding bird survey results.pdf [PDF]
- Chapter 16 Air Quality
- Figure 16.1 Dust Distance Buffers.pdf [PDF]
- Figure 16.10 NO2 Impact (2035) - Operational (A).pdf [PDF]
- Figure 16.11 NO2 Impact (2035) - Operational (B).pdf [PDF]
- Figure 16.12 PM10 Impact (2035) - Operational (A).pdf [PDF]
- Figure 16.13 PM10 Impact (2035) - Operational (B).pdf [PDF]
- Figure 16.14 PM 2.5 Impact (2035) - Operational (A).pdf [PDF]
- Figure 16.15 PM 2.5 Impact (2035) - Operational (B).pdf [PDF]
- Figure 16.2 Air Monitoring Locations.pdf [PDF]
- Figure 16.3 Air Quality Zones.pdf [PDF]
- Figure 16.4 NO2 Impact - Construction Phase - Northern Peak.pdf [PDF]
- Figure 16.5 NO2 Impact - Construction Phase - Southern Peak.pdf [PDF]
- Figure 16.6 PM10 Impact - Construction Phase - Northern Peak.pdf [PDF]
- Figure 16.7 PM10 Impact - Construction Phase - Southern Peak.pdf [PDF]
- Figure 16.8 PM 2.5 Impacts - Construction Phase - Northern Peak.pdf [PDF]
- Figure 16.9 PM 2.5 Impacts (2030) - Construction Phase - Southern Peak.pdf [PDF]
- Chapter 17 Climate
- Chapter 18 Hydrology
- Figure 18.1 Surface Drainage features & WFD Sub-Catchment Delineation.pdf [PDF]
- Figure 18.10 Proposed Drainage Catchment B & Existing Road.pdf [PDF]
- Figure 18.11 Proposed Drainage Catchment C1.pdf [PDF]
- Figure 18.12 Proposed Drainage Catchment C2-D1 Catchment D2.pdf [PDF]
- Figure 18.13 Proposed Drainage Catchment E1 & Depot.pdf [PDF]
- Figure 18.14 Proposed Drainage Catchment F.pdf [PDF]
- Figure 18.2 Surface Drainage and Water Quality Sampling Points.pdf [PDF]
- Figure 18.3 River Flood Extents and Historical River Flood Events.pdf [PDF]
- Figure 18.4 Coastal Flood Extents and Historical River Flood Events.pdf [PDF]
- Figure 18.5 Surface Drainage features and proposed discharge points.pdf [PDF]
- Figure 18.6 Historical Rivers – Dublin City & Environs.pdf [PDF]
- Figure 18.7 Historical Rivers – Dublin (Santry to Royal Canal).pdf [PDF]
- Figure 18.8 Proposed Watercourse Division.pdf [PDF]
- Figure 18.9 Proposed Drainage Catchment A1-Swords Western Distributor Road A2 & Estuary Station Parking.pdf [PDF]
- Chapter 19 Hydrogeology
- Figure 19.1 Regional Bedrock Geology.pdf [PDF]
- Figure 19.2 Aquifer Classification.pdf [PDF]
- Figure 19.3 Aquifer Vulnerability.pdf [PDF]
- Figure 19.4 WFD Groundwater Bodies Status.pdf [PDF]
- Figure 19.5 Groundwater Well Search & Karst Features.pdf [PDF]
- Figure 19.6 Baseline Groundwater Quality Monitoring.pdf [PDF]
- Figure 19.7 Groundwater Recharge.pdf [PDF]
- Figure 19.8 Hydraulic Testing Areas along the Proposed Route.pdf [PDF]
- Chapter 20 Soils and Geology
- Figure 20.1 Teagasc Soil Associations.pdf [PDF]
- Figure 20.10 Crushed Rock Aggregate Potential.pdf [PDF]
- Figure 20.11 SURGE Geochem dataset locations.pdf [PDF]
- Figure 20.12 Radon Potential.pdf [PDF]
- Figure 20.13 Soil Geochemical Data Assessment Criteria exceedances.pdf [PDF]
- Figure 20.14 Groundwater Geochemical Data Assessment Criteria exceedances.pdf [PDF]
- Figure 20.15 Asbestos in soils.pdf [PDF]
- Figure 20.16 Settlement Contours.pdf [PDF]
- Figure 20.2 Quaternary Geomorphology.pdf [PDF]
- Figure 20.3 Quaternary Sediments.pdf [PDF]
- Figure 20.4 Bedrock Geology.pdf [PDF]
- Figure 20.5 Irish Geological Heritage sites.pdf [PDF]
- Figure 20.6 Land contamination.pdf [PDF]
- Figure 20.7 Karst Features.pdf [PDF]
- Figure 20.8 Geohazards.pdf [PDF]
- Figure 20.9 Granular Aggregate potential.pdf [PDF]
- Chapter 21 Land Take
- Chapter 22 Infrastructure and Utilities
- Chapter 23 Agronomy
- Chapter 24 Material & Waste Management
- Chapter 25 Archaeology and Cultural Heritage
- Chapter 26 Architectural Heritage
- Chapter 27 The Landscape
- Chapter 28 Risk of Major Accidents and Disasters
- Chapter 29 Interactions between the various environmental aspects
- Chapter 30 Cumulative impacts of interaction between other projects and MetroLink
- Chapter 31 Summaries of the route wide mitigation and monitoring proposed
- print []
- Volume 5 Appendices
- Chapter 01 Introduction
- Chapter 02 Methodology used in Preparation of the EIAR
- Chapter 03 Background to the MetroLink Project
- Chapter 04 Description of the MetroLink Project
- Chapter 05 MetroLink Construction Phase
- A5.1 Outline CEMP.pdf [PDF]
- A5.10 Watercourse Diversion.pdf [PDF]
- A5.11 Water Management.pdf [PDF]
- A5.12 Piling.pdf [PDF]
- A5.13 Tunnelling.pdf [PDF]
- A5.14 TBM Consumables.pdf [PDF]
- A5.15 Waste Management.pdf [PDF]
- A5.16 Track Laying.pdf [PDF]
- A5.17 Building Damage Report.pdf [PDF]
- A5.18 Construction Lighting.pdf [PDF]
- A5.19 Wider Effects Report.pdf [PDF]
- A5.2 Construction programme Including Tunnel Elements.pdf [PDF]
- A5.20 Blasting Strategy.pdf [PDF]
- A5.3 Construction Sequence Report.pdf [PDF]
- A5.4 Employment Report & Spreadsheet.pdf [PDF]
- A5.5 Glasnevin Construction Report.pdf [PDF]
- A5.6 Abnormal Load Route Survey Report.pdf [PDF]
- A5.7 Construction Vehicles, Plant & Equipment.pdf [PDF]
- A5.8 Demolition General.pdf [PDF]
- A5.9 Demolition Tara St.pdf [PDF]
- Chapter 06 MetroLink Operations and Maintenance
- Chapter 07 Consideration of Alternatives
- A7.1 Fosterstown Options Report.pdf [PDF]
- A7.10 Trinity College - Alignment Options Assessment.pdf [PDF]
- A7.2 Tara St Report.pdf [PDF]
- A7.3 St Stephens Green Report.pdf [PDF]
- A7.4 Charlemont Shafts Options Report.pdf [PDF]
- A7.5 St Stephen's Green Station - Mined Options Review.pdf [PDF]
- A7.6 Depot Location Options Report.pdf [PDF]
- A7.7 St Stephen’s Green Station Study - Alternative Station Location within St Stephen’s Green East Carriageway.pdf [PDF]
- A7.8 St Stephen's Green Station Options Assessment Summary.pdf [PDF]
- A7.9 Terminus Station at Charlemont compared to St. Stephens Green.pdf [PDF]
- Chapter 08 Consultation
- A8.1 Press Release Examples.pdf [PDF]
- A8.10 PR Flyer.pdf [PDF]
- A8.11 PR Public Consultation Report.pdf [PDF]
- A8.12 PR Submission Forms.pdf [PDF]
- A8.13 PR Photos from Consultation Document.pdf [PDF]
- A8.14 ACP Stakeholder Email.pdf [PDF]
- A8.15 ACP Brochure & Feedback Form.pdf [PDF]
- A8.16 Report on the ACP Tunnel Intervention Shaft.pdf [PDF]
- A8.17 STEPS.pdf [PDF]
- A8.18 Summarised Questions.pdf [PDF]
- A8.19 Meetings Register.pdf [PDF]
- A8.2 Media Clippings.pdf [PDF]
- A8.3 Social Media Clippings.pdf [PDF]
- A8.4 EPR Stakeholder Emails.pdf [PDF]
- A8.5 EPR Flyer.pdf [PDF]
- A8.6 EPR Event Photos.pdf [PDF]
- A8.7 EPR Public Consultation Report.pdf [PDF]
- A8.8 PR Stakeholder Emails.pdf [PDF]
- A8.9 PR Newspaper Adverts.pdf [PDF]
- Chapter 09 Traffic and Transport
- Chapter 10 Human Health
- Chapter 11 Population and Land Use
- A11.1 Spatial Data Sources.pdf [PDF]
- A11.2 Commuter Analysis (workplace zone data).pdf [PDF]
- A11.3 Tourist Accomodation.pdf [PDF]
- A11.4 Supermarket Convenience Stores.pdf [PDF]
- A11.5 Social Infrastructure.pdf [PDF]
- A11.6 Open Space, Leisure, Recreation and Sports Facilities.pdf [PDF]
- A11.7 Land Use Zoning.pdf [PDF]
- Chapter 12 Electromagnetic Compatibility and Stray Current
- A12.1 MetroLink Electromagnetic Radiation Baseline Survey Report.pdf [PDF]
- A12.2 Trinity College Dublin Direct Current and Near Direct Current Electromagnetic Radiation Survey Report.pdf [PDF]
- A12.3 Instrument Landing System and Electromagnetic Fields from MetroLink at Dublin Airport.pdf [PDF]
- A12.4 MetroLink DC Field Intensities at Dublin Airport.pdf [PDF]
- A12.5 Flux Valves and Electromagnetic Fields from MetroLink.pdf [PDF]
- A12.6 Trinity College Dublin Direct Current and Near Direct Current Field Simulation Testing Survey Report.pdf [PDF]
- Chapter 13 Airborne Noise and Vibration
- A13.1 Baseline Noise Monitoring Report.pdf [PDF]
- A13.2 Baseline Noise Monitoring Report - Appendices.pdf [PDF]
- A13.3 Baseline Vibration Monitoring Report.pdf [PDF]
- A13.4 Baseline Noise Monitoring NCH and Gate Theatre.pdf [PDF]
- A13.5 Baseline Vibration Monitoring at Trinity College Dublin.pdf [PDF]
- A13.7 Construction Phase modelling.pdf [PDF]
- A13.8 Operational Phase Modelling.pdf [PDF]
- Chapter 14 Ground-borne Noise and Vibration
- A14.1 Relevant guidance and standards.pdf [PDF]
- A14.2 Train Characteristics.pdf [PDF]
- A14.3 Track Support System Assumptions.pdf [PDF]
- A14.4 Groundborne Noise Numerical Modelling Method FINDWAVE.pdf [PDF]
- A14.5 Groundborne Noise and Vibration and Blasting Modelling Results.pdf [PDF]
- A14.6 Airborne Noise & Groundborne Noise Mitigation Policy.pdf [PDF]
- Chapter 15 Biodiversity
- A15.1 MetroLink Invasive Species Technical Report - Glasnevin.pdf [PDF]
- A15.10 Relevant Protective Policies.pdf [PDF]
- A15.2 Desktop Study Results.pdf [PDF]
- A15.3 Habitat Survey Results - Species Lists .pdf [PDF]
- A15.4 Detailed Botanical Data.pdf [PDF]
- A15.5 Breeding Bird Species Recorded.pdf [PDF]
- A15.6 Wintering Bird Species Recorded.pdf [PDF]
- A15.7 Aquatic and Fisheries Assessment Report.pdf [PDF]
- A15.8 Outline Invasive Species Management Plan.pdf [PDF]
- A15.9 Aquatic survey of the Royal Canal at the 5th Level, Phibsborough.pdf [PDF]
- Chapter 16 Air Quality
- Chapter 17 Climate
- Chapter 18 Hydrology
- A18.1 Baseline Surface Water - Laboratory Summary July to August 2018.pdf [PDF]
- A18.2 Baseline Surface Water - Laboratory Summary December 2018.pdf [PDF]
- A18.3 Baseline Surface Water - Laboratory Summary April to May 2019.pdf [PDF]
- A18.4 MetroLink ESBN Construction Methodology of HV Cable Routes.pdf [PDF]
- A18.5 Flood Risk Assessment.pdf [PDF]
- Chapter 19 Hydrogeology
- A19.1 Summary of Analytical Results - GW Initial Interim Rounds for 201819 summary text.pdf [PDF]
- A19.10 Hydrogeological Plan for MetroLink.pdf [PDF]
- A19.11 Hydrogeological Review for Tara Street and Swords Central.pdf [PDF]
- A19.2 Summary of Analytical Results - Groundwater Pumping Test Areas (20192020).pdf [PDF]
- A19.3a Groundwater Monitoring Record Sheets Round 1 2021.pdf [PDF]
- A19.3b Groundwater Monitoring Record Sheets Round 2 2021.pdf [PDF]
- A19.3c Groundwater Monitoring Results Analytical Results 2021.pdf [PDF]
- A19.3d Groundwater Monitoring Results Analytical Results 2021 - Key Text.pdf [PDF]
- A19.4 Groundwater Datalogger Hydrographs (period 2019-2020).pdf [PDF]
- A19.5 Groundwater Contour mapping.pdf [PDF]
- A19.6 Historical Inflows.pdf [PDF]
- A19.7 Groundwater Protection Response Matrix for MetroLink.pdf [PDF]
- A19.8 Seepage Rates Assessment in Stations Executed with Cut & Cover Method (Plaxis2D Modelling).pdf [PDF]
- A19.9 Barrier Effect Assessment with Visual Modflow Software Seatown-Fosterstown, Dardistown, and O’Connell St.pdf [PDF]
- Chapter 20 Soils and Geology
- A20.1 Summary of Supporting Ground Investigation Scope.pdf [PDF]
- A20.2 Summary of Relevant Exploratory Hole Locations and Monitoring Data.pdf [PDF]
- A20.3 Preliminary Conceptual Site Model.pdf [PDF]
- A20.4 Geological Models Stations.pdf [PDF]
- A20.5 Laboratory Data Screening Summaries.pdf [PDF]
- A20.6 Review of Potential Contamination Sources.pdf [PDF]
- A20.7 Updated Conceptual Site Model.pdf [PDF]
- A20.8 Land Contamination Interpretative Report.pdf [PDF]
- A20.9 Gelogical Cross Sections.pdf [PDF]
- Chapter 21 Land Take
- Chapter 22 Infrastructure and Utilities
- Chapter 23 Agronomy
- Chapter 24 Material & Waste Management
- Chapter 25 Archaeology and Cultural Heritage
- A25.1 TII Cultural Heritage Strategy.pdf [PDF]
- A25.2 Griffith Park Station Targeted Archaeological Test Excavations.pdf [PDF]
- A25.3 Archaeological Geophysical Survey Report - St Stephen's Green to Lissenhall.pdf [PDF]
- A25.4 Broadmeadow Archaeological Wade Survey.pdf [PDF]
- A25.5 MetroLink Archaeological Trial Testing Report - Lissenhall Area 1.pdf [PDF]
- A25.6 Dardistown Archaeological Geophysical Survey Report.pdf [PDF]
- A25.7 Geophysical Report -Phase 4 Lissenhall and Naul Road.pdf [PDF]
- Chapter 26 Architectural Heritage
- Chapter 27 The Landscape
- Chapter 28 Risk of Major Accidents and Disasters
- Chapter 29 Interactions between the various environmental aspects
- Chapter 30 Cumulative impacts of interaction between other projects and MetroLink
- Chapter 31 Summaries of the route wide mitigation and monitoring proposed
- Chapter 01 Introduction
- 6_Appropriate Assessment Screening Report and Natura Impact Statement
- 7_Planning Report
- 8_Miscellaneous
- Notifications to Prescribed Bodies
- Attachment 1 – Registered Post Final issue of the original RO application owner-occupier packs 19th September.pdf [PDF]
- Attachment 2 - Follow up Express Post issue of the original RO application owner-occupier packs 27th September..pdf [PDF]
- Attachment 3 -Registered Post Final issue of RO omitted document and extended period for making submissions owner-occupier packs 29th November.pdf [PDF]
- Attachment 4- Courier delivery record.pdf [PDF]
- Attachment 5 – Copy letter from An Bord Pleanála dated 7 December 2022.pdf [PDF]
- L0285_2022_12_16_ABP Letter .pdf [PDF]
- 1_Application
- Further Information - Updated Book of Reference - 12th June 2024
- BoR Schedules 2-10.PDF Version
- Schedule 10 Book 1 of 1.pdf [PDF]
- Schedule 2 Book 1 of 2.pdf [PDF]
- Schedule 2 Book 2 of 2.pdf [PDF]
- Schedule 3 Book 1 of 4.pdf [PDF]
- Schedule 3 Book 2 of 4.pdf [PDF]
- Schedule 3 Book 3 of 4.pdf [PDF]
- Schedule 3 Book 4 of 4.pdf [PDF]
- Schedule 4 Book 1 of 2.pdf [PDF]
- Schedule 4 Book 2 of 2.pdf [PDF]
- Schedule 5 Book 1 of 1.pdf [PDF]
- Schedule 6 Book 1 of 1.pdf [PDF]
- Schedule 7 Book 1 of 1.pdf [PDF]
- Schedule 8 Book 1 of 1.pdf [PDF]
- Schedule 9 Book 1 of 1.pdf [PDF]
- Cover Letter from TII - 12th June 2024.pdf [PDF]
- Email link and Cover letter for Book of Reference.pdf [PDF]
- Table 1 Amendments to Metrolink Book of Reference.pdf [PDF]
- Table 1 Amendments to Metrolink Book of Reference_Legend.pdf [PDF]
- Table 2 Amendments to MetroLink Book of Reference.pdf [PDF]
- BoR Schedules 2-10.PDF Version
- Misc Correspondence
- 19 September 23 - Request for extension of time - granted - last date 27 September 23.pdf [PDF]
- Corres rec'd from applicant re request for response - iss'd 28 August 23.pdf [PDF]
- Corres received from applicant regarding request for response 24th August 23.pdf [PDF]
- Draft RailwayOrder.pdf [PDF]
- Email 23rd Nov 22 - Update to Owners and Occupiers.pdf [PDF]
- Email 23rd Nov 22 list of owners associated to Metrolink project.pdf [PDF]
- Email 7th Dec 22 - confirm that the landowners served with notice of the Railway Order..pdf [PDF]
