An Coimisiún Pleanála - Tagairt an cháis: PAX09.324763
located in Ballydermot (and other townlands), County Offaly and County Kildare. (www.ballydermotwindfarmplanning.ie).
Comhairle Contae Chill Dara
Cur síos
10 year planning permission for the proposed development of Ballydermot Windfarm comprising of 46 no. wind turbines, an onsite 220kV substation, an offsite 220V substation and associated infrastructure,
Cineál Cáis
Forbairt Phríobháideach - Iarratas RED III
Cinneadh
Case is due to be decided by 28/10/2027
TMTT
Tá
RTN
Tá
Páirtithe
-
Bord na Móna Powergen Ltd (Active)
Stair
-
30/10/2026
Lodged
Doiciméid
-
Case Documentation
- Féach ar dhoiciméid ghaolmhara
- Applicant Documents
- Application
- EIAR
- Volume 1 EIAR Chapters
- Ch. 1 Introduction - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 10 Air Quality - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 11 Climate - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 12 Noise and Vibration - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 13 Landscape and Visual - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 14 Cultural Heritage - F - 2026.10.28 - 250708 .pdf [PDF]
- Ch. 15 Material Assets - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 16 Aviation - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 17 Major Accidents and Natural Disasters - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 18 Interaction of the Foregoing - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 19 Schedule of Mitigation and Monitoring Measures - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 2 Background to the Proposed Project - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 20 Summary of Significance of Effects - F - 2026.10.28 - 250708 .pdf [PDF]
- Ch. 3 Site Selection and Reasonable Alternatives - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 4 Description of the Proposed Project - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 5 Population and Human Health - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 6 Biodiversity - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 7 Ornithology - F - 2026.10.28 -250708.pdf [PDF]
- Ch. 8 Land, Soils and Geology - F - 2026.10.28 - 250708.pdf [PDF]
- Ch. 9 Water - F - 2026.10.28 - 250708.pdf [PDF]
- Non-Technical Summary - F - 2026.10.28 - 250708.pdf [PDF]
- References - F - 2026.10.28 - 250708.pdf [PDF]
- Volume 1 EIAR and NTS Table of Contents - F - 2026.10.28 - 250708.pdf [PDF]
- Volume 2 Photomontage Booklet
- VP01 Crosspatrick Hill.pdf [PDF]
- VP02 Lullymore West.pdf [PDF]
- VP03 Lullymore East.pdf [PDF]
- VP04 Clonbulloge.pdf [PDF]
- VP05 Ballydermot.pdf [PDF]
- VP06 Ticknevin.pdf [PDF]
- VP07 Bond Bridge.pdf [PDF]
- VP08 The Curragh.pdf [PDF]
- VP09 Blundell Aqueduct.pdf [PDF]
- VP10 Croghan Hill.pdf [PDF]
- VP11 Walsh Island.pdf [PDF]
- VP12 Boston Hill.pdf [PDF]
- VP13 Coolygagan.pdf [PDF]
- VP14 Royal Canal.pdf [PDF]
- VP15 Edenderry.pdf [PDF]
- VP16 Portarlington.pdf [PDF]
- VP17 Ballynafagh.pdf [PDF]
- VP18 Hamilton Bridge.pdf [PDF]
- VP19E Lullymore Cemetery.pdf [PDF]
- VP19W Lullymore Cemetery.pdf [PDF]
- VP20 Rathangan.pdf [PDF]
- VP21 Lodge Bog Nature Reserve Boardwalk.pdf [PDF]
- VP22 Allenwood South.pdf [PDF]
- VP23 Prosperous.pdf [PDF]
- VP24 Killybegs.pdf [PDF]
- VP25 Carbury.pdf [PDF]
- VP26 Monasterevin.pdf [PDF]
- VP27 Dun Ailinne.pdf [PDF]
- Volume 3 EIAR Appendices
- Appendix 11-1 Climate Legislation and Policy - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 11-2 Carbon Calculations - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 12-1 Glossary of Acoustic Terms - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 12-2 Summary of Background Survey - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 12-3 Noise Modelling Parameters - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 12-4 Noise Contour Maps - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 12-5 Predicted Noise Levels - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 12-6 Noise Complaint Management Plan - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 13-1 LVIA Methodology - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 13-2 LCA Assessment Tables - F - 250708.pdf [PDF]
- Appendix 13-3 Photomontage Visual Impact Assessment Tables - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 13-4 A0 Baseline Map - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 13-5 Embeded LVIA Mitigation - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 14-1 Photographic Record - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 14-2 Excavations Database Entries - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 14-3 SI Archaeological Monitoring Report - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 14-4 Recorded Monuments within 5km of the nearest Proposed Turbine - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 14-5 Protected Structures within 5km of the nearest Proposed Turbine - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 14-6 NIAH structures within 5km of the nearest Proposed Turbine - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 15-1 Traffinomics Traffic Count Data - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 15-2 Traffic Management Plan - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 15-3 Turbine Delivery Autotrack Assessment - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 15-4 Preliminary Link Capacity Assessment - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 15-5 Junction Capacity Assessment - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 15-6 Junction Design Drawings -F- 2026.10.28 - 250708.pdf [PDF]
- Appendix 15-7 Stage 1 Road Safety - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 15-8 Telecommunications Impact Assessment Report - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 16-1 Airspace Analysis - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 2-1 Scoping Responses - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 2-2 Ballydermot Wind Farm Community Report - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 2-3 Cumulative List - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 2-4 Cutaway Bog Decommissioning and Rehabilitation Plan - F -2026.10.28 -250708.pdf [PDF]
- Appendix 4-1 Site Layout Drawings - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 4-2 Ballydermot Wind Farrm Amenity Map - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 4-3 Peat and Spoil Management Plan - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 4-4 Construction and Environmental Management Plan - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 4-5 Drainage Drawings - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 4-6 Surface Water Management Plan - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 4-7 Decommissioning Plan - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 5-1 BHS Advice on Wind Turbines and Equestrian Access 2025 - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 5-2 Wind Farms & Health Literature Review - Chapman 2015 - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 5-3 ESB EMF Booklet - April 2017 - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 5-4 House Prices Study - CXC Scotland 2016 - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 5-5 Shadow Flicker Summary Tables and Sensitive Receptors - 2026.10.28 - 250708.pdf [PDF]
- Appendix 6-1 Botanical Assessment Report F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 6-2 Bat Report - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 6-3 Aquatic Baseline Report - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 6-4 Pollinator Survey Results - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 6-5 Biodiversity Management Plan - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 6-7 Biodiversity Surveyors List and Biographies - F- 2026.10.28 -250708.pdf [PDF]
- Appendix 7-1 Survey Effort - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 7-2 Species List - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 7-3 Summary Data - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 7-4 Survey Data - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 7-6 Collision Risk Assessment - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 7-7 Bird Monitoring Programme - F - 2026.10.23 - 250708.pdf [PDF]
- Appendix 7-8 Ornithology Surveyors and Biographies - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 8-1 Geotechnical and Peat Stability Report - F - 14.10.2026 - 250708.pdf [PDF]