- Email A&L agent for TII - 21.10.24.pdf [PDF]
- Email from Applicant regarding Book of Reference - 16th May 2024.pdf [PDF]
- Email thread with TII - OH Docs and Book of Reference - 15th August 2024.pdf [PDF]
- Letter received seeking date of oral hearing - 10th Nov 23.pdf [PDF]
- Letter to ABP from A&L - 21.10.24.pdf [PDF]
- Response re Board's request for new notices email and letter received from TII on 22nd July 2024.pdf [PDF]
- TII confirming response to ABP letter from 01.07.24 on or before 22 July.pdf [PDF]
- TII proof of postage - 19 Dec 22- ack letter sent 22 Dec 22.pdf [PDF]
- New Public Notices and related Docs - August 2024
- Email enclosing Newspaper Notices and TII letters to Presribed Bodies.pdf [PDF]
- Index of OH Documents & Updated Book of Reference Presented for 2nd Statutory Public Consultation rec'd 16.08.24 - ABP-314724-22.pdf [PDF]
- Letter from TII to ABP dated 14 August 2024.pdf [PDF]
- Related email from TII dated 14th August 2024.pdf [PDF]
- Significant Further Information Newspaper Notice.pdf [PDF]
- TII letters issued to Prescribed Bodies - 2nd August 2024.pdf [PDF]
- Response to Further Information Submissions
- Response to Further Public Notice
- 25-11-22 TII - Irish Independent.pdf [PDF]
- 25-11-22 TII - Irish Times.pdf [PDF]
- Appendix A9.2M Traffic and Transportation Assessment St Stephens Green Station.pdf [PDF]
- Cover Letter.pdf [PDF]
- Email correspondence 23rd Nov 22 - Response to further public notice request TII.pdf [PDF]
- Email correspondence 25th Nov 22.pdf [PDF]
- Modified Document Draft Newspaper Notice re extension 21.11.22 (002).pdf [PDF]
- Notification letter to ABP.pdf [PDF]
- Notification letter to landowners and occupiers.pdf [PDF]
- Notification letter to prescribed bodies.pdf [PDF]
- Transmittal.pdf [PDF]
- Response to Wild Irish Defence Submission
- Cover email from TII to ABP - 31.01.25.pdf [PDF]
- Cover email from TII to ABP providing appendices - 31.01.25.pdf [PDF]
- Letter from ALG to ABP dated 31 January 2025.pdf [PDF]
- Post Oral Hearing_AA Update - Final.pdf [PDF]
- Response to Wild Ireland Defence Submission.pdf [PDF]
- Update to the Cumulative Impact Assessment Report.pdf [PDF]
- Responses to Submissions
- Cover Letter enclosing Response to Submissions.pdf [PDF]
- EXCEL FILES - 1st November 2023
- 000_OPW Full Suite.pdf [PDF]
- 001_ACRA and Ballymun Road North_Response Register.pdf [PDF]
- 002 - ACRA (Association of Combined Residence Association) Response Register.pdf [PDF]
- 003. Response Register ABP-314724-22 - Aiden Cyril Forde.pdf [PDF]
- 004 Aine Wellard Response Register.pdf [PDF]
- 005 Alstead Securities Limited Response Register.pdf [PDF]
- 006_Amanda Hughes_Response Register.pdf [PDF]
- 007 An Post Response Register.pdf [PDF]
- 008 An Taisce Response Register.pdf [PDF]
- 009_Andrew Conlon and Maeve Fitzpatrick_Response Register.pdf [PDF]
- 010 - Andrew Whelan Response Register.pdf [PDF]
- 011_Anne Behan and John Kearns Response Register v1.pdf [PDF]
- 012_Anne Confrey_Response Register.pdf [PDF]
- 013_Anne G Meehan_Response Register.pdf [PDF]
- 014. Ashley Estate Residents Response Register.pdf [PDF]
- 015 Barry and Aileen Dempsey_Text agreed with AF.pdf [PDF]
- 016_049_083_084_086_091_120_138_157_164_172_197_207_267 Various covering the above submission No.'s (refer to index).pdf [PDF]
- 017_038_061_147_158_184_201_294_308_Response Register.pdf [PDF]
- 018_Ben and Tatiana Hurley.pdf [PDF]
- 019_Berkeley Road Services and Traders Association_Response Register.pdf [PDF]
- 020 Bernard Seymour Response Register.pdf [PDF]
- 021 Bindford Limited Response Register.pdf [PDF]
- 022 BORG Developments and JOM Investments Response Register.pdf [PDF]
- 023 Bovale Developments ULC Response Register.pdf [PDF]
- 024 Bovale ULC and Balheary Properties ULC Response Register.pdf [PDF]
- 025_Breda Scully_Response Register.pdf [PDF]
- 026_Brendan Flanagan_Response Register.pdf [PDF]
- 027 Brendan Heneghan Response Register.pdf [PDF]
- 028_Brendan Howley_Response Register.pdf [PDF]
- 029 Brian McGrath Response Register.pdf [PDF]
- 030 Brigid Purcell Response Register_.pdf [PDF]
- 031 Butterfield District Residents Association Response Register.pdf [PDF]
- 032 Cairn Homes Properties Limited Response Register.pdf [PDF]
- 033_Caitriona and Ciaran Byrne_Response Register.pdf [PDF]
- 034 Caitriona Shaffrey Response Register.pdf [PDF]
- 035 Carmen Neary Response Register.pdf [PDF]
- 036 Caroline Eyre O Connor Response Register.pdf [PDF]
- 037 Caroline Regan and family Response Register.pdf [PDF]
- 039_Catherine Foley and Keith Madden_Response Register.pdf [PDF]
- 040. Charlemont and Dartmouth Community Dartmouth Road Response Register.pdf [PDF]
- 041. Charlemont and Dartmouth Community Dartmouth Square West Response Register.pdf [PDF]
- 042_Charlemont and Dartmouth Community Group_General Area Submission_Response Register.pdf [PDF]
- 043 - Ciaran Black and Leon McCarthy Response Register.pdf [PDF]
- 044 Ciaran Cuffe Response Register.pdf [PDF]
- 045_Claire Dunne_Response Register.pdf [PDF]
- 046_CLG Na Fianna CO Cormac O Donnchu_Response Register.pdf [PDF]
- 047. Colin Torpay Response Register ABP-314724-22.pdf [PDF]
- 048 College and Wainsfort Residents Association Response Register.pdf [PDF]
- 050 Commission for Rail reg Response Register.pdf [PDF]
- 051 Conor and Lorraine Power Response Register.pdf [PDF]
- 052 Coras Iompair Eireann Response Register.pdf [PDF]
- 053 Core Capital Response Register.pdf [PDF]
- 054_Cormac McKay and Aeravai_Response Register.pdf [PDF]
- 055 - Dan Coulcher and Paula Fyans Response Register.pdf [PDF]
- 056 DECC Geological Survey Ireland Response Register.pdf [PDF]
- 057- Declan Ryan Response Register.pdf [PDF]
- 058_Deirdre Byrne and Family_Response Register.pdf [PDF]
- 059_Deirdre Vaughan_Response Register.pdf [PDF]
- 060 - Denis McLoughlin and Teresa Reid Response Register.pdf [PDF]
- 062_Desmond and Kathleen Rice_Response Register.pdf [PDF]
- 063_DAU.pdf [PDF]
- 064 Devonmill Limited Response Register.pdf [PDF]
- 065 - Diarmuid Burke Response Register.pdf [PDF]
- 066_District 7 Community Alliance_Response Register.pdf [PDF]
- 067_Donal O'Brolcain_Response Register.pdf [PDF]
- 068 Dublin Airport.pdf [PDF]
- 069 Dublin Central GP Limited Response Register.pdf [PDF]
- 070_Dublin Chamber_Response Register.pdf [PDF]
- 071 Dublin City Council Response Register.pdf [PDF]
- 072_Dublin Commuter Coalition_Response Register.pdf [PDF]
- 073_Dublin Cycling Campaign_Response Register.pdf [PDF]
- 074 Duncan Smith Response Register.pdf [PDF]
- 075_Dympna Rooney_Response Register.pdf [PDF]
- 076_Eamonn Smyth_Response Register.pdf [PDF]
- 077_177_206_Response Register.pdf [PDF]
- 078 Earl Court Management Company DAC Response Register.pdf [PDF]
- 079 Earldev Properties Unlimited Company Response Register.pdf [PDF]
- 080 Earlsfort Basin Limited Response Register.pdf [PDF]
- 081 - Edward Kelly and Joyce MacRedmond.pdf [PDF]
- 082_EirGrid plc_Response Register.pdf [PDF]
- 085 - Emma Kelly Response Register.pdf [PDF]
- 087_ESB Telecoms Limited_Response Register.pdf [PDF]
- 088 Espirit Investments Limited Response Register.pdf [PDF]
- 089_Estuary Court Residents Association 2_Response Register.pdf [PDF]
- 090_Estuary Court Residents Association 1_Response Register.pdf [PDF]
- 092 Failte Ireland Response Register ABP-314724-22.pdf [PDF]
- 093 Farrier Technology Limited Response Register.pdf [PDF]
- 094_St Josephs Church.pdf [PDF]
- 095_Fingallian's GAA Club_Response Register.pdf [PDF]
- 096_Fiona O'Kelly_Response Register.pdf [PDF]
- 097_Frances Maguire_Response Register.pdf [PDF]
- 098 - Frank McDonald Response Register.pdf [PDF]
- 099. GADRA Response Register Base.pdf [PDF]
- 100 - Geraldine Ann Cusack and Geraldine O'Connell Cusack Response Register.pdf [PDF]
- 101 - Gerard F Brouder Response Register.pdf [PDF]
- 102 Gerard Gannon Properties Response Register.pdf [PDF]
- 103_&_285 (Gerhard and Rosemary Mayrhuber,& Susan Cosgrove).pdf [PDF]
- 104_Glasnevin Village Residents Association_Response Register.pdf [PDF]
- 105_Godfrey Gillett.pdf [PDF]
- 106 Grace Bible Fellowship Response Register.pdf [PDF]
- 107 Grace Maguire Response Register.pdf [PDF]
- 108 Grand Parade Property Trading Company DAC Response Register.pdf [PDF]
- 109 Greybirch Limited Response Register.pdf [PDF]
- 110 Hammerson ICAV Response Register.pdf [PDF]
- 111_Hampstead Residents CLG_Response Register.pdf [PDF]
- 112 Hedigans Limited (Michael and Peter Hedigan) Response Register.pdf [PDF]
- 113. Helen and Luke Sherlock.pdf [PDF]
- 114_Helena Kelly.pdf [PDF]
- 115 Hertz Europe Service Centre Limited Response Register.pdf [PDF]
- 116 Hibernia Real Estate Group Limited Response Register.pdf [PDF]
- 117 Hines Real Estate Ireland Limited Response Register.pdf [PDF]
- 118 HSE National Drug Treatment Centre Response Register.pdf [PDF]
- 119 Hugo Byrne CO John Byrne Response Register.pdf [PDF]
- 121 Ianrod Eireann Response Register.pdf [PDF]
- 122 Institutional Investment Partners GmbH Response Register.pdf [PDF]
- 123_124_Iona and District Residents Association_Response Register.pdf [PDF]
- 125 IPUT plc and Irish Life Assurance plc Response Register.pdf [PDF]
- 126_Irene Sorohan.pdf [PDF]
- 127 Irish Airline Pilots Association Response Register.pdf [PDF]
- 128_Irish Georgian Society_Response Register.pdf [PDF]
- 129 Irish Life Assurance plc. (19-20 Earlsfort Terrace and 65A Adelaide Road) Response Register.pdf [PDF]
- 130 Irish Life Assurance plc. (4 Earlsfort Terrace) Response Register.pdf [PDF]
- 131 Irish Life Assurance plc. (70 St Stephens Green) Response Register.pdf [PDF]
- 132 Irish Life Assurance plc. (Earlsfort Terrace Block C) Response Register.pdf [PDF]
- 133 Irish Water Response Register.pdf [PDF]
- 134 Ivana Bacik Response Register_New.pdf [PDF]
- 135 J. Murphy (Developments) Limited Response Register.pdf [PDF]
- 136 James Geoghegan Response Register.pdf [PDF]
- 137 - James Wickham Response Register.pdf [PDF]
- 139_Jennie McGee and Ian Kelly_Response Register.pdf [PDF]
- 140 Jerdip Properties Unlimited Company Response Register.pdf [PDF]
- 141_Jian Cheng and Family_Response Register.pdf [PDF]
- 142 Jim O'Callaghan Response Register.pdf [PDF]
- 143_Johann Harty_Response Register.pdf [PDF]
- 144 John A Ryan Response Register.pdf [PDF]
- 145- John and Josianne Bullows Response Register.pdf [PDF]
- 146 - John and Josianne Bullows Response Register.pdf [PDF]
- 148 - John Bernard Reid Response Register.pdf [PDF]
- 149 - John Conway and Orlaith McCarthy Response Register.pdf [PDF]
- 150 - John Lawlor Response Register.pdf [PDF]
- 151 - John Loughrey Response Register.pdf [PDF]
- 152_John McGreevy_Response Register.pdf [PDF]
- 153 John Neary and Kathleen White Response Register.pdf [PDF]
- 154_Jonathan Healy_Response Register.pdf [PDF]
- 155 Juliana and Joe Boland and Family Response Register.pdf [PDF]
- 156. Justin Marden .pdf [PDF]
- 159_Kathleen McDonagh.pdf [PDF]
- 160. Kathleen Shields.pdf [PDF]
- 161_Kevin Muaghan.pdf [PDF]
- 162_Kieran Smyth and Margaret McDonnell and others_Response Register.pdf [PDF]
- 163 Knocklyon Network CLG (1).pdf [PDF]
- 165 KW Real Estate ICAV Response Register.pdf [PDF]
- 166 Leo and Anne Crehan Response Register.pdf [PDF]
- 167 Leonard Kinsella Response Register.pdf [PDF]
- 168_Lesley Hewson_Response Register.pdf [PDF]
- 169 LIDL Ireland GmbH Response Register.pdf [PDF]
- 170 - LOKRA Lower Kimmage Road Residents Association Response Register.pdf [PDF]
- 171_Lorraine Rooney_Response Register.pdf [PDF]
- 173_Louise Broughton and Glenn Sharpe_ Response Register_rev.pdf [PDF]
- 174 M.E. Hanashoe Solicitors Response Register.pdf [PDF]
- 175_Management Company Board_Response Register.pdf [PDF]
- 176_Margaret Morrissey_Response Register.pdf [PDF]
- 178_179_195_Response_Register.pdf [PDF]
- 180_Marie McMahon_Response Register.pdf [PDF]
- 181 Marie Sherlock Response Register.pdf [PDF]
- 182_Mark Campbell and Aimee O'Farrell_Response Register.pdf [PDF]
- 183 - Mark O'Connell Response Register.pdf [PDF]
- 185 Mary Fitzpatrick Response Register_New.pdf [PDF]
- 186_Mater Hospital.pdf [PDF]
- 188_Maureen O'Scanaill_Response Register.pdf [PDF]
- 189_Metro South West Group _Response Register .pdf [PDF]
- 190 - Michael A Doyle and Carmel Smith Doyle Response Register.pdf [PDF]
- 191 - Michael B Barry Response Register.pdf [PDF]
- 192 Michael McDowell Response Register.pdf [PDF]
- 193_Michael Quinn_Response Register.pdf [PDF]
- 194_Ambasador Theatre.pdf [PDF]
- 196 Mouna Unlimited Company Response Register.pdf [PDF]
- 198_The National Disability Authority_Response Register.pdf [PDF]
- 199 NTA Response Register_New.pdf [PDF]
- 200 Neasa Hourigan Response Register_New.pdf [PDF]
- 202 Niall Lynch Response Register.pdf [PDF]
- 203 - Niall Parsons Response Register.pdf [PDF]
- 204 - Niall Parsons Response Register.pdf [PDF]
- 205 - Nicholas Mansergh Response Register.pdf [PDF]
- 208 - Nigel Clerkin Response Register.pdf [PDF]
- 209_Nigel Mallen_Response Register.pdf [PDF]
- 210. Nuala Kelly .pdf [PDF]
- 211 October Investments Limited Response Register.pdf [PDF]
- 212_Olan O'Brien_Response Register.pdf [PDF]
- 239 OPW (St Stephens Green Park and cover letter).pdf [PDF]
- 241. Orwell Park (Templeogue) Residents Association.pdf [PDF]
- 242 O'Scanaill Veterinary Hospital Response Register.pdf [PDF]
- 247_Owners of 9, 10 and 11 Nelson Street_Response Register.pdf [PDF]
- 248_Pat and Barbara McCormack_Response Register.pdf [PDF]
- 249 Patricia Roe Response Register_New.pdf [PDF]
- 250 Patricia Whyte Response Register.pdf [PDF]
- 251_Paul and Brian Connell_Response Register.pdf [PDF]
- 252_Paul Cusack_Response Register.pdf [PDF]
- 253_Paul Hughes_Response Register.pdf [PDF]
- 254 - Paul McAuliffe Response Register.pdf [PDF]
- 255_Peter and Breda Gregory_Response Register_draft.pdf [PDF]
- 256 - Peter Schneider Energy Consultants Response Register.pdf [PDF]
- 257 Peter Twamley.pdf [PDF]
- 258_Phibsboro Village Tidy Towns_Response Register.pdf [PDF]
- 259 - Prionsias Mac Fhlannchadha Response Register.pdf [PDF]
- 260_Prospect Architectural Conservation Area (ACA)_Response Register.pdf [PDF]
- 261_Rail Users Ireland_Response Register.pdf [PDF]
- 262 - Rathgar Residents Association Response Register.pdf [PDF]
- 263 Recorders Residents Association Response Register.pdf [PDF]
- 264_Rethink Metrolink_Response Register.pdf [PDF]
- 265 RGRE Burlington Limited and RGRE Harcourt Terrace Limited Response Register.pdf [PDF]
- 266 - Richard Guiney Response Register.pdf [PDF]
- 268 Rohan Holdings Limited Response Register.pdf [PDF]
- 269 Roisin Shortall Response Register_New.pdf [PDF]
- 270_Royal Canal Clean Up_Response Register.pdf [PDF]
- 271_Ruadhan MacEoin_Response Register.pdf [PDF]
- 272 - Sadhbh O Neill Response Register.pdf [PDF]
- 273 SAINFOIN PROPERTY COMPANY LIMITED Response Register.pdf [PDF]
- 274 - Santry Forum Response Register.pdf [PDF]
- 275_Sarah Meredith_Response Register.pdf [PDF]
- 276_Save Markievicz Pool & Gym Campaign (John Dean)_Response Register.pdf [PDF]
- 277_Seatown Villas Residents_Response Register.pdf [PDF]
- 278 Shandon Mill Owners Management Company CLG Response Register.pdf [PDF]
- 279_Shandon Residents Association_Response Register.pdf [PDF]
- 280_Shira Mehlman_Response Register.pdf [PDF]
- 281_Sinead Quilty_Response Register.pdf [PDF]
- 282 Smokin Bones LTD Response Register.pdf [PDF]
- 283 Smyths Toys Superstores Response Register.pdf [PDF]
- 284. St.Annes Resident's Association .pdf [PDF]
- 286- Suzi Taylor and G.l Taylor Response Register.pdf [PDF]
- 287 Tanat Limited Response Register.pdf [PDF]
- 288 Tanrat Limited TA Starbucks Response Register.pdf [PDF]
- 289 Terenure West Residents Association Response Register.pdf [PDF]
- 290 Tesco Ireland Response Register.pdf [PDF]
- 291_The Abbey Theatre.pdf [PDF]
- 292_The CMCCG Action Group (Sabine Klinger)_Response Register.pdf [PDF]
- 293 The Foley Family Response Register.pdf [PDF]
- 295_The Residents of Albert College Lawn_Response Register.pdf [PDF]
- 296 The Rotunda Hospital Response Register.pdf [PDF]
- 297 Thomas Harty Response Register.pdf [PDF]
- 298 - Thomas Herlihy Response Register.pdf [PDF]
- 300 Tom Harrington Response Register.pdf [PDF]
- 301 - Tony Graham Response Register.pdf [PDF]
- 302 Townsend Apartments Management Company Limited Response Register.pdf [PDF]
- 303_TCD Response Sheet.pdf [PDF]
- 304 Troys Butchers Response Register.pdf [PDF]
- 305 Union Investment Real Estate GmbH Response Register.pdf [PDF]
- 306_University College Dublin (UCD)_Response Register.pdf [PDF]
- 307 - Upper Leeson Street Area Residents Association Response Register .pdf [PDF]
- 309. Response Register ABP-314724-22 - Vincent Harrison and others 2.pdf [PDF]
- 310_Vincent Harrison and others_Response Register.pdf [PDF]
- 311_Voice of Vision Impairment_Response Register.pdf [PDF]
- 312_Waterways Ireland.pdf [PDF]
- 313 Westward Group Ltd Response Register.pdf [PDF]
- 314 Will Phelan Response Register.pdf [PDF]
- 315_Woodies DIY co Grafton Group PLC_Response Register.pdf [PDF]
- 316 WORK residents Association (Michael Griffin).pdf [PDF]
- 317 Wynn's Hotel Response Register.pdf [PDF]
- 318 Yu Miao Yang YMY Ltd Response Register.pdf [PDF]
- 319_Yvonne Allen.pdf [PDF]
- 320 Yvonne Collins Response Register_New.pdf [PDF]
- FCC Response Register.pdf [PDF]
- Observation Statement.pdf [PDF]
- Response Sheet_243_244_245_246_OLV Church_Schools.pdf [PDF]
- Response to Submissions.pdf [PDF]
- TII Response to Submissions 001 to 140.pdf [PDF]
- TII Response to Submissions 141 to 320 + FCC.pdf [PDF]
- Application Documents
- Commission Documents
- 2nd July 24 - Notification of Publishing of Notices.pdf [PDF]
- ABP Internal Memo - Request for Submission from FCC - 26th April 23.pdf [PDF]
- ABP response to further subs received from Metro SW Group -5th Oct 23.pdf [PDF]
- ABP response to TII enquiry - 25th July 2024.pdf [PDF]
- Ack letter - Dublin City Council.pdf [PDF]
- Ack letter - Fingal County Council.pdf [PDF]
- Ack letter 22 Dec to TII.pdf [PDF]
- Ack letter issued in response to further submissions- 04.04.25.pdf [PDF]
- Ack letter TII 10th Oct 22.pdf [PDF]
- Ack letter to TII - response to FI submissions - 10th December 2024.pdf [PDF]
- Ack letter to TII 29th Nov 22.pdf [PDF]
- Ack letter to TII Re Response to Submissions booklets -29th Sep 2023.pdf [PDF]
- Ack of response to Wild Irish Defense Submission - TII - 05.02.25.pdf [PDF]
- Acknowledgement letter TII - 22 Dec.pdf [PDF]
- Address for M.E. Hanahoe Solicitors agent updated - 9th August 23.pdf [PDF]
- Change of Address - Bernard Seymor & Colin Torpay.pdf [PDF]
- Circulation letter - 41 FI Subs - TII - 18th Oct 2024.pdf [PDF]
- Circulation letter - TII- 04th Nov 2024.pdf [PDF]
- Circulation Letter - Withdrawn Submissions - 3rd Oct 23.pdf [PDF]
- Circulation Letter to Applicant - 12 FI Subs - 07.04.25.pdf [PDF]
- Circulation letters 07 Feb to TII and PA's.pdf [PDF]
- Circulation Letters 10th March 2023.pdf [PDF]
- Circulation of 8 withdrawals to TII- 18th April 2024.pdf [PDF]
- Circulation of 8 Withdrawn Submissions to TII .pdf [PDF]
- Circulation of FCC Report to TII.pdf [PDF]
- Circulation of Fingal County Council Report.pdf [PDF]
- Circulation of Withdrawn Sub by Maureen O'Scanaill to TII.pdf [PDF]
- Clarification email Re Book of Reference - 16th July 2024.pdf [PDF]
- Clarification issued to TII - 03.07.24.pdf [PDF]
- Confirmation of withdrawal from Our Lady of Victories Schools.pdf [PDF]
- Copy of ABP letter dated 1st July 2024 to TII - Circulated to Prescribed Bodies on 8th July 2024.pdf [PDF]
- Email chain and letter to Applicant regarding Book of Reference - 21st May 2024.pdf [PDF]
- Fingal County Council Report issued to Fingal County Council, Dublin City Council & TII - 15th June 23.pdf [PDF]
- Inspector's Memo dated 24th April 2024 Re new public notices.pdf [PDF]
- Invite Subs in relation to TII Sub 31.01.25.pdf [PDF]
- Letter 14th Dec to TII.pdf [PDF]
- Letter from ALG to ACP - 29th July 2025.pdf [PDF]
- letter issued - Invite to respond - ld for response 11.12.24 - 14.11.24.pdf [PDF]
- Letter issued to Minister for Transport - 30th April 2024.pdf [PDF]
- letter to Cormac Mc Kay Re OH time slot - 6th February 2024.pdf [PDF]
- Letter to Fingal CC inviting comments - 28th April 23.pdf [PDF]
- Letter to Fingal County Council 28th April 23 inviting comments.pdf [PDF]
- Letter to Minister for Transport 23rd Nov 22 - re railway designation as metro.pdf [PDF]
- Letter to TII requesting publishing of notices -1st July 2024.pdf [PDF]
- Letter to TII - Further public notice required - 22nd Nov 22.pdf [PDF]
- Letter to TII - Updated Draft Railway Order Book of Reference - 26th April 2024.pdf [PDF]
- Letter to TII 22nd Nov 22 - Further public notice required.pdf [PDF]
- Letter to TII dated 1st July 2024 requesting publishing of notices.pdf [PDF]
- Letter to TII dated 26th April 2024 - Updated Draft Railway Order Book of Reference.pdf [PDF]
- Letter to TII requesting copies of FI newspaper notice.pdf [PDF]
- Letter to Uisce Éireann inviting submission re FI - 16th Oct 2024.pdf [PDF]
- Notification letter inviting TII to respond to FI subs - 11.11.24.pdf [PDF]
- Notification to Designated Bodies - 08 July 2024.pdf [PDF]
- Notification to TII - Donal O'Brolcain Sub.pdf [PDF]
- Oral Hearing
- ABP Internal Memo - Oral Hearing Reccomendation.pdf [PDF]
- Letter Re OH to Aine Wellard.pdf [PDF]
- Letter re Oral - Hearing 27 July 23.pdf [PDF]
- Letter re Oral Hearing - Voice of Vision Impairment - 28th July 23.pdf [PDF]
- OH Agenda - 26th February 2024.pdf [PDF]
- OH Agenda - 4th March 2024.pdf [PDF]
- OH Agenda - 19.02.24.pdf [PDF]
- OH Agenda - 26th February 2024.pdf [PDF]
- OH Agenda and letters issued to invalid observers- 30th January 2024.pdf [PDF]
- OH Agenda and letters issued to parties - Part 1 - 30th January 2024.pdf [PDF]
- OH Agenda and letters issued to parties - Part 2 - 30th January 2024.pdf [PDF]
- OH Agenda re-issued to Townsend Apartment Management Company.pdf [PDF]
- OH letter issued to Aine Wellard in Braille - 28th July 23.pdf [PDF]
- Oral Hearing Notification Letters - 8th Jan 24.pdf [PDF]
- Request Publishing of Notices-(TII) - 1st July 2024.pdf [PDF]
- Revised OH Agenda - 26th February 2024.pdf [PDF]
- Revised OH Agenda - 4th March 2024.pdf [PDF]
- REVISED OH Agenda - 12th February 2024.pdf [PDF]
- Refund Letters
- Request for Proof of Postage for PB Notification Letters - 6th Dec 22.pdf [PDF]
- Request Publishing of Notice - (TII) - 1st July 2024.pdf [PDF]
- TII Letter received 9th Novemeber 2023.pdf [PDF]
- Withdrawal Submission by Maureen O'Scanaill circulated to TII.pdf [PDF]
- Oral Hearing Documents (19th February - 28th March 2024)
- Day 01 - 19th February 2024
- Attendance Sheet - Day 1 - 19th February 2024.pdf [PDF]
- Documents Received - Day 1 - 19th February 2024.pdf [PDF]
- No.01 - TII - slide-deck.pdf [PDF]
- No.02 - TII - Witness Statement of Aidan Foley.pdf [PDF]
- No.03 - TII - Stakeholder Communications Plan.pdf [PDF]
- No.04 - TII - Metrolink Preferred Route Design.pdf [PDF]
- No.05 - TII - Property-owners-protection-scheme (POPS).pdf [PDF]
- No.06 - TII - Collins Avenue Environmental Assessment Report of Options.pdf [PDF]
- No.07 - TII - Draft Guidance Note for developers.pdf [PDF]
- No.08 - TII - Witness Statement of Ronan Hallissey - Final.pdf [PDF]
- No.09 - TII - Schedule of Errata.pdf [PDF]
- No.10 - TII - Errata Appendix 4 Chapter 9 Erratum.pdf [PDF]
- No.11 - TII - Errata Appendix 5 Chapter 14 GBNV Addendum.pdf [PDF]
- No.12 - TII - Errata Appendix 10 Updated Appendix A13.7 Charlemont Station.pdf [PDF]
- No.13 - TII - Errata Appendix 11 Updated A14.5 Groundborne Noise and Vibration and Blasting Modelling Results.pdf [PDF]
- No.14 - TII - Errata Appendix 12 Updated and Additional GBNV Figures1.pdf [PDF]
- No.15 - TII - Errata Appendix 13 Addendum to EIAR Chapter 24.pdf [PDF]
- No.16 - TII - Errata Appendix 14 Errata Planning Report.pdf [PDF]
- No.17 - TII - Schedule of Updates.pdf [PDF]
- No.18 - TII - Updates Appendix 1 R132 Landscape Amendments.pdf [PDF]
- No.19 - TII - Updates Appendix 2 SantryLodge-AHIA.pdf [PDF]
- No.20 - TII - Updates Appendix 3 Operational Stage Impact on Development Potential.pdf [PDF]
- No.22 - TII - Updates Appendix 5 Updated Planning Report.pdf [PDF]
- No.23 - TII - Updates Appendix 6 FINAL Redline - UPDATED FINAL Draft Railway Order - MetroLink(73110936.1).pdf [PDF]
- No.24 - TII - Updates Appendix 7 Review of GDA Transport Modelling Impacts.pdf [PDF]
- No.25 - TII - Updates Appendix 8 Impact on the Preliminary Design Building Damage Assessment Results due to Imposition of Limits of Deviation.pdf [PDF]
- No.26 - TII - Updates Appendix 9 Ground Movement Instrumentation and Monitoring Note.pdf [PDF]
- No.27 - TII - Update Appendix 10 Outline Mobility Management Plan.pdf [PDF]
- No.28 - Updates Appendix 11 DART MetroLink Sequencing.pdf [PDF]
- No.29 - Book of Updated Railway Order Drawings.pdf [PDF]
- No.30 - TII - Witness Statement of Avril Challoner.pdf [PDF]
- No.31 - TII - Witness Statement of Rob Goodbody.pdf [PDF]
- No.32 - TII - Witness Statement of John Kehoe.pdf [PDF]
- No.33 - TII - Witness Statement of Paul Brown.pdf [PDF]
- No.34 - TII - Witness Statement of Michael Horan.pdf [PDF]
- No.35 - TII - MetroLink Amendments to Book of Reference (included in Michael Horan's witness statement).pdf [PDF]
- No.36 - TII - Metrolink-Land-Acquisition-Strategy (included in Michael Horan's Witness Statement).pdf [PDF]
- No.37 - TII - metrolink_cpoguideline_final_september-2022 (included in Michael Horan's Witness Statement).pdf [PDF]
- No.38 - TII - Witness Statement of Sandeep Upadhya.pdf [PDF]
- No.39 - TII - legal-submissions-metrolink-19-february-2024.pdf [PDF]
- No.40 - Fingal County Council.pdf [PDF]
- No.41 - An Taisce.pdf [PDF]
- No.42 - OPW.pdf [PDF]
- No.43 - NTA.pdf [PDF]
- Day 02 - 20th February 2024
- Day 03 - 21st February 2024
- Attendance Sheet - Day 3 - 21st February 2024.pdf [PDF]
- Documents Received - Day 3 - 21st February 2024.pdf [PDF]
- No.01 - Estuary Courts Residents Association.pdf [PDF]
- No.02 - AZ1 O'Scanaills 210224.pdf [PDF]
- No.03 - AZ1 Seatown West & Estuary Court 21.02.24.pdf [PDF]
- No.04 - Updates Appendix 6 [UPDATED] FINAL Draft Railway Order - MetroLink.pdf [PDF]
- No.05 - metrolink-guidance-note-for-developers-draft.pdf [PDF]
- No.06 - DCU Collins Avenue Groundwater Flow Pattern.pdf [PDF]
- No.07 - Collins Avenue Population Projections.pdf [PDF]
- No.08 - Equine and Veterinary Assessment report by Michael P. Sadlier.pdf [PDF]
- No.09 - Metrolink Dublin Swords to City Centre - Module 1 - Presentation booklet.pdf [PDF]
- No.10 - LIdl Ireland GMBH - Response to TII comments on item 10.pdf [PDF]
- No.11 - Lidl Ballymun Metrolink Site - attachment 4A.pdf [PDF]
- No.12 - legal submission by Eamon Galligan SC - LIdl Site at Ballymun.pdf [PDF]
- No.13 - Mouna Unlimited - tunneling & Excavation issues & airborne noise & vibration.pdf [PDF]
- No.14 - Mouna Unlimited - Tunneling & Excavation Related issues.pdf [PDF]
- No.15 - Mouna Unlimited - Module 1 - AZ3- Dardistown Section (Dublin Airport SOuth Portal).pdf [PDF]
- No.16 - Hampstead Residents - 10 Hampstead Avenue.pdf [PDF]
- Day 04 - 22nd February 2024
- Attendance Sheet - Day 4 - 22nd February 2024.pdf [PDF]
- Documents Received - Day 4 - 22nd February 2024.pdf [PDF]
- No.01 - Louise Boughton - Comments and Issues re MetroLink Application by TII.pdf [PDF]
- No.02 - Louise Boughton - Railway Works Property Details Drawing St Canice's Road to Griffith Avenue.pdf [PDF]
- No.03 - Louise Boughton - Railway Works Property Details Drawing Hampstead Avenue.pdf [PDF]
- No.04 - Louise Boughton - Photograph of Louise Broughton's House.pdf [PDF]
- No.05 - TII - Alternative Station Location at Albert College Park Support slides.pdf [PDF]
- No.06 - GADRA Griffith Avenue & Districts Residents Association - OH Submission and Conclusions.pdf [PDF]
- No.07 - TII - Metrolink Regenerative Breaking Technical Note.pdf [PDF]
- No.08 - TII - Metrolink Figure 14.8 EIAR proposed locations for Floating Slab Track drawings DR-Y-40021 to DR-Y-40027.pdf [PDF]
- No.09 - TII - Letter from Roadstone to TII re Acceptance of Article 27 Compliant Material at Huntstown Quarry.pdf [PDF]
- Day 05 - 26th February 2024
- Attendance Sheet - Day 5 - 26th February 2024.pdf [PDF]
- Documents Received - Day 5 - 26th February 2024.pdf [PDF]
- No.01 - OPW - Outline Legal Submission of the OPW.pdf [PDF]
- No.02 - OPW - Booklet of Authorities for OPW Submission to ABP
- 00. Cover Page & Contents - Booklet of Authorities for OPW Submission to ABP.pdf [PDF]