- Appendix 9-1 Wind Farm and Onsite Substation SSFRA - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 9-2 Grid Connection and Offsite Substation SSFRA - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 9-3 Original Laboratory Reports - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 9-4 WFD Assessment - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 9-5 Operational Phase Drainage Schematic - F - 2026.10.28 - 250708.pdf [PDF]
- Volume 3 EIAR Appendices Table of Contents - 2026.10.28 - 250708.pdf [PDF]
- Volume 1 EIAR Chapters
- NIS
- AASR NIS - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 1 Statement of Authority F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 10 Decommissioning Plan - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 11 Collision Risk Assessment - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 12 Schedule of Mitigation and Monitoring - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 2 Aquatic Baseline Report - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 3 Cutaway Bog Decommissioning and Rehabilitation Plan - F -2026.10.28 -250708.pdf [PDF]
- Appendix 4 Survey Effort - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 5 Chapter 9 Water of the EIAR - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 6 Site Layout Drawings - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 7 Ornithology Survey Results- F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 8 List of Plans and Projects - F - 2026.10.28 - 250708.pdf [PDF]
- Appendix 9 Construction and Environmental Management Plan - F - 2026.10.28 - 250708.pdf [PDF]
- NIS Appendices Table of Contents - F - 2026.10.28 - 250708.pdf [PDF]
- Planning Documentation
- 01 Planning Report - F 2026.10.28 - 250708.pdf [PDF]
- 02 Cover Letter - F - 2026.10.28 - 250708.pdf [PDF]
- 03 Ballydermot WF - SID Application Form - F - 2026.10.28 - 250708.pdf [PDF]
- 03a Addendum 1 - Schedule of Drawings 2026.10.28 - 250708.pdf [PDF]
- 03b Addendum 2 - Landowner Letters of Consent and Support - 2026.10.28 - 250708.pdf [PDF]
- 03c Addendum 3 - Pre-application Consultations - F - 2026.10.298- 250708.pdf [PDF]
- 03d Addendum 4 - Prescribed Body Letters - 2026.10.28 - 250708.pdf [PDF]
- 03e Addendum 5 - EIA Portal ID Confirmation - 2026.10.28 - 250708.pdf [PDF]
- 04 Local Newspaper Notice - Leinster Express - F - 2026.10.28- 250708.pdf [PDF]
- 04 Local Newspaper Notice - Leinster Leader - F - 2026.10.28 - 250708.pdf [PDF]
- 05 National Newspaper Notice - Irish Independent - F - 2026.10.28 - 250708.pdf [PDF]
- 06 Site Notice - F - 2026.10.28 - 250708.pdf [PDF]
- Planning Drawings
- 06- 250708-06 Vegetation Removal Plan (1 15,000).pdf [PDF]
- 07- 250708-07 Proposed Enhancement Areas Plan (1 15,000).pdf [PDF]
- 08- 250708-08 Proposed Temporary Construction Compound 01 (1 500).pdf [PDF]
- 09- 250708-9 Proposed Temporary Construction Compound 02 (1 500).pdf [PDF]
- 1-250708-01 Location Context Map (1 50,000).pdf [PDF]
- 1-250708-02 Site Location Key Map Overall (1 50,000).pdf [PDF]
- 10- 250708-10 Proposed Temporary Construction Compound 03 (1 500).pdf [PDF]
- 11- 250708-11 Proposed Temporary Construction Compound 04 (1 500).pdf [PDF]
- 12- 250708-12 Proposed Temporary Construction Compound 05 (1 500).pdf [PDF]
- 13- 250708-13 Proposed Temporary Construction Compound 06 (1 500).pdf [PDF]
- 14- 250708-14 Proposed Temporary Construction Compound 07 (1 500).pdf [PDF]
- 15- 250708-15 Proposed Temporary Construction Compound 08 (1 500).pdf [PDF]
- 16- 250708-16 Proposed Temporary Construction Compound 09 (1 500).pdf [PDF]
- 17- 250708-17 Proposed Temporary Construction Compound 10 (1 500).pdf [PDF]
- 18- 250708-18 Proposed Amenity Car Park 01 & 02 (1 500).pdf [PDF]
- 19- 250708-19 Proposed Amenity Car Park 03 (1 500).pdf [PDF]
- 2- 250708-02A Site Location Key Map A (1 30,000).pdf [PDF]
- 2- 250708-02B Site Location Key Map B (1 10,000).pdf [PDF]