- 01. Commissioners of Public Works (Functions and Powers) Act, 1996.pdf [PDF]
- 02. St Stephen's Green (Dublin) Act, 1877.pdf [PDF]
- 03. The National Monuments Act, 1930.pdf [PDF]
- 04. National Monuments (Amendment) Act, 2004.pdf [PDF]
- 05. The Historic and Archaeological Heritage and Miscellaneous Provisions Act, 2023.pdf [PDF]
- 06. Dublin Transport Act, 2008 Transport (Railway Infrastructure) Act, 2001.pdf [PDF]
- 07. Transport (Railway Infrastructure) Act, 2001.pdf [PDF]
- 08. Architectural Heritage (National Inventory) & Historical Monuments (Miscellaneous Provisions) Act '99.pdf [PDF]
- 09. EU Regulations, 2012 (S.I. No. 249 of 2012).pdf [PDF]
- 10. S.I. No. 528 of 2020.pdf [PDF]
- 11. Planning and Development Regulations 2001 (S.I. No. 600 of 2001) [Part 2 of Schedule 5].pdf [PDF]
- 12. The EU (Railway Orders) (Environmental Impact Assessment) (Amendment) Regulations, 2021.pdf [PDF]
- 13. Directive 2011-92-EU of the European Parliament and of the Council of 13 December 2011.pdf [PDF]
- 14. Council Directive 92-43-EEC of 21 May 1992.pdf [PDF]
- No.03 - TII - Agreed Submission with OPW (letter to Rosemary Collier).pdf [PDF]
- No.03a - TII - Agreed Submission with OPW (Drawings).pdf [PDF]
- No.04 - TII - Draft Schedule of Railway Order Conditions.pdf [PDF]
- No.05 - TII - Glasnevin Construction Sequencing.pdf [PDF]
- No.06 - TII - DCC Conditions Charlemont Estuary (letter to Deirdre Scully).pdf [PDF]
- No.07 - TII - DAA Conditions Charlemont Estuary (letter to Eamonn Kelly).pdf [PDF]
- No.08 - TII - Corrected Contour Drawings.pdf [PDF]
- No.09 - TII - Impact of Dublin City Transport on Metrolink Haulage Routes.pdf [PDF]
- No.10 - TII - Charlemont Passenger Figures.pdf [PDF]
- Day 06 - 27th February 2024
- Attendance Sheet - Day 6 - 27th February 2024.pdf [PDF]
- Documents Received - Day 6 - 27th February 2024.pdf [PDF]
- No.01 - Lesley Hewson.pdf [PDF]
- No.02 - Dympna Roony & Lorraine Rooney.pdf [PDF]
- No.03 - Anne G Meehan
- No.04 - Management Company Board on Behalf of the Court.pdf [PDF]
- No.05 - Claire Dunne.pdf [PDF]
- No.08 - Brendan Flanagan.pdf [PDF]
- No.09 - Nelson Property Management Company.pdf [PDF]
- No.10 - Breda Scully.pdf [PDF]
- No.12 - TII (Applicant)
- 1. Uisce Eireann CEO Letter to TII.pdf [PDF]
- 2. Note on Nevinstown to R132 Link Road.pdf [PDF]
- 3a. Airport Tunnel Drawing_1_ML1-JAI-ARD-ROUT_XX-DR-Y-03035.pdf [PDF]
- 3b. Airport Tunnel Drawing_2_ML1-JAI-ARD-ROUT_XX-DR-Y-03036.pdf [PDF]
- 4. Dewatering - Permeabilities Targeted with Grout Bottom Plug.pdf [PDF]
- 5. Audibility of Alarms in Stations Note.pdf [PDF]
- 6. Technical Note on Excavated Material.pdf [PDF]
- Day 07 - 28th February 2024
- Attendance Sheet - Day 7 - 28th February 2024.pdf [PDF]
- Documents Received - Day 7 - 28th February 2024.pdf [PDF]
- No.01 - Rotunda Hospital - concerns.pdf [PDF]
- No.02 - Milennium Theatre Company - not proceeding.pdf [PDF]
- No.03 - Esprit Investments - vertical deviation.pdf [PDF]
- No.04 - TII - Cumulative Impacts Addendum Report.pdf [PDF]
- No.05 - Grey Birch - noise dust vibrator impacts.pdf [PDF]
- No.06 - TII - GSWR Rail Bridge Clearance.pdf [PDF]
- No.07 -Aistead Securities - email notifying non attendance at hearing.pdf [PDF]
- No.08 - Wynns Hotel- Noise Impacts.pdf [PDF]
- No.09 - Floating Slab Track Locations.pdf [PDF]
- No.09(A) - MetroLink Floating Slab Track (Maps).pdf [PDF]
- No.10 - TII - legal submissions.pdf [PDF]
- No.11 - TII - Fire Strategy and Intervention Shaft.pdf [PDF]
- No.12 - TII - R132 Seatown Villas Retained Cut Section.pdf [PDF]
- No.13 - TII - Derivation of the Single Bore Tunnel as the Proposed MetroLink Tunnel Option.pdf [PDF]
- No.14 - TII - Glint and Glare Assessment.pdf [PDF]
- No.15 - TII - Jacobs IDOM Working Hours 28.02.24.pdf [PDF]
- No.16 - TII - Explanation of Bentonite Usage Rate.pdf [PDF]
- No.17 - TII - Prediction of Groundborne Noise from Groundborne Vibration.pdf [PDF]
- No.18 - TII - Gillarduzzi Paper.pdf [PDF]
- No.19 - TII - investigating property drainage along Dublin Port Tunnell.pdf [PDF]
- Day 08 - 29th February 2024
- Attendance Sheet - Day 8 - 29th February 2024.pdf [PDF]
- Documents Received - Day 8 - Thursday 29th February 2024.pdf [PDF]
- No 01 - TII - Letters from Mater Hospital to TII - 28.02.24.pdf [PDF]
- No 02 - TII - Provisions for Control of TBM Launch and Reception at Station Boxes.pdf [PDF]
- No 03 - Update to Chapter 5 MetroLink Construction Phase - Working Hours.pdf [PDF]
- No 04 - TII - Updated Appendix A5.5 Figures.pdf [PDF]
- No 05(i) - TII - Additional GBNV Commitments.pdf [PDF]
- No 05(ii) - TII - Additional GBNV Commitments - Supporting Presentation.pdf [PDF]
- No 06 - TII - Tunnel Lining Support - Note of Half Built Rings.pdf [PDF]
- No 07 - TII - List of Oral Hearing Speakers as of 29 February 2024.pdf [PDF]
- No 08 - TII - Ch.13 Airborne Noise and Vibration - Errata Table Mater Station.pdf [PDF]
- No 09 - TII - Letter from Dublin Fire Brigade to TII - 28.02.24.pdf [PDF]
- No 11 - Earldev Properties Unlimited company
- ABP-314724-22 - OH Submission - 11(1) - Earldev Properties Unlimited Company.pdf [PDF]
- ABP-314724-22 - OH submission - 11(2) - Earldev Properties Unlimited Company.pdf [PDF]
- ABP-314724-22 - OH submission - 11(3) - Earldev Properties Unlimited Company.pdf [PDF]
- ABP-314724-22 - OH submission - 11(4) - Earldev Properties Unlimited Company.pdf [PDF]
- ABP-314724-22 - OH submission - 11(5) - Earldev Properties Unlimited Company.pdf [PDF]
- ABP-314724-22 - OH submission - 11(6) - Earldev Properties Unlimited Company.pdf [PDF]
- ABP-314724-22 - OH submission - 11(7) - Earldev Properties Unlimited Company.pdf [PDF]
- ABP-314724-22 - OH submission - 11(8) - Earldev Properties Unlimited Company.pdf [PDF]
- No10(1) - TII - Stakeholder Engagement Plan - Updated 29 February 2024.pdf [PDF]
- No10(2) - TII - List of Additional Mitigation Measures - Schedule of Env Commitments.pdf [PDF]
- No12(1) - TII - Cover note on Glint and Glare Survey.pdf [PDF]
- No12(2) - TII - Management of Bentonite Slurry during Tunnelling.pdf [PDF]
- Day 09 - 4th March 2024
- Attendance Sheet - Day 9 - 4th March 2024.pdf [PDF]
- Documents Received - Day 9 - 4th March 2024.pdf [PDF]
- No.01 - waterman moylan- potential effects on AerCap House.pdf [PDF]
- No.02 - Hines Real Estate - Effects on Aer Cop house Summary presentation.pdf [PDF]
- No.03 - Hines Real Estate Ireland - Legal Submission.pdf [PDF]
- No.04 - Irish Life - Statement on behalf of Irish Life Assurance.pdf [PDF]
- No.05 - Irish Life - EIAR.pdf [PDF]
- No.06 - Waterman moylan - potential effect on Cadenza Bldg.pdf [PDF]
- No.07 - Irish Life - Potential effect on cadenza Bldg.pdf [PDF]
- No.08 - BDA facade consultants.pdf [PDF]
- No.09 - Irish Life - Effect on Facade of Cadenza Bldg.pdf [PDF]
- No.10 - Railway order Estuary to Charlemont via Dublin Airport.pdf [PDF]
- No.11 - Irish Life.pdf [PDF]
- No.12 - TII - Submission of Agreement with Fingal Co. Co.pdf [PDF]
- No.13 - TII - Response to Hampstead Residents CLG.pdf [PDF]
- No.14 - TII - Response to Submissions of the Elected Representatives at Charlemont Station.pdf [PDF]
- No.15 - TII - Tunnel Alignment Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-02027.pdf [PDF]
- No.15 - TII - Tunnel Alignment Option_2 Sheets_Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-0102.pdf [PDF]
- No.15 - TII - Underground Pumping Station_Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-00601.pdf [PDF]
- No.16 - Charlemont and Dartmouth Community grp - affects of ground movement.pdf [PDF]
- No.17 - Charlemont and Dartmouth Community Grp - tunnelling & excavation related issues.pdf [PDF]
- No.18 - Charlemont and Dartmouth Community grp - acoustics and vibration impacts.pdf [PDF]
- No.19 - Suzie Taylor - withdrawn.pdf [PDF]
- Day 10 - 5th March 2024
- Attendance Sheet - Day 10 - 5th March 2024.pdf [PDF]
- Documents Received - Day 10 - 5th March 2024 (Digital Copy).pdf [PDF]
- Documents Received - Day 10 - 5th March 2024.pdf [PDF]
- No.01 - TII (Jacobs IDOM) - Response to Earldev Submission
- No.02 - Jerry Barnes.pdf [PDF]
- No.03 - Union Investment Real Estate GmbH.pdf [PDF]
- No.04 - Grand Parade Property Trading Company DA.pdf [PDF]
- No.05 - Ciaran Black & Leon McCarthy, Michael Doyle & Carmel Smith Doyle.pdf [PDF]
- No.06 - Lorraine and Conor Power.pdf [PDF]
- No.07 - Denis McLoughlin & Teresa Reid.pdf [PDF]
- No.08 - John Conway & Orlaith McCarthy.pdf [PDF]
- No.09 - Leo Crehan.pdf [PDF]
- No.10 - TII - Email from Waterways Ireland to TII dated 1 March 2024.pdf [PDF]
- No.11 - TII - Metrolink TBM Mode of Operation.pdf [PDF]
- No.12 - TII - Noise Control from Fixed Installations.pdf [PDF]
- No.13 - TII - Update to R132 Seatown Villas Retained Cut Section.pdf [PDF]
- No.14 - TII - Low Point Sump Construction Method Statement.pdf [PDF]
- No.15 - TII - POPS Boundary Map.pdf [PDF]
- No.16 - TII - Dewatering assessment in Station Boxes and SCL Tunnels.pdf [PDF]
- No.17 - TII - MetroLink Monitoring During Construction.pdf [PDF]
- No.18 - TII - Additional GBNV commitment.pdf [PDF]
- No.19 - TII - Risk Management Plan (TAP).pdf [PDF]
- No.20 - Frank McDonald.pdf [PDF]
- No.21 - Metro South West.pdf [PDF]
- No.22 - Earldev.pdf [PDF]
- Day 11 - 6th March 2024
- Attendance Sheet - Day 11 - 6th March 2024.pdf [PDF]
- Documents Received - Day 11 - 6th March 2024.pdf [PDF]
- No.01 - TII - Revised Drawings Updated Tunnel Alignment St. Stephen's Green-Charlemont RO Application Alignment and Deeper Vertical Alignment Option 2 Sheets.pdf [PDF]
- No.02 - TII - Airborne Rail Noise Effects at Glasnevin during Metrolink Project.pdf [PDF]
- No.03 - TII - Metrolink-Mouna Private Rising Main Interface - Technical Note and Drawings.pdf [PDF]
- No.04 - TII - Methodology used for assessments of the likely significant effects on buildings from ground movement and settlement (Response to Charlemont Residents).pdf [PDF]
- No.05 - Trinity College Dublin.pdf [PDF]
- No.06 - TII - Further Revised Drawings on Tunnel Alignment St Stephen's Green-Charlemont RO Application VS Deeper Vertical Option.pdf [PDF]
- No.07 - TII - Property Owners' Protection Scheme Updated 6 March 2024.pdf [PDF]
- No.08 - TII - Property Owners' Protection Scheme Drawings.pdf [PDF]
- No.09 - TII - Supplemental Note on Dewatering assessment in Station Boxes and SCL Tunnels v2.pdf [PDF]
- No.10 - TII - Trigger Action Plan Note No.2 - Applicable Locations.pdf [PDF]
- No.11 - TII - Assessment of Borehole Data at Arthur Cox Building and Cadenza Building.pdf [PDF]
- No.12 - TII - Working Draft - Process for the Oversight and Implementation of Phase 3 Assessments.pdf [PDF]
- No.13 - TII - Addendum to EIAR – Downward Realignment St Stephen’s Green to Charlemont.pdf [PDF]
- No.14 - TII - Appropriate Assessment Screening Update Report.pdf [PDF]
- Day 12 - 7th March 2024
- Attendance Sheet - Day 12 - 7th March.pdf [PDF]
- Documents Received - Day 12 - 7th March 2024.pdf [PDF]
- No.01 - John Spain Associates - IPUT plc and Irish Life Assurance.pdf [PDF]
- No.02 - TII - List of Oral Hearing Speakers as of 7 March 2024 (End of Module 1).pdf [PDF]
- No.03 - TII - Witness Statement of Andrew Speer.pdf [PDF]
- No.04 - TII -Chapter 16 Air Quality Ecology Related Addenda to EIAR.pdf [PDF]
- No.05 - TII - EIAR Biodiversity Update Report and Drawings.pdf [PDF]
- No.06 - Estuary Court Residents Assocation.pdf [PDF]
- No.07 - Fingallians GAA Club - 7th March.pdf [PDF]
- No.07 - Fingallians GAA Club - Addendum.pdf [PDF]
- No.08 - Juliana and Joe Boland & Family.pdf [PDF]
- No.09 - TII - MetroLink Appropriate Assessment Update Report (resubmitted 7 March 2024).pdf [PDF]
- Day 13 - 11th March 2024
- Attendance Sheets - Day 13 - 11th March 2024.pdf [PDF]
- Documents Received - Day 13 - 11th March 2024.pdf [PDF]
- List of OH Submissions - Day 13 - 11.03.24.pdf [PDF]
- No.01 - Mr McGreavy.pdf [PDF]
- No.02 - Lidl Ireland GmbH - Introduction to Presentation .pdf [PDF]
- No.03 - Lidl Ireland GmbH - Rebuttal to Submissions Attachment 1.pdf [PDF]
- No.04 - Lidl Ireland GmbH - Future Development of Subject Site.pdf [PDF]
- No.05 - Lidl Ireland GmbH - Mixed use retail development Northwood.pdf [PDF]
- No.06 - Lidl Ireland GmbH - Current scheme with exclusion sones overlaid – (3 A3 size drawings).pdf [PDF]
- No.07 - Lidl Ireland GmbH - Civil Structural Engineering Report – Module 2.pdf [PDF]
- No.08 - Lidl Ireland GmbH - Legal submission.pdf [PDF]
- No.09 - TII - Review of Charlemont Station.pdf [PDF]
- No.10 - TII - Response to public representatives.pdf [PDF]
- No.11 - TII - Note on removal of pipe and instream supporting structure at the Broadmeadow River.pdf [PDF]
- No.12 - Sainfoin Property Company Ltd - Agreement reached with TII (will not be attending OH).pdf [PDF]
- Day 14 - 12th March 2024
- Attendance Sheet - Day 14 - 12th March 2024.pdf [PDF]
- Documents Received - Day 14 - 12th March 2024.pdf [PDF]
- No.01 - ACRA & Ballymun Road.pdf [PDF]
- No.02 - TII - Collins Avenue EPR Summary Presentation.pdf [PDF]
- No.03 - TII - MetroLink AZ4 Collins Avenue Presentation.pdf [PDF]
- No.04 - ACRA & Ballymun Road.pdf [PDF]
- No.05 - Hampstead Residents CLG.pdf [PDF]
- No.06 - Louise Boughton.pdf [PDF]
- No.07 - Griffith Avenue & Residents Association.pdf [PDF]
- No.08 - Anne Meehan.pdf [PDF]
- No.09 - Prospect Architectural Conservation Area.pdf [PDF]
- No.10 - TII - OH Station Architecture Glasnevin Presentation.pdf [PDF]
- No.11 - TII - Updates to STMP Haulage Route.pdf [PDF]
- No.12 - TII - Updates to Scheme Traffic Management Plan 12.03.24.pdf [PDF]
- Day 15 - 13th March 2024
- Attendance Sheet - Day 15 - 13th March 2024.pdf [PDF]
- Documents Received - Day 15 - 13th March 2024.pdf [PDF]
- No. - Letter from FitzGerald and Co (on behalf of Our Lady of Victories Schools) 12 March 2024.pdf [PDF]
- No.01 - TII - Revision - Updates to Scheme Traffic Management Plan - 120324.pdf [PDF]
- No.02 - Davey Smith - Lands identified on Metrolink location map.pdf [PDF]
- No.03 - TII - Proposed alternative site access - aerial view photo.pdf [PDF]
- No.04 - Farrier Technology - submission to the draft railway order (Prospect Avenue).pdf [PDF]
- No.05 - Iona & District Residents Assoc - Iona District Traffic Situation, Survey, and Solutions.pdf [PDF]
- No.06 -Management Company Board on behalf of the court - written narrative.pdf [PDF]
- No.07 - Claire Dunne - Written narrative.pdf [PDF]
- No.08 - Hedigans Ltd - Brian Boru House history.pdf [PDF]
- No.09 - TII - MetroLink - Architecture Station Integration and Common Components Overview Presentation.pdf [PDF]
- No.10 - TII - Flow Estimate - Royal Canal Way.pdf [PDF]
- No.11 - Sarah Meredith - Narrative.pdf [PDF]
- No.12 - Shandon Mill Owners - Response by Martin O'Malley.pdf [PDF]
- No.13 - Andrew Conlon & Maeve Fitzpatrick - OH Narrative.pdf [PDF]
- No.14 - Nelson Property Mgmt - OH Narrative.pdf [PDF]
- No.15 - Breda Scully - OH Narrative.pdf [PDF]
- No.16 - Brendan Flanagan - OH Narrative.pdf [PDF]
- No.17 - TII - Errata Chapter 18 Hydrology - Temporary Instream Works at Broadmeadow River.pdf [PDF]
- No.18 - TII - Environmental Commitments agreed with Our Lady of Victories Schools.pdf [PDF]
- No.19 - Shandon Residents Association - An Bord Pleanala Oral Hearing Metrolink.pdf [PDF]
- No.20 - Vincent Harrison & Others - Metrolink Pinch Point & Access.pdf [PDF]
- Day 16 - 19th March 2024
- Attendance Sheet - Day 16 - 19th March 2024.pdf [PDF]
- Documents Received - Day 16 - 19th March 2024.pdf [PDF]
- No.01 - District 7 Community Alliance.pdf [PDF]
- No.02a - Donal O'Brolcáin - Presentation ABP Oral Hearing 19Mar2024 (1).pptx [PPTX]
- No.02b - Donal O'Brolcáin - Presentation Final with Addendum.pdf [PDF]
- No.03 - The Heritage Council.pdf [PDF]
- No.04 - Mater Railing Length and Green Space.pdf [PDF]
- No.05 - Update to Chapter 5 Construction Compound Spatial Requirements_U.pdf [PDF]
- No.06 - Estimation of Flows along Royal Canal.pdf [PDF]
- No.07 - Fingallians Pitches Photomontages 190324.pdf [PDF]
- No.08 - Presentation on O'Connell Street Station.pdf [PDF]
- Day 17 - 20th March 2024
- Attendance Sheet - Day 17 - 20th March 2024.pdf [PDF]
- Documents Received - Day 17- 20th March 2024.pdf [PDF]
- No.01 - Townsend Apartment Managmement Company Ltd.pdf [PDF]
- No.02 - Legal Rep for Owner Occupiers in College Gate.pdf [PDF]
- No.03 - Tom Corr (Egan Submission).pdf [PDF]
- No.04 - TII - Hostile Vehicle Mitigation Presentation.pdf [PDF]
- No.05 - TII - Tara Station Mined Option Presentation.pdf [PDF]
- No.06 - TII - Tara Station Location Options Considered - Supporting Slides.pdf [PDF]
- No.07 - TII - Charlemont Luas- Stairs and Lift Connection.pdf [PDF]
- No.08 - TII - EIAR Addendum - Leinster Street Pumping Station.pdf [PDF]
- No.09 -TII - Errata relating to EIAR Chapter 11- Population and Land Use.pdf [PDF]
- No.10 - TII - Pedestrian Impact Assessment at Dartmouth Road.pdf [PDF]
- No.11 - TII - Dublin Airport - NTA Passenger Survey - Foreword.pdf [PDF]
- No.11 - TII - Dublin Resident_anon.pdf [PDF]
- No.11 - TII - Dublin Resident_anon.xlsx [XLSX]
- No.12.0 - Save Markievicz Pool & Gym.pdf [PDF]
- No.12.1 - Save Markievicz Pool & Gym.pdf [PDF]
- No.12.2 - Save Markievicz Pool & Gym.pdf [PDF]
- Day 18 - 21st March 2024
- Documents Received - Day 18 - 21st March 2024.pdf [PDF]
- No.01 - Bernard Seymour.pdf [PDF]
- No.02 - TII - (1) Markievicz Pool and Gym.pdf [PDF]
- No.02 - TII - (3) Markievicz pool and gym 3.pdf [PDF]
- No.02 - TII- (2) Jacobs Tara street station.pdf [PDF]
- No.03 - TII - Jacobs IDOM Report Enhanced Building Report Arthur Cox.pdf [PDF]
- No.03 - TII - Jacobs IDOM Report Enhanced Building Report Cadenza.pdf [PDF]
- No.03 -TII - Jacobs IDOM Report Enhanced Building Report Aercap House.pdf [PDF]
- No.04 - Letter from Earldev Properties Unlimited Company to TII.pdf [PDF]
- No.05 - Letter from Jerdip Properties Unlimited Company to TII.pdf [PDF]
- No.06 - Hines Real Estate Ireland Ltd. (Aercap House).pdf [PDF]
- No.06 - BDA - Aercap house metrolink interface.pdf [PDF]
- No.06 - Brady Shipman Martin.pdf [PDF]
- No.06 - Waterman Moylan - review of metrolink rail order - R. Osborne.pdf [PDF]
- No.07.1 - Irish LIfe Assurance.pdf [PDF]
- No.07.2 - waterman moylan - review of metrolink rail order.pdf [PDF]
- No.07.3 - BDA - Cadenza Metrolink Interface.pdf [PDF]
- No.07.4 - Allergo acoustics.pdf [PDF]
- No.07.5 - Statement of evidence - Conor O'Donnell.pdf [PDF]
- No.08 - TII - Enhanced Assessment Overview.pdf [PDF]
- No.09 - Buildings Desk Study.pdf [PDF]
- No.10 - TII - Educational and Jobs Forecasts-Collins Avenue.pdf [PDF]
- No.11 - TII - Status of Buildings on Moore Street.pdf [PDF]
- No.12 - TII - EIAR Addendum_OConnell Street.pdf [PDF]
- No.13 - TII - note on issues raised by residents of harcourt terrace.pdf [PDF]
- No.14 - TII - Planning Report Update 210324.pdf [PDF]
- No.15 - TII - Technical Note - Toilet facilities at Stations.pdf [PDF]
- No.16 - TII - Technical Note - OCSOCR Benefits vs 3rd Rail.pdf [PDF]
- No.17 - TII - EPA.pdf [PDF]
- No.18 - TII - Accessibility statement.pdf [PDF]
- No.19 - TII - Photomontage OConnell Street Upper.pdf [PDF]
- No.20 - TII - Figure 20_16 Settlement Contour Drawings.pdf [PDF]
- No.21 - TII - Building TAPS.pdf [PDF]
- No.22 - TII - Buildings Desk Study.pdf [PDF]
- No.23 - TII - Enhanced Assessment Overview.pdf [PDF]
- Day 19 - 25th March 2024
- Attendance Sheet - Day 19 - 25th March 2024.pdf [PDF]
- Documents Received - Day 19 - 25th March 2024.pdf [PDF]
- No.01(i) - Recorders Residents Association.pdf [PDF]
- No.01(ii) - Recorders RA - Atkins Luas Metro Plan 1998.jpg [JPG]
- No.01(iii) Recorders RA - Comparison of Public Transport SE v SW.pdf [PDF]
- No.02(i) - Metro South West Group.pdf [PDF]
- No.02(ii) - Metro South West Group - OH Presentation.pdf [PDF]
- No.03 - Charlemont & Dartmouth Community Group.pdf [PDF]
- No.04 - Union Investment Real Estate GmbH.pdf [PDF]
- No.05 - TII - Schedule of Errata Draft.pdf [PDF]
- No.06 - TII - Schedule of Updates Draft.pdf [PDF]
- No.07 - TII - Buildings Desk Study.pdf [PDF]
- No.08(i) - TII - Arboricultural Impact Report.pdf [PDF]
- No.08(ii) - TII - Appendices to Arboricultural Impact Assessment Report.pdf [PDF]
- No.09 - TII - Note on Plan Level Biodiversity Policy Compliance.pdf [PDF]
- No.10 - TII - Appendix A5.1 Outline Construction Environmental Management Plan.pdf [PDF]
- No.11 - TII - Summaries of the Route-wide Mitigation & Monitoring Proposed.pdf [PDF]
- No.12 - TII - Working Draft Additional Environment Commitments.pdf [PDF]
- No.13(i) - TII - AIA Drawings.pdf [PDF]
- No.13(ii) - TII - Updated Drawing Combined.pdf [PDF]
- No.14 - TII - Charlemont Drop-off Biodiversity Update Report.pdf [PDF]
- Day 20 - 26th March 2024
- Attendance Sheet - Day 20 - 26th March 2024.pdf [PDF]
- Documents Received - Day 20 - 26th March 2024.pdf [PDF]
- No.01 - OPW - David Browne.pdf [PDF]
- No.02 - Brendan Heneghan.pdf [PDF]
- No.03 - TII - NTA's ERM Model.pdf [PDF]
- No.04 - Caitriona Shaffrey.pdf [PDF]
- No.06 - Suzie Taylor.pdf [PDF]
- No.07 - Conor & Lorraine Power.pdf [PDF]
- No.08 - John Conway & Orlaith McCarthy.pdf [PDF]
- No.09 - Rethink Metrolink.pdf [PDF]
- No.10 - Dr Nicholas Mansergh.pdf [PDF]
- No.11(i) - TII - FURTHER UPDATED FINAL Draft Railway Order.pdf [PDF]
- No.11(ii) - TII - Further Updated Redline - FINAL Draft Railway Order.pdf [PDF]
- No.12 - TII - Utilities and Infrastructure Amendments Swords Pumping Station.pdf [PDF]
- No.13 - TII - Additional Errata Relating to Chapter 20.pdf [PDF]
- No.14 - TII - Hines Transport Statement - Charlemont Planning Barriers.pdf [PDF]
- No.15(i) - TII - Ch. 31 Summaries of The Route-wide Mitigation and Monitoring Proposed.pdf [PDF]
- No.15(ii) - TII - Appendix A5.1.pdf [PDF]
- No.16 - TII - Drawing - General Arrangement Ballymun (Sheet 4 of 11).pdf [PDF]
- No.17 - TII - Grand Parade Drop Off Construction Summary.pdf [PDF]
- No.18 - Leo Crehan & Anne Crehan - Witness Statement Module 2.pdf [PDF]
- Day 21 - 27th March 2024
- Attendance Sheet - Day 21 - 27th March 2024.pdf [PDF]
- Documents Received - Day 21 - 27th March 2024.pdf [PDF]
- No.01 - TII - Estuary to Charlemont Updated Drawings.pdf [PDF]
- No.02 - TII - Cycle Parking Overview.pdf [PDF]
- No.03 - ACRA.pdf [PDF]
- No.04 - Andrew Whelan.pdf [PDF]
- No.05 - TII - Cycle Parking Review.pdf [PDF]
- No.06 - Dublin Commuter Coalition - Jason Cullen.pdf [PDF]
- No.07 - Dublin Cycling Campaign - Mr Baker.pdf [PDF]
- No.08 - Christy O'Sullivan.pdf [PDF]
- No.09 - TII - Greybirch Agreement Letter.pdf [PDF]
- No.10 - Frank McDonald.pdf [PDF]
- No.11 - Peter Twamley.pdf [PDF]
- No.12 - Michael Boyle.pdf [PDF]
- No.13 - Sabrina Joyce Kemper & Wild Ireland Defence CLG.pdf [PDF]
- No.14 - TII - Photomontages.pdf [PDF]
- No.15 - TII - EIAR Addendum Photomontages.pdf [PDF]
- No.16 - TII - List of OH Speakers as of 27.03.24.pdf [PDF]
- No.17 - TII - List of Agreements Reached with Third Parties.pdf [PDF]
- No.18(i) - TII - Schedule of Errata.pdf [PDF]
- No.18(ii) - TII - Schedule of Updates.pdf [PDF]
- No.19 - TII - Final Schedule of Additional Environmental Commitments.pdf [PDF]
- No.20 - TII - Carroll's Building Stairs and Lift.pdf [PDF]
- No.21 - TII - Outline Guidance Note for Developers – March 2024.pdf [PDF]
- No.22 - TII - EIAR Ch.11 – Populations and Land Use (Updated).pdf [PDF]
- No.22 - TII - EIAR Ch.11 – Populations and Land Use.pdf [PDF]
- No.23 - TII - List of Agreements Reached with Third Parties (Updated).pdf [PDF]
- No.24 - Ruadhán MacEoin - Witness Statement.pdf [PDF]
- Day 22 - 28th March 2024
- Attendance Sheet - Day 22 - 28th March 2024.pdf [PDF]
- Documents Received - Day 22 - 28th March 2024.pdf [PDF]
- No.01 - TII - 3D Design Bureau Verified Views - Update LLCA22.pdf [PDF]
- No.02 - TII - Landscape and Visual Impact of the Proposed Design Changes at Pinnockhill.pdf [PDF]
- No.03 - TII - Landscape and Visual Impact of the Proposed Design Changes at Tara Street.pdf [PDF]
- No.04 - TII - List of OH Speakers as of 28.03.24.pdf [PDF]
- No.05 - TII - Transport (Railway Infrastructure) Act 2001 (unofficial consolidation - March 2024).pdf [PDF]
- No.06 - Hampstead Residents CLG.pdf [PDF]
- Day 01 - 19th February 2024
- Third Party Documents
- Further Information Submissions
- FI Submissions
- FI Sub - ACRA Association of Combined Residence Association.pdf [PDF]
- FI Sub - Amanda Hughes.pdf [PDF]
- FI Sub - An Taisce.pdf [PDF]
- FI Sub - Andrew Conlon and Maeve Fitzpatrick.pdf [PDF]
- FI Sub - Andrew Whelan.pdf [PDF]
- FI Sub - Berkeley Road Area Residents' Association.pdf [PDF]
- FI Sub - Brendan Heneghan.pdf [PDF]
- FI Sub - Charlemont & Dartmouth Community Group (General Area Submission).pdf [PDF]
- FI Sub - Charlemont and Dartmouth Community Group (CDCG) (1, 3, 5 & 7-16 Dartmouth Square).pdf [PDF]
- FI Sub - Charlemont and Dartmouth Community Group (CDCG) (26-28 and 32-35 Dartmouth Road).pdf [PDF]
- FI Sub - Charlemont and Dartmouth Community Group (CDCG) (3-11 Cambridge Terrace).pdf [PDF]
- FI Sub - Conor and Lorraine Power.pdf [PDF]
- FI Sub - Cormac McKay and Aeravai.pdf [PDF]
- FI Sub - D. Holohan.pdf [PDF]
- FI Sub - DECC Geological Survey Ireland.pdf [PDF]
- FI Sub - Development Applications Unit.pdf [PDF]
- FI Sub - District 7 Community Alliance.pdf [PDF]
- FI Sub - Donal O'Brolcain.pdf [PDF]
- FI Sub - Dublin City Council.pdf [PDF]
- FI Sub - Dublin Commuter Coalition.pdf [PDF]
- FI Sub - Dublin Cycling Campaign.pdf [PDF]
- FI Sub - Estuary Court Residents Association.pdf [PDF]
- FI Sub - Fingal County Council.pdf [PDF]
- FI Sub - GADRA.pdf [PDF]
- FI Sub - Grace Maguire.pdf [PDF]
- FI Sub - Hampstead Residents CLG.pdf [PDF]
- FI Sub - John Conway and Orlaith McCarthy.pdf [PDF]
- FI Sub - Leo and Anne Crehan.pdf [PDF]
- FI Sub - LIDL Ireland GmbH.pdf [PDF]
- FI Sub - McGreevy and Taylor Families.pdf [PDF]
- FI Sub - Metro South West Group.pdf [PDF]
- FI Sub - NAMAI DAC.pdf [PDF]
- FI Sub - Niall Parsons.pdf [PDF]
- FI Sub - OPW (Leinster House Complex).pdf [PDF]
- FI Sub - Richard Guiney.pdf [PDF]
- FI Sub - Royal Canal Clean-Up Group.pdf [PDF]
- FI Sub - Shandon Residents Association.pdf [PDF]
- FI Sub - Suzi Taylor.pdf [PDF]
- FI Sub - Terry Reid.pdf [PDF]
- FI Sub - Troys Butchers.pdf [PDF]
- FI Sub - Union Investment Real Estate GmbH.pdf [PDF]
- Invalid FI Subs
- FI Submissions
- Submissions
- Fingal County Council Report.pdf [PDF]
- Sub - ACRA and Ballymun Road North Residents.pdf [PDF]
- Sub - ACRA Association of Combined Residence Association.pdf [PDF]
- Sub - Aidan Cyril Forde.pdf [PDF]
- Sub - Aine Wellard.pdf [PDF]
- Sub - Alstead Securities Limited.pdf [PDF]
- Sub - Amanda Hughes.pdf [PDF]
- Sub - An Post.pdf [PDF]
- Sub - An Taisce.pdf [PDF]
- Sub - Andrew Conlon and Maeve Fitzpatrick.pdf [PDF]
- Sub - Andrew Whelan.pdf [PDF]
- Sub - Anne Behan and John Kearns.pdf [PDF]
- Sub - Anne Confrey.pdf [PDF]
- Sub - Anne G Meehan.pdf [PDF]
- Sub - Ashley Estate Residents.pdf [PDF]
- Sub - Barry and Aileen Dempsey.pdf [PDF]
- Sub - Barry Murphy.pdf [PDF]
- Sub - Bart and Patricia Broderick.pdf [PDF]
- Sub - Ben and Tatiana Hurley.pdf [PDF]
- Sub - Berkeley Road Services and Traders Association.pdf [PDF]
- Sub - Bernard Seymour.pdf [PDF]
- Sub - Bindford Limited.pdf [PDF]
- Sub - BORG Developments and JOM Investments.pdf [PDF]
- Sub - Bovale Developments ULC.pdf [PDF]
- Sub - Bovale ULC and Balheary Properties ULC.pdf [PDF]
- Sub - Breda Scully.pdf [PDF]
- Sub - Brendan Flanagan.pdf [PDF]
- Sub - Brendan Heneghan.pdf [PDF]
- Sub - Brendan Howley.pdf [PDF]
- Sub - Brian McGrath.pdf [PDF]
- Sub - Brigid Purcell (People Before Profit rep).pdf [PDF]
- Sub - Butterfield District Residents Association.pdf [PDF]
- Sub - Cairn Homes Properties Limited.pdf [PDF]
- Sub - Caitriona and Ciaran Byrne.pdf [PDF]
- Sub - Caitriona Shaffrey.pdf [PDF]
- Sub - Carmen Neary.pdf [PDF]
- Sub - Caroline Eyre O'Connor.pdf [PDF]
- Sub - Caroline Regan and family.pdf [PDF]
- Sub - Cathal Duffy.pdf [PDF]
- Sub - Catherine Foley and Keith Madden.pdf [PDF]
- Sub - Charlemont and Dartmouth Community (Dartmouth Road).pdf [PDF]
- Sub - Charlemont and Dartmouth Community (Dartmouth Square West).pdf [PDF]
- Sub - Charlemont and Dartmouth Community (General Area).pdf [PDF]
- Sub - Ciaran Cuffe.pdf [PDF]
- Sub - Claire Dunne.pdf [PDF]
- Sub - CLG Na Fianna CO Cormac O Donnchu.pdf [PDF]
- Sub - Colin Torpay.pdf [PDF]
- Sub - College and Wainsfort Residents Association.pdf [PDF]
- Sub - Colm and Caitriona Warfield.pdf [PDF]
- Sub - Commission for Railway Regulation.pdf [PDF]
- Sub - Conor and Lorraine Power.pdf [PDF]
- Sub - Coras Iompair Eireann.pdf [PDF]
- Sub - Core Capital.pdf [PDF]