- 2- 250708-2.01 Site Location Map Sheet 1 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.02 Site Location Map Sheet 2 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.03 Site Location Map Sheet 3 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.04 Site Location Map Sheet 4 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.05 Site Location Map Sheet 5 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.06 Site Location Map Sheet 6 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.07 Site Location Map Sheet 7 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.08 Site Location Map Sheet 8 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.09 Site Location Map Sheet 9 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.10 Site Location Map Sheet 10 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.11 Site Location Map Sheet 11 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.12 Site Location Map Sheet 12 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.13 Site Location Map Sheet 13 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.14 Site Location Map Sheet 14 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.15 Site Location Map Sheet 15 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.16 Site Location Map Sheet 16 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.17 Site Location Map Sheet 17 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.18 Site Location Map Sheet 18 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.19 Site Location Map Sheet 19 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.20 Site Location Map Sheet 20 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.21 Site Location Map Sheet 21 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.22 Site Location Map Sheet 22 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.23 Site Location Map Sheet 23 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.24 Site Location Map Sheet 24 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.25 Site Location Map Sheet 25 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.26 Site Location Map Sheet 26 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.27 Site Location Map Sheet 27 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.28 Site Location Map Sheet 28 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.29 Site Location Map Sheet 29 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.30 Site Location Map Sheet 30 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.31 Site Location Map Sheet 31 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.32 Site Location Map Sheet 32 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.33 Site Location Map Sheet 33 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.34 Site Location Map Sheet 34 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.35 Site Location Map Sheet 35 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.36 Site Location Map Sheet 36 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.37 Site Location Map Sheet 37 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.38 Site Location Map Sheet 38 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.39 Site Location Map Sheet 39 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.40 Site Location Map Sheet 40 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.41 Site Location Map Sheet 41 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.42 Site Location Map Sheet 42 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.43 Site Location Map Sheet 43 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.44 Site Location Map Sheet 44 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.45 Site Location Map Sheet 45 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.46 Site Location Map Sheet 46 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.47 Site Location Map Sheet 47 of 48 (1 2,500).pdf [PDF]
- 2- 250708-2.48 Site Location Map Sheet 48 of 48 (1 2,500).pdf [PDF]
- 20- 250708-20 Proposed Amenity Car Park 04 (1 500).pdf [PDF]
- 21- 250708-21 Met Mast 1 Detail (As shown).pdf [PDF]
- 22- 250708-22 Met Mast 2 Detail (As shown).pdf [PDF]
- 23- 250708-23 Temporary Accommodation Works 1 (As shown).pdf [PDF]
- 24- 250708-24 Temporary Accommodation Works 2 (As shown).pdf [PDF]
- 25- 250708-25 Wind Turbine Elevations and Plan (200m) (1 500).pdf [PDF]
- 26- 250708-26 Wind Turbine Elevations and Plan (220m) (1 500).pdf [PDF]
- 27- 250708-27 Bored & Piled Foundation Details (As shown).pdf [PDF]
- 28- 250708-28 Gravity Foundation Details (As shown).pdf [PDF]
- 29- 250708-29 Wheel Wash Detail (1 50).pdf [PDF]
- 3- 250708-03 Site Layout Key Plan - Overall (1 2,500).pdf [PDF]