- Sub - Cormac McKay and Aeravai.pdf [PDF]
- Sub - Dan Coulcher and Paula Fyans.pdf [PDF]
- Sub - DECC Geological Survey Ireland.pdf [PDF]
- Sub - Declan Ryan.pdf [PDF]
- Sub - Deirdre Byrne and Family.pdf [PDF]
- Sub - Deirdre Vaughan.pdf [PDF]
- Sub - Denis McLoughlin and Teresa Reid.pdf [PDF]
- Sub - Dermot and Doris Healy.pdf [PDF]
- Sub - Development Applications Unit.pdf [PDF]
- Sub - Devonmill Limited.pdf [PDF]
- Sub - Diarmuid Burke.pdf [PDF]
- Sub - District 7 Community Alliance.pdf [PDF]
- Sub - Donal O'Brolcain.pdf [PDF]
- Sub - Dublin Airport.pdf [PDF]
- Sub - Dublin Central GP Limited.pdf [PDF]
- Sub - Dublin Chamber.pdf [PDF]
- Sub - Dublin City Council.pdf [PDF]
- Sub - Dublin Commuter Coalition.pdf [PDF]
- Sub - Dublin Cycling Campaign.pdf [PDF]
- Sub - Duncan Smith.pdf [PDF]
- Sub - Dympna Rooney.pdf [PDF]
- Sub - Eamonn Smyth.pdf [PDF]
- Sub - Eanna Coffey.pdf [PDF]
- Sub - Earl Court Management Company DAC.pdf [PDF]
- Sub - Earldev Properties Unlimited Company.pdf [PDF]
- Sub - Earlsfort Basin Limited.pdf [PDF]
- Sub - Edward Kelly and Joyce MacRedmond.pdf [PDF]
- Sub - Eirgrid.pdf [PDF]
- Sub - Elisabeth Vandenberghe.pdf [PDF]
- Sub - Emir McDonagh.pdf [PDF]
- Sub - Emma Kelly.pdf [PDF]
- Sub - Erica and Bryan Dalton.pdf [PDF]
- Sub - ESB Telecoms Limited.pdf [PDF]
- Sub - Espirit Investments Limited.pdf [PDF]
- Sub - Estuary Court Residents Association 2.pdf [PDF]
- Sub - Estuary Court Residents Association.pdf [PDF]
- Sub - Eveleen Coyle.pdf [PDF]
- Sub - Failte Ireland.pdf [PDF]
- Sub - Farrier Technology Limited.pdf [PDF]
- Sub - Father Paul Churchill and others.pdf [PDF]
- Sub - Fingallians GAA Club.pdf [PDF]
- Sub - Fiona O'Kelly.pdf [PDF]
- Sub - Frances Maguire.pdf [PDF]
- Sub - Frank McDonald.pdf [PDF]
- Sub - GADRA.pdf [PDF]
- Sub - Geraldine Ann Cusack and Geraldine O'Connell Cusack.pdf [PDF]
- Sub - Gerard F Brouder (Part II - Map).pdf [PDF]
- Sub - Gerard F Brouder.pdf [PDF]
- Sub - Gerard Gannon Properties.pdf [PDF]
- Sub - Gerhard and Rosemary Mayrhuber.pdf [PDF]
- Sub - Glasnevin Village Residents Association.pdf [PDF]
- Sub - Godfrey Gillett.pdf [PDF]
- Sub - Grace Bible Fellowship.pdf [PDF]
- Sub - Grace Maguire.pdf [PDF]
- Sub - Grand Parade Property Trading Company DAC.pdf [PDF]
- Sub - Greybirch Limited.pdf [PDF]
- Sub - Hammerson ICAV.pdf [PDF]
- Sub - Hampstead Residents CLG.pdf [PDF]
- Sub - Helen and Luke Sherlock.pdf [PDF]
- Sub - Helena Kelly.pdf [PDF]
- Sub - Hertz Europe Service Centre Limited.pdf [PDF]
- Sub - Hibernia Real Estate Group Limited.pdf [PDF]
- Sub - Hines Real Estate Ireland Limited.pdf [PDF]
- Sub - HSE National Drug Treatment Centre.pdf [PDF]
- Sub - Hugo Byrne CO John Byrne.pdf [PDF]
- Sub - Ian and Eva Sutherland.pdf [PDF]
- Sub - Iarnrod Eireann.pdf [PDF]
- Sub - Institutional Investment Partners GmbH.pdf [PDF]
- Sub - Iona and District Residents Association 2.pdf [PDF]
- Sub - Iona and District Residents Association.pdf [PDF]
- Sub - IPUT plc and Irish Life Assurance plc.pdf [PDF]
- Sub - Irene Sorohan.pdf [PDF]
- Sub - Irish Airline Pilots Association.pdf [PDF]
- Sub - Irish Georgian Society.pdf [PDF]
- Sub - Irish Life Assurance plc. (19-20 Earlsfort Terrace and 65A Adelaide Road).pdf [PDF]
- Sub - Irish Life Assurance plc. (4 Earlsfort Terrace).pdf [PDF]
- Sub - Irish Life Assurance plc. (70 St Stephens Green).pdf [PDF]
- Sub - Irish Life Assurance plc. (Earlsfort Terrace Block C).pdf [PDF]
- Sub - Irish Water.pdf [PDF]
- Sub - Ivana Bacik.pdf [PDF]
- Sub - J Murphy (Devlopments) Limited.pdf [PDF]
- Sub - James Geoghegan.pdf [PDF]
- Sub - James Wickham.pdf [PDF]
- Sub - Jamie Maher and Others.pdf [PDF]
- Sub - Jennie McGee and Ian Kelly.pdf [PDF]
- Sub - Jerdip Properties Unlimited Company.pdf [PDF]
- Sub - Jian Cheng and Family.pdf [PDF]
- Sub - Jim O'Callaghan.pdf [PDF]
- Sub - Johann Harty.pdf [PDF]
- Sub - John A Ryan.pdf [PDF]
- Sub - John and Josianne Bullows 2.pdf [PDF]
- Sub - John and Josianne Bullows.pdf [PDF]
- Sub - John and Majella Darcy.pdf [PDF]
- Sub - John Bernard Reid.pdf [PDF]
- Sub - John Conway and Orlaith McCarthy.pdf [PDF]
- Sub - John Lawlor.pdf [PDF]
- Sub - John Loughrey.pdf [PDF]
- Sub - John McGreevy.pdf [PDF]
- Sub - John Neary and Kathleen White.pdf [PDF]
- Sub - Jonathan Healy.pdf [PDF]
- Sub - Juliana and Joe Boland and Family.pdf [PDF]
- Sub - Justin Marden.pdf [PDF]
- Sub - Karen Colgan.pdf [PDF]
- Sub - Karl Egan.pdf [PDF]
- Sub - Kathleen McDonagh.pdf [PDF]
- Sub - Kathleen Shields.pdf [PDF]
- Sub - Kevin Muaghan.pdf [PDF]
- Sub - Kieran Smyth and Margaret McDonnell and Others.pdf [PDF]
- Sub - Knocklyon Network CLG.pdf [PDF]
- Sub - Kohlin Lourenco.pdf [PDF]
- Sub - KW Real Estate ICAV.pdf [PDF]
- Sub - Leo and Anne Crehan.pdf [PDF]
- Sub - Leonard Kinsella.pdf [PDF]
- Sub - Lesley Hewson.pdf [PDF]
- Sub - LIDL Ireland GmbH.pdf [PDF]
- Sub - LOKRA Lower Kimmage Road Residents Association.pdf [PDF]
- Sub - Lorraine Rooney.pdf [PDF]
- Sub - Louisa Gannon.pdf [PDF]
- Sub - Louise Boughton and Glenn Sharpe.pdf [PDF]
- Sub - M.E. Hanashoe Solicitors.pdf [PDF]
- Sub - Management Company Board on Behalf of the Court.pdf [PDF]
- Sub - Margaret Morrissey.pdf [PDF]
- Sub - Maria Elena Garcia Valasco.pdf [PDF]
- Sub - Maria O'Connor.pdf [PDF]
- Sub - Marie Balfe.pdf [PDF]
- Sub - Marie McMahon.pdf [PDF]
- Sub - Marie Sherlock.pdf [PDF]
- Sub - Mark Campbell and Aimee O'Farrell.pdf [PDF]
- Sub - Mark O'Connell.pdf [PDF]
- Sub - Martin Sheridan.pdf [PDF]
- Sub - Mary Fitzpatrick.pdf [PDF]
- Sub - Mater Misericordiae and the Childrens University.pdf [PDF]
- Sub - Mater Misericordiae University Hospital.pdf [PDF]
- Sub - Metro South West Group.pdf [PDF]
- Sub - Michael B. Barry.pdf [PDF]
- Sub - Michael McDowell.pdf [PDF]
- Sub - Michael Quinn.pdf [PDF]
- Sub - Monica Deering.pdf [PDF]
- Sub - Muiris O'Dwyer.pdf [PDF]
- Sub - National Disability Authority.pdf [PDF]
- Sub - National Transport Authority.pdf [PDF]
- Sub - Neasa Hourigan.pdf [PDF]
- Sub - Newcourt Retirement Fund Managers Ltd Trustees of Majella Darcy PRSA.pdf [PDF]
- Sub - Niall Lynch.pdf [PDF]
- Sub - Niall Parsons 2.pdf [PDF]
- Sub - Niall Parsons.pdf [PDF]
- Sub - Nicholas Mansergh.pdf [PDF]
- Sub - Nicola Brait and Greta Tumiatti.pdf [PDF]
- Sub - Nicola O'Doherty.pdf [PDF]
- Sub - Nigel Clerkin.pdf [PDF]
- Sub - Nigel Mallen.pdf [PDF]
- Sub - Nuala Kelly.pdf [PDF]
- Sub - Olan O'Brien.pdf [PDF]
- Sub - OPW (1 Georges Quay and others).pdf [PDF]
- Sub - OPW (13-14 Burgh Quay Offices).pdf [PDF]
- Sub - OPW (14-17 Moore Street - 8-9 Moore Lane).pdf [PDF]
- Sub - OPW (16 Parnell Square).pdf [PDF]
- Sub - OPW (22-25 Clare Street).pdf [PDF]
- Sub - OPW (44-45 O'Connell Street).pdf [PDF]
- Sub - OPW (52 St Stephens Green).pdf [PDF]
- Sub - OPW (9-15 O'Connell Street).pdf [PDF]
- Sub - OPW (Apartments 1-8 Clare Court).pdf [PDF]
- Sub - OPW (Ballymun Garda District Headquarters and INTERO Office).pdf [PDF]
- Sub - OPW (Department of Enterprise, Trade and others).pdf [PDF]
- Sub - OPW (Department of Finance).pdf [PDF]
- Sub - OPW (Department of Justice 50-51 St Stephens Green).pdf [PDF]
- Sub - OPW (Garden of Remembrance).pdf [PDF]
- Sub - OPW (Government Buildings Block).pdf [PDF]
- Sub - OPW (Headquarters of the Department of Agriculture, Food and the Marine).pdf [PDF]
- Sub - OPW (Iveagh House - Department of Foreign Affairs).pdf [PDF]
- Sub - OPW (Leinster House Complex).pdf [PDF]
- Sub - OPW (Mobhi Road Complex).pdf [PDF]
- Sub - OPW (National Concert Hall Complex).pdf [PDF]
- Sub - OPW (National Gallery of Ireland).pdf [PDF]
- Sub - OPW (National Library of Ireland).pdf [PDF]
- Sub - OPW (National Museum of Ireland).pdf [PDF]
- Sub - OPW (Natural History Museum).pdf [PDF]
- Sub - OPW (St Stephens Green Buildings).pdf [PDF]
- Sub - OPW (St Stephens Green House).pdf [PDF]
- Sub - OPW (St Stephens Green Park).pdf [PDF]
- Sub - OPW (The General Post Office).pdf [PDF]
- Sub - Orwell Park (Templeogue) Residents Association.pdf [PDF]
- Sub - Our Ladies of Victories Church.pdf [PDF]
- Sub - Owners of 9, 10 and 11 Neeson Street.pdf [PDF]
- Sub - Pat and Barbara McCormack.pdf [PDF]
- Sub - Patricia Roe.pdf [PDF]
- Sub - Patricia Whyte.pdf [PDF]
- Sub - Paul and Brian Connell.pdf [PDF]
- Sub - Paul Cusack.pdf [PDF]
- Sub - Paul Hughes.pdf [PDF]
- Sub - Paul McAuliffe.pdf [PDF]
- Sub - Peter and Breda Gregory.pdf [PDF]
- Sub - Peter Schneider Energy Consultants.pdf [PDF]
- Sub - Peter Twamley.pdf [PDF]
- Sub - Phibsboro Village Tidy Towns (PVTT).pdf [PDF]
- Sub - Proinsias Mac Fhlannchadha.pdf [PDF]
- Sub - Prospect Architectural Conservation Area.pdf [PDF]
- Sub - Rail Users Ireland (Thomas J Stamp).pdf [PDF]
- Sub - Rathgar Residents Association.pdf [PDF]
- Sub - Recorders Residents Association.pdf [PDF]
- Sub - Rethink Metrolink.pdf [PDF]
- Sub - RGRE Burlington Limited and RGRE Harcourt Terrace Limited.pdf [PDF]
- Sub - Richard Guiney.pdf [PDF]
- Sub - Rita Marie Harvey.pdf [PDF]
- Sub - Rohan Holdings Limited (Part I).pdf [PDF]
- Sub - Rohan Holdings Limited (Part II - Map).pdf [PDF]
- Sub - Roisin Shortall.pdf [PDF]
- Sub - Royal Canal Clean-Up Group.pdf [PDF]
- Sub - Ruadhan MacEoin.pdf [PDF]
- Sub - Sadhbh O Neill.pdf [PDF]
- Sub - Sainfoin Property Company Limited.pdf [PDF]
- Sub - Santry Forum.pdf [PDF]
- Sub - Sarah Meredith.pdf [PDF]
- Sub - Save Markievicz Pool & Gym Campaign (John Dean).pdf [PDF]
- Sub - Seatown Villas Residents.pdf [PDF]
- Sub - Shandon Mill Owners Management Company CLG.pdf [PDF]
- Sub - Shandon Residents Association.pdf [PDF]
- Sub - Shira Mehlman.pdf [PDF]
- Sub - Sinead Quilty.pdf [PDF]
- Sub - Smokin Bones LTD.pdf [PDF]
- Sub - Smyths Toys Superstores.pdf [PDF]
- Sub - St.Annes Resident's Association.pdf [PDF]
- Sub - Susan Cosgrove.pdf [PDF]
- Sub - Suzi Taylor and G.I Taylor.pdf [PDF]
- Sub - Tanat Limited.pdf [PDF]
- Sub - Tanrat Limited TA Starbucks.pdf [PDF]
- Sub - Terenure West Residents Association.pdf [PDF]
- Sub - Tesco Ireland.pdf [PDF]
- Sub - The Abbey Theatre (Amharclann na Mainistreach).pdf [PDF]
- Sub - The CMCCG Action Group (Sabine Klinger).pdf [PDF]
- Sub - The Foley Family.pdf [PDF]
- Sub - The Owner of Apartment 27 College Gate.pdf [PDF]
- Sub - The Residents of Albert College Lawn.pdf [PDF]
- Sub - The Rotunda Hospital.pdf [PDF]
- Sub - Thomas Harty.pdf [PDF]
- Sub - Thomas Herlihy.pdf [PDF]
- Sub - TII (Edel McCormack).pdf [PDF]
- Sub - Tom Harrington.pdf [PDF]
- Sub - Tony Graham.pdf [PDF]
- Sub - Townsend Apartment Management Company Limited.pdf [PDF]
- Sub - Trinity College Dublin.pdf [PDF]
- Sub - Troys Butchers.pdf [PDF]
- Sub - Union Investment Real Estate GmbH.pdf [PDF]
- Sub - University College Dublin (UCD).pdf [PDF]
- Sub - Upper Leeson Street Area Residents Association.pdf [PDF]
- Sub - Veronica Jane O'Mara.pdf [PDF]
- Sub - Vincent Harrison and others 2.pdf [PDF]
- Sub - Vincent Harrison and others.pdf [PDF]
- Sub - Voice of Vision Impairment.pdf [PDF]
- Sub - Waterways Ireland.pdf [PDF]
- Sub - Westward Group Ltd.pdf [PDF]
- Sub - Will Phelan.pdf [PDF]
- Sub - Woodies DIY co Grafton Group PLC.pdf [PDF]
- Sub - WORK Residents Association (Michael Griffin).pdf [PDF]
- Sub - Wynn's Hotel.pdf [PDF]
- Sub - Yu Miao Yang YMY Ltd.pdf [PDF]
- Sub - Yvonne Allen.pdf [PDF]
- Sub - Yvonne Collins.pdf [PDF]
- Subs Rec'd in Response to Wild Irish Defense Submission
- FI Sub - ACRA Caitriona McClean & Tom Newton.pdf [PDF]
- FI Sub - Breda Scully.pdf [PDF]
- FI Sub - Cormac Rabbit.pdf [PDF]
- FI Sub - Donal O'Brolcáin.pdf [PDF]
- FI Sub - GADRA.pdf [PDF]
- FI Sub - Hampstead Residents CLG.pdf [PDF]
- FI Sub - John Bernard Reid.pdf [PDF]
- FI Sub - Juliana& Joe Boland.pdf [PDF]
- FI Sub - NTA.pdf [PDF]
- FI Sub - OPW.pdf [PDF]
- FI Sub - Richard Guiney.pdf [PDF]
- FI Sub - Troys Butchers.pdf [PDF]
- Withdrawn Submissions
- Withdrawn Sub - Ciaran Black and Leon McCarthy.pdf [PDF]
- Withdrawn Sub - Hedigans Limited.pdf [PDF]
- Withdrawn Sub - Maureen O'Scanaill.pdf [PDF]
- Withdrawn Sub - Michael A Doyle and Carmel Smith Doyle.pdf [PDF]
- Withdrawn Sub - Millenium Theatre Company.pdf [PDF]
- Withdrawn Sub - Mouna Unlimited Company.pdf [PDF]
- Withdrawn Sub - O'Scanaill Veterinary Hospital.pdf [PDF]
- Withdrawn Sub - October Investments Limited.pdf [PDF]
- Withdrawn Sub - Our Lady of Victories Boys School.pdf [PDF]
- Withdrawn Sub - Our Lady of Victories Girls School.pdf [PDF]
- Withdrawn Sub - Our Lady of Victories Infant School.pdf [PDF]
- Withdrawn Sub - Our Lady of Victories Schools.pdf [PDF]
- Further Information Submissions
- Applicant Documents
- Féach ar dhoiciméid ghaolmhara
-
RailwayOrder
- Féach ar dhoiciméid ghaolmhara
- Preamble.pdf [PDF]
- Schedule 01 - Railway Works and Works authorised by this Order.pdf [PDF]
- Schedule 02 Part 01 of 02 Land which may be acquired.pdf [PDF]
- Schedule 02 Part 02 of 02 Land which may be acquired.pdf [PDF]
- Schedule 03 Part 01 of 04 Substratum land which may be acquired.pdf [PDF]
- Schedule 03 Part 02 of 04 Substratum land which may be acquired.pdf [PDF]
- Schedule 03 Part 03 of 04 Substratum land which may be acquired.pdf [PDF]
- Schedule 03 Part 04 of 04 Substratum land which may be acquired.pdf [PDF]
- Schedule 04 Part 01 of 02 Land of which temporary possession may be taken.pdf [PDF]
- Schedule 04 Part 02 of 02 Land of which temporary possession may be taken.pdf [PDF]
- Schedule 05 Part 01 of 01.pdf [PDF]
- Schedule 06 Part 01 of 01.pdf [PDF]
- Schedule 07 Part 01 of 01.pdf [PDF]
- Schedule 08 Part 01 of 01.pdf [PDF]
- Schedule 09 Part 01 of 01 Public rights of way which may be extinguished.pdf [PDF]
- Schedule 10 Part 01 of 01 Private rights which may be extinguished.pdf [PDF]
- Schedule 11 - New roads which may be constructed.pdf [PDF]
- Schedule 12 - Public roads which may be altered.pdf [PDF]
- Schedule 13 - Agreements Made at Oral Hearing.pdf [PDF]
- Schedule 13 - Dubin Airport Authority Agreement.pdf [PDF]
- Schedule 13 - Dublin City Council Agreement.pdf [PDF]
- Schedule 13 - Fingal County Council Agreement.pdf [PDF]
- Schedule 13 - Office of Public Works Agreement.pdf [PDF]
- Schedule 14 - Conditions Imposed by An Coimisiún Pleanála.pdf [PDF]
- Schedule 15 - Reasoned Conclusion.pdf [PDF]
- Schedule 16 - Costs.pdf [PDF]
- Schedule 16 - Schedule of Costs.pdf [PDF]
- Féach ar dhoiciméid ghaolmhara
-
Tá an t-iarratas seo faoi réir nós imeachta MTT.