- 3- 250708-03A Site Layout Key Plan A (1 2,500).pdf [PDF]
- 3- 250708-03B Site Layout Key Plan B (1 2,500).pdf [PDF]
- 3- 250708-3.01 Site Layout Plan Sheet 1 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.02 Site Layout Plan Sheet 2 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.03 Site Layout Plan Sheet 3 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.04 Site Layout Plan Sheet 4 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.05 Site Layout Plan Sheet 5 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.06 Site Layout Plan Sheet 6 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.07 Site Layout Plan Sheet 7 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.08 Site Layout Plan Sheet 8 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.09 Site Layout Plan Sheet 9 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.10 Site Layout Plan Sheet 10 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.11 Site Layout Plan Sheet 11 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.12 Site Layout Plan Sheet 12 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.13 Site Layout Plan Sheet 13 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.14 Site Layout Plan Sheet 14 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.15 Site Layout Plan Sheet 15 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.16 Site Layout Plan Sheet 16 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.17 Site Layout Plan Sheet 17 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.18 Site Layout Plan Sheet 18 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.19 Site Layout Plan Sheet 19 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.20 Site Layout Plan Sheet 20 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.21 Site Layout Plan Sheet 21 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.22 Site Layout Plan Sheet 22 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.23 Site Layout Plan Sheet 23 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.24 Site Layout Plan Sheet 24 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.25 Site Layout Plan Sheet 25 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.26 Site Layout Plan Sheet 26 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.27 Site Layout Plan Sheet 27 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.28 Site Layout Plan Sheet 28 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.29 Site Layout Plan Sheet 29 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.30 Site Layout Plan Sheet 30 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.31 Site Layout Plan Sheet 31 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.32 Site Layout Plan Sheet 32 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.33 Site Layout Plan Sheet 33 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.34 Site Layout Plan Sheet 34 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.35 Site Layout Plan Sheet 35 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.36 Site Layout Plan Sheet 36 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.37 Site Layout Plan Sheet 37 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.38 Site Layout Plan Sheet 38 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.39 Site Layout Plan Sheet 39 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.40 Site Layout Plan Sheet 40 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.41 Site Layout Plan Sheet 41 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.42 Site Layout Plan Sheet 42 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.43 Site Layout Plan Sheet 43 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.44 Site Layout Plan Sheet 44 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.45 Site Layout Plan Sheet 45 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.46 Site Layout Plan Sheet 46 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.47 Site Layout Plan Sheet 47 of 48 (1 2,500).pdf [PDF]
- 3- 250708-3.48 Site Layout Plan Sheet 48 of 48 (1 2,500).pdf [PDF]
- 30- 250708-30 Signage Detail (1 20).pdf [PDF]
- 31- 250708-31 Security Gate Detail (1 20).pdf [PDF]
- 32- 250708-32 Palisade Fence and Gate Details (1 20).pdf [PDF]
- 33- 250708-33 Site Office & Staff Facilities Detail (1 50).pdf [PDF]
- 34- 250708-34 Internal Collector Network Typical Trench Arrangement Detail (1 20).pdf [PDF]
- 35- 250708-35 Clear Span Water Crossing Detail (1 100).pdf [PDF]
- 36- 250708-36 Proposed Bench and Seating Detail (1 10).pdf [PDF]
- 37- 250708-37 Security Hut Detail (1 100).pdf [PDF]
- 38- 250708-38 Foul Holding Tank & Bored Well Details (1 50).pdf [PDF]
- 39- 250708-39 220 kV Overhead Line Tower (1 200).pdf [PDF]
- 4- 250708-04 Site Layout Key Plan (1 5,000) - Overall.pdf [PDF]
- 4- 250708-04A Site Layout Key Plan A (1 5,000).pdf [PDF]
- 4- 250708-04B Site Layout Key Plan B (1 5,000).pdf [PDF]
- 4- 250708-4.01 Site Layout Plan Sheet 1 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.02 Site Layout Plan Sheet 2 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.03 Site Layout Plan Sheet 3 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.04 Site Layout Plan Sheet 4 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.05 Site Layout Plan Sheet 5 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.06 Site Layout Plan Sheet 6 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.07 Site Layout Plan Sheet 7 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.08 Site Layout Plan Sheet 8 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.09 Site Layout Plan Sheet 9 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.10 Site Layout Plan Sheet 10 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.11 Site Layout Plan Sheet 11 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.12 Site Layout Plan Sheet 12 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.13 Site Layout Plan Sheet 13 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.14 Site Layout Plan Sheet 14 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.15 Site Layout Plan Sheet 15 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.16 Site Layout Plan Sheet 16 of 17 (1 5,000).pdf [PDF]
- 4- 250708-4.17 Site Layout Plan Sheet 17 of 17 (1 5,000).pdf [PDF]
- 40- 250708-40 Joint Bay Detail (As shown).pdf [PDF]
- 41- 250708-41 Proposed Amenity Details (1 50).pdf [PDF]
- 42- 250708-42 Proposed Amenity Plan (1 15,000).pdf [PDF]
- 43- 250708-43 220kV Grid Connection Culvert Crossing (1 20).pdf [PDF]
- 44- 250708-44 220kV Grid Connection Cable Cross Section (1 20).pdf [PDF]
- 45- 250708-45 220kV Grid Connection HDD Crossing (NTS).pdf [PDF]
- 46- 250708-46 Substation Drainage and Foul Water Sheet No 1 of 2 (As shown).pdf [PDF]
- 47- 250708-47 Substation Drainage and Foul Water Sheet No 2 of 2 (As shown).pdf [PDF]
- 48- 250708-48 Property Boundary Timber Post & Rail Fence (1 20).pdf [PDF]
- 49- 250708-49 Telecommunication Tower - Substation Compound (1 100).pdf [PDF]
- 5- 250708-05 Turbine Layout Key Plan (1 20,000).pdf [PDF]
- 5- 250708-5.01 Turbine 1 Layout Sheet 1 of 46 (1 500).pdf [PDF]
- 5- 250708-5.02 Turbine 2 Layout Sheet 2 of 46 (1 500).pdf [PDF]
- 5- 250708-5.03 Turbine 3 Layout Sheet 3 of 46 (1 500).pdf [PDF]
- 5- 250708-5.04 Turbine 4 Layout Sheet 4 of 46 (1 500).pdf [PDF]
- 5- 250708-5.05 Turbine 5 Layout Sheet 5 of 46 (1 500).pdf [PDF]
- 5- 250708-5.06 Turbine 6 Layout Sheet 6 of 46 (1 500).pdf [PDF]
- 5- 250708-5.07 Turbine 7 Layout Sheet 7 of 46 (1 500).pdf [PDF]
- 5- 250708-5.08 Turbine 8 Layout Sheet 8 of 46 (1 500).pdf [PDF]
- 5- 250708-5.09 Turbine 9 Layout Sheet 9 of 46 (1 500).pdf [PDF]
- 5- 250708-5.10 Turbine 10 Layout Sheet 10 of 46 (1 500).pdf [PDF]
- 5- 250708-5.11 Turbine 11 Layout Sheet 11 of 46 (1 500).pdf [PDF]
- 5- 250708-5.12 Turbine 12 Layout Sheet 12 of 46 (1 500).pdf [PDF]
- 5- 250708-5.13 Turbine 13 Layout Sheet 13 of 46 (1 500).pdf [PDF]
- 5- 250708-5.14 Turbine 14 Layout Sheet 14 of 46 (1 500).pdf [PDF]
- 5- 250708-5.15 Turbine 15 Layout Sheet 15 of 46 (1 500).pdf [PDF]
- 5- 250708-5.16 Turbine 16 Layout Sheet 16 of 46 (1 500).pdf [PDF]
- 5- 250708-5.17 Turbine 17 Layout Sheet 17 of 46 (1 500).pdf [PDF]
- 5- 250708-5.18 Turbine 18 Layout Sheet 18 of 46 (1 500).pdf [PDF]
- 5- 250708-5.19 Turbine 19 Layout Sheet 19 of 46 (1 500).pdf [PDF]
- 5- 250708-5.20 Turbine 20 Layout Sheet 20 of 46 (1 500).pdf [PDF]
- 5- 250708-5.21 Turbine 21 Layout Sheet 21 of 46 (1 500).pdf [PDF]
- 5- 250708-5.22 Turbine 22 Layout Sheet 22 of 46 (1 500).pdf [PDF]