- Féach ar dhoiciméid ghaolmhara
- 1_Application
- 2_DRAFT Railway Order
- 3_Railway Order Book of Reference
- 4_Railway Order Drawings
- 5_EIAR
- Volume 1 Book 1 Non Technical Summary
- Volume 2 Introduction and Project Description
- Chapter 01 Introduction.pdf [PDF]
- Chapter 02 Methodology used in Preparation of the EIAR.pdf [PDF]
- Chapter 03 Background to the MetroLink Project.pdf [PDF]
- Chapter 04 Description of the MetroLink Project.pdf [PDF]
- Chapter 05 MetroLink Construction Phase.pdf [PDF]
- Chapter 06 MetroLink Operations and Maintenance.pdf [PDF]
- Chapter 07 Consideration of Alternatives.pdf [PDF]
- Chapter 08 Consultation.pdf [PDF]
- Volume 3 Environmental Baseline and Assessment
- Chapter 09 Traffic and Transport.pdf [PDF]
- Chapter 10 Human Health.pdf [PDF]
- Chapter 11 Population and Land Use.pdf [PDF]
- Chapter 12 Electromagnetic Compatibility and Stray Current.pdf [PDF]
- Chapter 13 Airborne Noise and Vibration.pdf [PDF]
- Chapter 14 Ground-borne Noise and Vibration.pdf [PDF]
- Chapter 15 Biodiversity.pdf [PDF]
- Chapter 16 Air Quality.pdf [PDF]
- Chapter 17 Climate.pdf [PDF]
- Chapter 18 Hydrology.pdf [PDF]
- Chapter 19 Hydrogeology.pdf [PDF]
- Chapter 20 Soils and Geology.pdf [PDF]
- Chapter 21 Land Take.pdf [PDF]
- Chapter 22 Infrastructure and Utilities.pdf [PDF]
- Chapter 23 Agronomy.pdf [PDF]
- Chapter 24 Material & Waste Management.pdf [PDF]
- Chapter 25 Archaeology and Cultural Heritage.pdf [PDF]
- Chapter 26 Architectural Heritage.pdf [PDF]
- Chapter 27 The Landscape.pdf [PDF]
- Chapter 28 Risk of Major Accidents and Disasters.pdf [PDF]
- Chapter 29 Interactions between the various environmental aspects.pdf [PDF]
- Chapter 30 Cumulative impacts of interaction between other projects and MetroLink.pdf [PDF]
- Chapter 31 Summaries of the route wide mitigation and monitoring proposed.pdf [PDF]
- Volume 4 Figures
- Chapter 01 Introduction
- Chapter 02 Methodology used in Preparation of the EIAR
- Chapter 03 Background to the MetroLink Project
- Chapter 04 Description of the MetroLink Project
- Chapter 05 MetroLink Construction Phase
- Chapter 06 MetroLink Operations and Maintenance
- Chapter 07 Consideration of Alternatives
- Chapter 08 Consultation
- Chapter 09 Traffic and Transport
- Figure 9.10 Cycle Trips - Percentage Difference 12hr Scenario A 2035.pdf [PDF]
- Figure 9.11 Cycle Trips - Total Difference 12hr Scenario A 2035.pdf [PDF]
- Figure 9.12 Active Modes - Total Trips Attracted Scenario A 2035 12hr.pdf [PDF]
- Figure 9.13 Active Modes - Total Trips Produced Scenario A 2035 12hr.pdf [PDF]
- Figure 9.14 Mode Share - Sheet 1 of 2 - Scenario A 2035 AM Road.pdf [PDF]
- Figure 9.14 Mode Share - Sheet 2 of 2 - Scenario A 2035 AM PT+Metro.pdf [PDF]
- Figure 9.15 Mode Share - Sheet 1 of 2 - Scenario A 2050 AM Road.pdf [PDF]
- Figure 9.15 Mode Share - Sheet 2 of 2 - Scenario A 2050 AM PT+Metro.pdf [PDF]
- Figure 9.16 Mode Share - Sheet 1 of 2 - Scenario A 2065 AM Road.pdf [PDF]
- Figure 9.16 Mode Share - Sheet 2 of 2 - Scenario A 2065 AM PT+Metro.pdf [PDF]
- Figure 9.17 Mode Share - Sheet 1 of 2 - Scenario A 2035 PM Road Sheet.pdf [PDF]
- Figure 9.17 Mode Share - Sheet 2 of 2 - Scenario A 2035 PM PT+Metro.pdf [PDF]
- Figure 9.18 Mode Share - Sheet 1 of 2 - Scenario A 2050 PM Road Sheet.pdf [PDF]
- Figure 9.18 Mode Share - Sheet 2 of 2 - Scenario A 2050 PM PT+Metro.pdf [PDF]
- Figure 9.19 Mode Share - Sheet 1 of 2 - Scenario A 2065 PM Road.pdf [PDF]
- Figure 9.19 Mode Share - Sheet 2 of 2 - Scenario A 2065 PM PT+Metro.pdf [PDF]
- Figure 9.1 Project's Area of Influence.pdf [PDF]
- Figure 9.2 Existing Road Network near stations - Overall.pdf [PDF]
- Figure 9.20 Mode Share - Sheet 1 of 2 - Scenario B 2035 AM Road.pdf [PDF]
- Figure 9.20 Mode Share - Sheet 2 of 2 - Scenario B 2035 AM PT+Metro.pdf [PDF]
- Figure 9.21 Mode Share - Sheet 1 of 2 - Scenario B 2050 AM Road.pdf [PDF]
- Figure 9.21 Mode Share - Sheet 2 of 2 - Scenario B 2050 AM PT+Metro.pdf [PDF]
- Figure 9.22 Mode Share - Sheet 1 of 2 - Scenario B 2065 AM Road.pdf [PDF]
- Figure 9.22 Mode Share - Sheet 2 of 2 - Scenario B 2065 AM PT+Metro.pdf [PDF]
- Figure 9.23 Mode Share - Sheet 1 of 2 - Scenario B 2035 PM Road.pdf [PDF]
- Figure 9.23 Mode Share - Sheet 2 of 2 - Scenario B 2035 PM PT+Metro.pdf [PDF]
- Figure 9.24 Mode Share - Sheet 1 of 2 - Scenario B 2050 PM Road.pdf [PDF]
- Figure 9.24 Mode Share - Sheet 2 of 2 - Scenario B 2050 PM PT+Metro.pdf [PDF]
- Figure 9.25 Mode Share - Sheet 1 of 2 - Scenario B 2065 PM Road.pdf [PDF]
- Figure 9.25 Mode Share - Sheet 2 of 2 - Scenario B 2065 PM PT+Metro.pdf [PDF]
- Figure 9.26 Changes in Public Transport Link Flows - Scenario A 2035 AM Peak Period.pdf [PDF]
- Figure 9.27 Changes in Public Transport Link Flows - Scenario A 2035 PM Peak Period.pdf [PDF]
- Figure 9.28 Changes in Public Transport Link Flows - Scenario B 2035 AM Peak Period.pdf [PDF]
- Figure 9.29 Changes in Public Transport Link Flows - Scenario B 2035 PM Peak Period.pdf [PDF]
- Figure 9.3 Stations within GDA Cycle Network - Overall.pdf [PDF]
- Figure 9.30 Road Impacts Scenario A AADT Difference 2035.pdf [PDF]
- Figure 9.31 Road Impacts Scenario A AADT Difference 2050.pdf [PDF]
- Figure 9.32 Road Impacts Scenario A AADT Difference 2065.pdf [PDF]
- Figure 9.33 Road Impacts Scenario B AADT Difference 2035.pdf [PDF]
- Figure 9.34 Road Impacts Scenario B AADT Difference 2050.pdf [PDF]
- Figure 9.35 Road Impacts Scenario B AADT Difference 2065.pdf [PDF]
- Figure 9.36 Road Impacts - Delay Scenario A 2035 Difference.pdf [PDF]
- Figure 9.37 Road Impacts - Delay Scenario A 2050 Difference.pdf [PDF]
- Figure 9.38 Road Impacts - Delay Scenario A 2065 Difference.pdf [PDF]
- Figure 9.39 Road Impacts - Delay Scenario B 2035 Difference.pdf [PDF]
- Figure 9.4 Proposed Station Locations.pdf [PDF]
- Figure 9.40 Road Impacts - Delay Scenario B 2050 Difference.pdf [PDF]
- Figure 9.41 Road Impacts - Delay Scenario B 2065 Difference.pdf [PDF]
- Figure 9.42 Passenger Origins within Walking Isochrones.pdf [PDF]
- Figure 9.43 Passenger Destinations within Walking Isochrones.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from Airport Sheet 1 of 5.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from DCU Sheet 2 of 5.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from Swords East Sheet 3 of 5.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from Swords NW Sheet 4 of 5.pdf [PDF]
- Figure 9.44 Accessibility - JT Under 45mins PT from Swords SW Sheet 5 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to Airport Sheet 1 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to DCU Sheet 2 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to Swords East Sheet 3 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to Swords NW Sheet 4 of 5.pdf [PDF]
- Figure 9.45 Accessibility - JT Under 45mins PT to Swords SW Sheet 5 of 5.pdf [PDF]
- Figure 9.46 Pedestrian Analysis - 2050 with Metro Comfort Level - Overview.pdf [PDF]
- Figure 9.47 Pedestrian Analysis - 2050 with Metro Comfort Level.pdf [PDF]
- Figure 9.48 Pedestrian Analysis - 2065 with Metro Comfort Level - Overview.pdf [PDF]
- Figure 9.49 Pedestrian Analysis - 2065 with Metro Comfort Level.pdf [PDF]
- Figure 9.5 Stations in Relation to Other Public Transport Facilities.pdf [PDF]
- Figure 9.6 Existing Road Network near stations.pdf [PDF]
- Figure 9.7 Station within GDA Cycle Network.pdf [PDF]
- Figure 9.8 Pedestrian Modelling - Base Comfort Level.pdf [PDF]
- Figure 9.9 HGV Routing Options.pdf [PDF]
- Chapter 10 Human Health
- Chapter 11 Population and Land Use
- Figure 11.1 Study Area for the Population Assessment.pdf [PDF]
- Figure 11.10 Educational Facilities in the Study Area.pdf [PDF]
- Figure 11.11 Open Space in the Study Area.pdf [PDF]
- Figure 11.12 Sports and Recreation Facilities in the Study Area.pdf [PDF]
- Figure 11.13 Public Transport in the Study Area.pdf [PDF]
- Figure 11.14 Road Network in the Study Area.pdf [PDF]
- Figure 11.15 Walking Times from Stations.pdf [PDF]
- Figure 11.16 Driving Times from Stations.pdf [PDF]
- Figure 11.17 Land Use Zoning in the Study Area.pdf [PDF]
- Figure 11.18 Residential Land in the Study Area.pdf [PDF]
- Figure 11.19 Shopping Centres and Retail Clusters in the Study Area.pdf [PDF]
- Figure 11.2 Population Density in the Study Area.pdf [PDF]
- Figure 11.20 Essential Services in the Study Area.pdf [PDF]
- Figure 11.21 Healthcare Facilities in the Study Area.pdf [PDF]
- Figure 11.3 Workplace Zones in the Study Area.pdf [PDF]
- Figure 11.4 Commercial Properties in the Study Area.pdf [PDF]
- Figure 11.5 Tourist Accommodation in the Study Area.pdf [PDF]
- Figure 11.6 Churches, Libraries and Childcare Facilities in the Study Area.pdf [PDF]
- Figure 11.7 Convenience Stores and Supermarkets in the Study Area.pdf [PDF]
- Figure 11.8 Deprivation in the Study Area.pdf [PDF]
- Figure 11.9 Health Status in the Study Area.pdf [PDF]
- Chapter 12 Electromagnetic Compatibility and Stray Current
- Chapter 13 Airborne Noise and Vibration
- Chapter 14 Ground-borne Noise and Vibration
- Figure 14.1 AWN Vibration Monitoring Locations.pdf [PDF]
- Figure 14.2 Groundborne Noise from Tunnel Boring Machine.pdf [PDF]
- Figure 14.3 Vibration from Mechanical Excavation.pdf [PDF]
- Figure 14.4 Blasting Contours of PPV.pdf [PDF]
- Figure 14.5 Blasting Air Overpressure Contours.pdf [PDF]
- Figure 14.6 Groundborne Noise from Operation.pdf [PDF]
- Chapter 15 Biodiversity
- Figure 15.1 Study areas for each ecological receptor.pdf [PDF]
- Figure 15.10 Wintering bird survey results.pdf [PDF]
- Figure 15.11 Suitable amphibian habitat.pdf [PDF]
- Figure 15.12 Suitable Common Lizard Habitat.pdf [PDF]
- Figure 15.13 Ecological Mitigation Measures Habitats within the red line boundary to be retained.pdf [PDF]
- Figure 15.2 Transect routes surveyed for bats and location of bat buildings and static bat detectors.pdf [PDF]
- Figure 15.3 Watercourses in the ZoI of the proposed Project.pdf [PDF]
- Figure 15.4 European sites located within 15km of the proposed Project.pdf [PDF]
- Figure 15.5 Natural Heritage Areas and Proposed Natural Heritage Areas located within 15km of the proposed Project.pdf [PDF]
- Figure 15.6 Habitat survey results (including locations of invasive plant species and relevé locations).pdf [PDF]
- Figure 15.7 Bat survey results (Walked Transect Surveys and Building Surveys).pdf [PDF]
- Figure 15.8 Mammal survey results.pdf [PDF]
- Figure 15.9 Breeding bird survey results.pdf [PDF]
- Chapter 16 Air Quality
- Figure 16.1 Dust Distance Buffers.pdf [PDF]
- Figure 16.10 NO2 Impact (2035) - Operational (A).pdf [PDF]
- Figure 16.11 NO2 Impact (2035) - Operational (B).pdf [PDF]
- Figure 16.12 PM10 Impact (2035) - Operational (A).pdf [PDF]
- Figure 16.13 PM10 Impact (2035) - Operational (B).pdf [PDF]
- Figure 16.14 PM 2.5 Impact (2035) - Operational (A).pdf [PDF]
- Figure 16.15 PM 2.5 Impact (2035) - Operational (B).pdf [PDF]
- Figure 16.2 Air Monitoring Locations.pdf [PDF]
- Figure 16.3 Air Quality Zones.pdf [PDF]
- Figure 16.4 NO2 Impact - Construction Phase - Northern Peak.pdf [PDF]
- Figure 16.5 NO2 Impact - Construction Phase - Southern Peak.pdf [PDF]
- Figure 16.6 PM10 Impact - Construction Phase - Northern Peak.pdf [PDF]
- Figure 16.7 PM10 Impact - Construction Phase - Southern Peak.pdf [PDF]
- Figure 16.8 PM 2.5 Impacts - Construction Phase - Northern Peak.pdf [PDF]
- Figure 16.9 PM 2.5 Impacts (2030) - Construction Phase - Southern Peak.pdf [PDF]
- Chapter 17 Climate
- Chapter 18 Hydrology
- Figure 18.1 Surface Drainage features & WFD Sub-Catchment Delineation.pdf [PDF]
- Figure 18.10 Proposed Drainage Catchment B & Existing Road.pdf [PDF]
- Figure 18.11 Proposed Drainage Catchment C1.pdf [PDF]
- Figure 18.12 Proposed Drainage Catchment C2-D1 Catchment D2.pdf [PDF]
- Figure 18.13 Proposed Drainage Catchment E1 & Depot.pdf [PDF]
- Figure 18.14 Proposed Drainage Catchment F.pdf [PDF]
- Figure 18.2 Surface Drainage and Water Quality Sampling Points.pdf [PDF]
- Figure 18.3 River Flood Extents and Historical River Flood Events.pdf [PDF]
- Figure 18.4 Coastal Flood Extents and Historical River Flood Events.pdf [PDF]
- Figure 18.5 Surface Drainage features and proposed discharge points.pdf [PDF]
- Figure 18.6 Historical Rivers – Dublin City & Environs.pdf [PDF]
- Figure 18.7 Historical Rivers – Dublin (Santry to Royal Canal).pdf [PDF]
- Figure 18.8 Proposed Watercourse Division.pdf [PDF]
- Figure 18.9 Proposed Drainage Catchment A1-Swords Western Distributor Road A2 & Estuary Station Parking.pdf [PDF]
- Chapter 19 Hydrogeology
- Figure 19.1 Regional Bedrock Geology.pdf [PDF]
- Figure 19.2 Aquifer Classification.pdf [PDF]
- Figure 19.3 Aquifer Vulnerability.pdf [PDF]
- Figure 19.4 WFD Groundwater Bodies Status.pdf [PDF]
- Figure 19.5 Groundwater Well Search & Karst Features.pdf [PDF]
- Figure 19.6 Baseline Groundwater Quality Monitoring.pdf [PDF]
- Figure 19.7 Groundwater Recharge.pdf [PDF]
- Figure 19.8 Hydraulic Testing Areas along the Proposed Route.pdf [PDF]
- Chapter 20 Soils and Geology
- Figure 20.1 Teagasc Soil Associations.pdf [PDF]
- Figure 20.10 Crushed Rock Aggregate Potential.pdf [PDF]
- Figure 20.11 SURGE Geochem dataset locations.pdf [PDF]
- Figure 20.12 Radon Potential.pdf [PDF]
- Figure 20.13 Soil Geochemical Data Assessment Criteria exceedances.pdf [PDF]
- Figure 20.14 Groundwater Geochemical Data Assessment Criteria exceedances.pdf [PDF]
- Figure 20.15 Asbestos in soils.pdf [PDF]
- Figure 20.16 Settlement Contours.pdf [PDF]
- Figure 20.2 Quaternary Geomorphology.pdf [PDF]
- Figure 20.3 Quaternary Sediments.pdf [PDF]
- Figure 20.4 Bedrock Geology.pdf [PDF]
- Figure 20.5 Irish Geological Heritage sites.pdf [PDF]
- Figure 20.6 Land contamination.pdf [PDF]
- Figure 20.7 Karst Features.pdf [PDF]
- Figure 20.8 Geohazards.pdf [PDF]
- Figure 20.9 Granular Aggregate potential.pdf [PDF]
- Chapter 21 Land Take
- Chapter 22 Infrastructure and Utilities
- Chapter 23 Agronomy
- Chapter 24 Material & Waste Management
- Chapter 25 Archaeology and Cultural Heritage
- Chapter 26 Architectural Heritage
- Chapter 27 The Landscape
- Chapter 28 Risk of Major Accidents and Disasters
- Chapter 29 Interactions between the various environmental aspects
- Chapter 30 Cumulative impacts of interaction between other projects and MetroLink
- Chapter 31 Summaries of the route wide mitigation and monitoring proposed
- print []
- Volume 5 Appendices
- Chapter 01 Introduction
- Chapter 02 Methodology used in Preparation of the EIAR
- Chapter 03 Background to the MetroLink Project
- Chapter 04 Description of the MetroLink Project
- Chapter 05 MetroLink Construction Phase
- A5.1 Outline CEMP.pdf [PDF]
- A5.10 Watercourse Diversion.pdf [PDF]
- A5.11 Water Management.pdf [PDF]
- A5.12 Piling.pdf [PDF]
- A5.13 Tunnelling.pdf [PDF]
- A5.14 TBM Consumables.pdf [PDF]
- A5.15 Waste Management.pdf [PDF]
- A5.16 Track Laying.pdf [PDF]
- A5.17 Building Damage Report.pdf [PDF]
- A5.18 Construction Lighting.pdf [PDF]
- A5.19 Wider Effects Report.pdf [PDF]
- A5.2 Construction programme Including Tunnel Elements.pdf [PDF]
- A5.20 Blasting Strategy.pdf [PDF]
- A5.3 Construction Sequence Report.pdf [PDF]
- A5.4 Employment Report & Spreadsheet.pdf [PDF]
- A5.5 Glasnevin Construction Report.pdf [PDF]
- A5.6 Abnormal Load Route Survey Report.pdf [PDF]
- A5.7 Construction Vehicles, Plant & Equipment.pdf [PDF]
- A5.8 Demolition General.pdf [PDF]
- A5.9 Demolition Tara St.pdf [PDF]
- Chapter 06 MetroLink Operations and Maintenance
- Chapter 07 Consideration of Alternatives
- A7.1 Fosterstown Options Report.pdf [PDF]
- A7.10 Trinity College - Alignment Options Assessment.pdf [PDF]
- A7.2 Tara St Report.pdf [PDF]
- A7.3 St Stephens Green Report.pdf [PDF]
- A7.4 Charlemont Shafts Options Report.pdf [PDF]
- A7.5 St Stephen's Green Station - Mined Options Review.pdf [PDF]
- A7.6 Depot Location Options Report.pdf [PDF]
- A7.7 St Stephen’s Green Station Study - Alternative Station Location within St Stephen’s Green East Carriageway.pdf [PDF]
- A7.8 St Stephen's Green Station Options Assessment Summary.pdf [PDF]
- A7.9 Terminus Station at Charlemont compared to St. Stephens Green.pdf [PDF]
- Chapter 08 Consultation
- A8.1 Press Release Examples.pdf [PDF]
- A8.10 PR Flyer.pdf [PDF]
- A8.11 PR Public Consultation Report.pdf [PDF]
- A8.12 PR Submission Forms.pdf [PDF]
- A8.13 PR Photos from Consultation Document.pdf [PDF]
- A8.14 ACP Stakeholder Email.pdf [PDF]
- A8.15 ACP Brochure & Feedback Form.pdf [PDF]
- A8.16 Report on the ACP Tunnel Intervention Shaft.pdf [PDF]
- A8.17 STEPS.pdf [PDF]
- A8.18 Summarised Questions.pdf [PDF]
- A8.19 Meetings Register.pdf [PDF]
- A8.2 Media Clippings.pdf [PDF]
- A8.3 Social Media Clippings.pdf [PDF]
- A8.4 EPR Stakeholder Emails.pdf [PDF]
- A8.5 EPR Flyer.pdf [PDF]
- A8.6 EPR Event Photos.pdf [PDF]
- A8.7 EPR Public Consultation Report.pdf [PDF]
- A8.8 PR Stakeholder Emails.pdf [PDF]
- A8.9 PR Newspaper Adverts.pdf [PDF]
- Chapter 09 Traffic and Transport
- Chapter 10 Human Health
- Chapter 11 Population and Land Use
- A11.1 Spatial Data Sources.pdf [PDF]
- A11.2 Commuter Analysis (workplace zone data).pdf [PDF]
- A11.3 Tourist Accomodation.pdf [PDF]
- A11.4 Supermarket Convenience Stores.pdf [PDF]
- A11.5 Social Infrastructure.pdf [PDF]
- A11.6 Open Space, Leisure, Recreation and Sports Facilities.pdf [PDF]
- A11.7 Land Use Zoning.pdf [PDF]
- Chapter 12 Electromagnetic Compatibility and Stray Current
- A12.1 MetroLink Electromagnetic Radiation Baseline Survey Report.pdf [PDF]
- A12.2 Trinity College Dublin Direct Current and Near Direct Current Electromagnetic Radiation Survey Report.pdf [PDF]
- A12.3 Instrument Landing System and Electromagnetic Fields from MetroLink at Dublin Airport.pdf [PDF]
- A12.4 MetroLink DC Field Intensities at Dublin Airport.pdf [PDF]
- A12.5 Flux Valves and Electromagnetic Fields from MetroLink.pdf [PDF]
- A12.6 Trinity College Dublin Direct Current and Near Direct Current Field Simulation Testing Survey Report.pdf [PDF]
- Chapter 13 Airborne Noise and Vibration
- A13.1 Baseline Noise Monitoring Report.pdf [PDF]
- A13.2 Baseline Noise Monitoring Report - Appendices.pdf [PDF]
- A13.3 Baseline Vibration Monitoring Report.pdf [PDF]
- A13.4 Baseline Noise Monitoring NCH and Gate Theatre.pdf [PDF]
- A13.5 Baseline Vibration Monitoring at Trinity College Dublin.pdf [PDF]
- A13.7 Construction Phase modelling.pdf [PDF]
- A13.8 Operational Phase Modelling.pdf [PDF]
- Chapter 14 Ground-borne Noise and Vibration
- A14.1 Relevant guidance and standards.pdf [PDF]
- A14.2 Train Characteristics.pdf [PDF]
- A14.3 Track Support System Assumptions.pdf [PDF]
- A14.4 Groundborne Noise Numerical Modelling Method FINDWAVE.pdf [PDF]
- A14.5 Groundborne Noise and Vibration and Blasting Modelling Results.pdf [PDF]
- A14.6 Airborne Noise & Groundborne Noise Mitigation Policy.pdf [PDF]
- Chapter 15 Biodiversity
- A15.1 MetroLink Invasive Species Technical Report - Glasnevin.pdf [PDF]
- A15.10 Relevant Protective Policies.pdf [PDF]
- A15.2 Desktop Study Results.pdf [PDF]
- A15.3 Habitat Survey Results - Species Lists .pdf [PDF]
- A15.4 Detailed Botanical Data.pdf [PDF]
- A15.5 Breeding Bird Species Recorded.pdf [PDF]
- A15.6 Wintering Bird Species Recorded.pdf [PDF]
- A15.7 Aquatic and Fisheries Assessment Report.pdf [PDF]
- A15.8 Outline Invasive Species Management Plan.pdf [PDF]
- A15.9 Aquatic survey of the Royal Canal at the 5th Level, Phibsborough.pdf [PDF]
- Chapter 16 Air Quality
- Chapter 17 Climate
- Chapter 18 Hydrology
- A18.1 Baseline Surface Water - Laboratory Summary July to August 2018.pdf [PDF]
- A18.2 Baseline Surface Water - Laboratory Summary December 2018.pdf [PDF]
- A18.3 Baseline Surface Water - Laboratory Summary April to May 2019.pdf [PDF]
- A18.4 MetroLink ESBN Construction Methodology of HV Cable Routes.pdf [PDF]
- A18.5 Flood Risk Assessment.pdf [PDF]
- Chapter 19 Hydrogeology
- A19.1 Summary of Analytical Results - GW Initial Interim Rounds for 201819 summary text.pdf [PDF]
- A19.10 Hydrogeological Plan for MetroLink.pdf [PDF]
- A19.11 Hydrogeological Review for Tara Street and Swords Central.pdf [PDF]
- A19.2 Summary of Analytical Results - Groundwater Pumping Test Areas (20192020).pdf [PDF]
- A19.3a Groundwater Monitoring Record Sheets Round 1 2021.pdf [PDF]
- A19.3b Groundwater Monitoring Record Sheets Round 2 2021.pdf [PDF]
- A19.3c Groundwater Monitoring Results Analytical Results 2021.pdf [PDF]
- A19.3d Groundwater Monitoring Results Analytical Results 2021 - Key Text.pdf [PDF]
- A19.4 Groundwater Datalogger Hydrographs (period 2019-2020).pdf [PDF]
- A19.5 Groundwater Contour mapping.pdf [PDF]
- A19.6 Historical Inflows.pdf [PDF]
- A19.7 Groundwater Protection Response Matrix for MetroLink.pdf [PDF]
- A19.8 Seepage Rates Assessment in Stations Executed with Cut & Cover Method (Plaxis2D Modelling).pdf [PDF]
- A19.9 Barrier Effect Assessment with Visual Modflow Software Seatown-Fosterstown, Dardistown, and O’Connell St.pdf [PDF]
- Chapter 20 Soils and Geology
- A20.1 Summary of Supporting Ground Investigation Scope.pdf [PDF]
- A20.2 Summary of Relevant Exploratory Hole Locations and Monitoring Data.pdf [PDF]
- A20.3 Preliminary Conceptual Site Model.pdf [PDF]
- A20.4 Geological Models Stations.pdf [PDF]
- A20.5 Laboratory Data Screening Summaries.pdf [PDF]
- A20.6 Review of Potential Contamination Sources.pdf [PDF]
- A20.7 Updated Conceptual Site Model.pdf [PDF]
- A20.8 Land Contamination Interpretative Report.pdf [PDF]
- A20.9 Gelogical Cross Sections.pdf [PDF]
- Chapter 21 Land Take
- Chapter 22 Infrastructure and Utilities
- Chapter 23 Agronomy
- Chapter 24 Material & Waste Management
- Chapter 25 Archaeology and Cultural Heritage
- A25.1 TII Cultural Heritage Strategy.pdf [PDF]
- A25.2 Griffith Park Station Targeted Archaeological Test Excavations.pdf [PDF]
- A25.3 Archaeological Geophysical Survey Report - St Stephen's Green to Lissenhall.pdf [PDF]
- A25.4 Broadmeadow Archaeological Wade Survey.pdf [PDF]
- A25.5 MetroLink Archaeological Trial Testing Report - Lissenhall Area 1.pdf [PDF]
- A25.6 Dardistown Archaeological Geophysical Survey Report.pdf [PDF]
- A25.7 Geophysical Report -Phase 4 Lissenhall and Naul Road.pdf [PDF]
- Chapter 26 Architectural Heritage
- Chapter 27 The Landscape
- Chapter 28 Risk of Major Accidents and Disasters
- Chapter 29 Interactions between the various environmental aspects
- Chapter 30 Cumulative impacts of interaction between other projects and MetroLink
- Chapter 31 Summaries of the route wide mitigation and monitoring proposed
- Chapter 01 Introduction
- 6_Appropriate Assessment Screening Report and Natura Impact Statement
- 7_Planning Report
- 8_Miscellaneous
- Féach ar dhoiciméid ghaolmhara
-
FurtherInformation
- Féach ar dhoiciméid ghaolmhara
- Further Information Submitted by TII
- 314724 - Metrolink FI - Updated Book of Reference
- BoR Schedules 2-10.PDF Version
- Schedule 10 Book 1 of 1.pdf [PDF]
- Schedule 2 Book 1 of 2.pdf [PDF]
- Schedule 2 Book 2 of 2.pdf [PDF]
- Schedule 3 Book 1 of 4.pdf [PDF]
- Schedule 3 Book 2 of 4.pdf [PDF]
- Schedule 3 Book 3 of 4.pdf [PDF]
- Schedule 3 Book 4 of 4.pdf [PDF]
- Schedule 4 Book 1 of 2.pdf [PDF]
- Schedule 4 Book 2 of 2.pdf [PDF]
- Schedule 5 Book 1 of 1.pdf [PDF]
- Schedule 6 Book 1 of 1.pdf [PDF]
- Schedule 7 Book 1 of 1.pdf [PDF]
- Schedule 8 Book 1 of 1.pdf [PDF]
- Schedule 9 Book 1 of 1.pdf [PDF]
- Cover Letter from TII - 12th June 2024.pdf [PDF]
- Email link and Cover letter for Book of Reference.pdf [PDF]
- Table 1 Amendments to Metrolink Book of Reference.pdf [PDF]
- Table 1 Amendments to Metrolink Book of Reference_Legend.pdf [PDF]
- Table 2 Amendments to MetroLink Book of Reference.pdf [PDF]
- BoR Schedules 2-10.PDF Version
- 314724 - Metrolink FI - Updated Book of Reference
- Further Information Submitted by TII
- Féach ar dhoiciméid ghaolmhara
-
Responses
- Féach ar dhoiciméid ghaolmhara
- ABP-314724-22 - TII Response to Wild Irish Defence Submission - 31.01.25
- ABP-314724-22 - Cover email from TII to ABP - 31.01.25.pdf [PDF]
- ABP-314724-22 - Cover email from TII to ABP providing appendices - 31.01.25.pdf [PDF]
- Letter from ALG to ABP dated 31 January 2025.pdf [PDF]
- Post Oral Hearing_AA Update - Final.pdf [PDF]
- Response to Wild Ireland Defence Submission.pdf [PDF]
- Update to the Cumulative Impact Assessment Report.pdf [PDF]
- Response to Further Public Notice
- ABP-314724-22 - TII Response to Wild Irish Defence Submission - 31.01.25
- Féach ar dhoiciméid ghaolmhara
Mura bhfuil an cás seo cinnte, is féidir go mbeidh ar do chumas tuairim a thabhairt, déan nóta den chásuimhir agus faigh tuilleadh eolais anseo.
Finscéal Léarscáil
- Cás Beo
- Deonaithe
- Diúltaithe
- Neamhbhailí
- Tarraingthe siar
- Féach Cás le haghaidh tuilleadh sonraí