- 5- 250708-5.23 Turbine 23 Layout Sheet 23 of 46 (1 500).pdf [PDF]
- 5- 250708-5.24 Turbine 24 Layout Sheet 24 of 46 (1 500).pdf [PDF]
- 5- 250708-5.25 Turbine 25 Layout Sheet 25 of 46 (1 500).pdf [PDF]
- 5- 250708-5.26 Turbine 26 Layout Sheet 26 of 46 (1 500).pdf [PDF]
- 5- 250708-5.27 Turbine 27 Layout Sheet 27 of 46 (1 500).pdf [PDF]
- 5- 250708-5.28 Turbine 28 Layout Sheet 28 of 46 (1 500).pdf [PDF]
- 5- 250708-5.29 Turbine 29 Layout Sheet 29 of 46 (1 500).pdf [PDF]
- 5- 250708-5.30 Turbine 30 Layout Sheet 30 of 46 (1 500).pdf [PDF]
- 5- 250708-5.31 Turbine 31 Layout Sheet 31 of 46 (1 500).pdf [PDF]
- 5- 250708-5.32 Turbine 32 Layout Sheet 32 of 46 (1 500).pdf [PDF]
- 5- 250708-5.33 Turbine 33 Layout Sheet 33 of 46 (1 500).pdf [PDF]
- 5- 250708-5.34 Turbine 34 Layout Sheet 34 of 46 (1 500).pdf [PDF]
- 5- 250708-5.35 Turbine 35 Layout Sheet 35 of 46 (1 500).pdf [PDF]
- 5- 250708-5.36 Turbine 36 Layout Sheet 36 of 46 (1 500).pdf [PDF]
- 5- 250708-5.37 Turbine 37 Layout Sheet 37 of 46 (1 500).pdf [PDF]
- 5- 250708-5.38 Turbine 38 Layout Sheet 38 of 46 (1 500).pdf [PDF]
- 5- 250708-5.39 Turbine 39 Layout Sheet 39 of 46 (1 500).pdf [PDF]
- 5- 250708-5.40 Turbine 40 Layout Sheet 40 of 46 (1 500).pdf [PDF]
- 5- 250708-5.41 Turbine 41 Layout Sheet 41 of 46 (1 500).pdf [PDF]
- 5- 250708-5.42 Turbine 42 Layout Sheet 42 of 46 (1 500).pdf [PDF]
- 5- 250708-5.43 Turbine 43 Layout Sheet 43 of 46 (1 500).pdf [PDF]
- 5- 250708-5.44 Turbine 44 Layout Sheet 44 of 46 (1 500).pdf [PDF]
- 5- 250708-5.45 Turbine 45 Layout Sheet 45 of 46 (1 500).pdf [PDF]
- 5- 250708-5.46 Turbine 46 Layout Sheet 46 of 46 (1 500).pdf [PDF]
- 50- 250708-50 Compound Details Sheet 1 of 2 (As shown).pdf [PDF]
- 51- 250708-51 Compound Details Sheet 2 of 2 (NTS).pdf [PDF]
- 52- 250708-52 Telecommunications Relay Mast (1 100).pdf [PDF]
- 53- 250708-53 33kV Bottomless Box Culvert Crossing (1 50).pdf [PDF]
- 54- 250708-54 33kV Culvert Crossing (1 20).pdf [PDF]
- 55- 250708-55 Proposed Culvert Upgrade (As shown).pdf [PDF]
- 56- 250708-56 Onsite Substation Compound Plan (1 500).pdf [PDF]
- 57- 250708-57 Onsite Substation Compound Elevation A-A' & B-B' (1 200).pdf [PDF]
- 58- 250708-58 Onsite Substation Compound Elevation C-C' & D-D' (1 200).pdf [PDF]
- 59- 250708-59 220kV GIS Building Plan, Elevations & Section (on site) (1 200).pdf [PDF]
- 60- 250708-60 110kV GIS Building Plan, Elevations & Section (on site) (1 200).pdf [PDF]
- 61- 250708-61 IPP Control Building Plan, Elevations & Section (on site) (1 200).pdf [PDF]
- 62- 250708 - 62 Offsite Substation Compound Plan (1 200).pdf [PDF]
- 63- 250708 - 63 Offsite Substation Compound Elevation A-A' & B-B' (1 200).pdf [PDF]
- 64- 250708 - 64 Offsite Substation Compound Elevation C-C' & D-D' (1 200).pdf [PDF]
- 65- 250708 - 65 220kV GIS Building Plan, Elevations & Section (Off site) (1 200).pdf [PDF]
- 66 - 250708-66 - Junction Design - Layout A (1 500).pdf [PDF]
- 67 - 250708-67 - Junction Design - Layout B (1 500).pdf [PDF]
- 68 - 250708-68- Junction Design - Layout C (1 500).pdf [PDF]
- 69 - 250708-69 - Junction Design - Layout D (1 500).pdf [PDF]
- 70 - 250708-70 - Junction Design - Layout E (1 500).pdf [PDF]
- 71 - 250708-71 - Junction Design - Layout F (1 500).pdf [PDF]
- 72 - 250708-72 - Junction Design - Layout G (1 500).pdf [PDF]
- 73 - 250708-73 - Junction Design - Layout H (1 500).pdf [PDF]
- 74 - 250708-74 - Junction Design - Layout I (1 500).pdf [PDF]
- 75 - 250708-75 - Junction Design - Layout J (1 500).pdf [PDF]
- 76- 250708 -76 Predator Fence Detail (1 20).pdf [PDF]
- 77- 250708-77 Amentiy Track Screening (1 50).pdf [PDF]
- 78- 250708-78 Bike Rack Detail (1 20).pdf [PDF]
- P1511-0-1026-A1-D101-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D101 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D102-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D102 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D103-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D103 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D104-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D104 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D105-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D105 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D106-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D106 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D107-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D107 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D108-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D108 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D109-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D109 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D110-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D110 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D111-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D111 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D112-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D112 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D113-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D113 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D114-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D114 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D115-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D115 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D116-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D116 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D117-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D117 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D118-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D118 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D119-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D119 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D120-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D120 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D121-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D121 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D122-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D122 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D123-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D123 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D124-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D124 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D125-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D125 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D126-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D126 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D127-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D127 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D128-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D128 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D129-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D129 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D130-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D130 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D131-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D131 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D132-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D132 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D133-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D133 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D134-00C - Proposed Construction Phase and Operational Phase Drainage Layout - D134 (1 2,000).pdf [PDF]
- P1511-0-1026-A1-D501-Rev C Drainage Details 1 - D501 (As shown).pdf [PDF]
- P1511-0-1026-A1-D502-Rev C Drainage Details 2 - D502 (As shown).pdf [PDF]
- P2319-0600-0021 Type B Excavate and Replace Access Road (1 25).pdf [PDF]
- P2319-0600-0022 Type C New Floated Access Road (1 20).pdf [PDF]
- P2319-0600-0023 Transition Between Floated and Bounded Roads (1 25).pdf [PDF]
- P2319-0600-0024 Typical cross Section through Peat Storage Area.pdf [PDF]
- P2319-0600-0025 Type A Upgrade to Existing Floating Access Track (1 20).pdf [PDF]
- Schedule of Drawings.pdf [PDF]
- EIAR
- Application
- Commission Documents
- Third Party Documents
- Applicant Documents
- Féach ar dhoiciméid ghaolmhara
Is féidir tuairimí maidir leis an iarratas nó maidir leis an achomharc a thaisceadh laistigh den tréimhse ama chuí anseo.
Finscéal Léarscáil
- Cás Beo
- Deonaithe
- Diúltaithe
- Neamhbhailí
- Tarraingthe siar
- Féach Cás le haghaidh tuilleadh sonraí
Firefox
Safari
Chrome
Opera
Edge