An Coimisiún Pleanála - Tagairt an cháis: PA92.323980
in the counties of Clare, Limerick, Tipperary, Offaly, Kildare, and Dublin.
Comhairle Contae Thiobraid Árann
Cur síos
Proposed Water Supply Project for the Eastern and Midlands Region
Cineál Cáis
Forbairt Phríobháideach – Iarratas
Cinneadh
Case is due to be decided by 30/06/2026
TMTT
Tá
RTN
Tá
Páirtithe
-
Uisce Éireann (Applicant)
-
Tipperary County Council (Planning Authority)
-
Offaly County Council (Local Authority)
-
Kildare County Council (Local Authority)
-
South Dublin County Council (Local Authority)
-
Clare County Council (Local Authority)
-
Limerick City & County Council (Local Authority)
-
Uisce Éireann (Active)
Stair
-
19/12/2025
Lodged
Doiciméid
-
Case Documentation
- Féach ar dhoiciméid ghaolmhara
- Applicant Documents
- Application Documents
- 1. Statutory Documents
- 2. Planning Documents
- 1. Planning Report
- 2. SID Engineering Report
- 3. Material Contravention Statement
- 4. Consultation Report
- 5. Community Gain Proposal
- 6. Draft Abstraction Document
- 7. Planning Drawings
- 3. Environmental Documents
- Appropriate Assessment Screening
- Natura Impact Statement
- Volume 1 - Non-Technical Summary
- Volume 2 - EIAR Main Report
- Volume 3 - Environmental Assessment
- Chapter 09 Water
- Chapter 10 Soils, Geology and Hydrogeology
- Chapter 11 Agriculture
- Chapter 12 Air Quality
- Chapter 13 Climate
- Chapter 14 Population
- Chapter 15 Human Health
- Chapter 16 Landscape & Visual
- Chapter 17 Cultural Heritage
- Chapter 18 Material Assets
- Chapter 19 Resource and Waste Management
- Chapter 20 Risk of Major Accidents and Disasters
- Chapter 6 Noise & Vibration
- Chapter 7 Traffic & Transport
- Chapter 8 - Biodiversity
- Volume 4 - Summary
- Volume 5 - Drawings and Figures
- Chapter 03 Consideration of Reasonable Alternatives
- Figure-3.1-Alternative-Raw-Water-Abstraction-Sites.pdf [PDF]
- Figure-3.10-Alternative-Locations-for-BPT.pdf [PDF]
- Figure-3.11-3.14-Alternative-Booster-Pumping-Station-Sites-Overview.PDF [PDF]
- Figure-3.15-3.21-Locations-of-FCV-Sites-Overview.pdf [PDF]
- Figure-3.2-Preliminary-and-Least-Constrained-Route-Corridor.pdf [PDF]
- Figure-3.22-Proposed-and-Rejected-Compound-and-Depot-Sites.pdf [PDF]
- Figure-3.3-Route-Options-Overview.pdf [PDF]
- Figure-3.4-Pipeline-Route-Options.pdf [PDF]
- Figure-3.5-Pipeline-Route-Options.pdf [PDF]
- Figure-3.6-Pipeline-Route-Options.pdf [PDF]
- Figure-3.7-Pipeline-Route-Options.pdf [PDF]
- Figure-3.8-Initial-Areas-Considered-for-WTP-Location.pdf [PDF]
- Figure-3.9-Alternative-Locations-Considered-for-WTP-Development-within-Site-Area.PDF [PDF]
- Chapter 04 Proposed Project Description
- Figure-4.1-Overview-of-the-Proposed-Project.pdf [PDF]
- Figure-4.100-Raw-Water-Intake-and-Access-Road-Proposed-Land-Use.pdf [PDF]
- Figure-4.101-Water-Treatment-Plant-and-Access-Road-Proposed-Land-Use.pdf [PDF]
- Figure-4.102-Break-Pressure-Tank-and-Access-Road-Proposed-Land-Use.pdf [PDF]
- Figure-4.103-Booster-Pumping-Station-Proposed-Land-Use.pdf [PDF]
- Figure-4.104-Flow-Control-Valve-Proposed-Land-Use.pdf [PDF]
- Figure-4.105-Termination-Point-Reservoir-Proposed-Land-Use.pdf [PDF]
- Figure-4.106-4.184-Environmental-Masterplan.pdf [PDF]
- Figure-4.185-4.235-20-Metre-Pipeline-Corridor.pdf [PDF]
- Figure-4.2-4.60-Project-Component-Overview.pdf [PDF]
- Figure-4.61-Raw-Water-Intake-and-Pumping-Station-Proposed-Site-Layout-Plan.pdf [PDF]
- Figure-4.62-Raw-Water-Intake-and-Pumping-Station-at-Parteen-Basin-Access-Road.pdf [PDF]
- Figure-4.63-Water-Treatment-Plant-Proposed-Site-Layout-Plan.pdf [PDF]
- Figure-4.64-Water-Treatment-Plant-Access-Road-Layout-Plan-and-Cross-Section.pdf [PDF]
- Figure-4.65-Proposed-Water-Treatment-Plant-Process-Flow-Diagram.pdf [PDF]
- Figure-4.66-Break-Pressure-Tank-Site-Layout.pdf [PDF]
- Figure-4.67-Break-Pressure-Tank-Access-Road.pdf [PDF]
- Figure-4.68-Booster-Pumping-Station-Proposed-Site-Layout.pdf [PDF]
- Figure-4.69-Line-Valve-and-Flow-Control-Valve-Plan-and-Cross-Sections.pdf [PDF]
- Figure-4.70-Termination-Point-Reservoir-Proposed-Phase-1-Site-Layout.pdf [PDF]
- Figure-4.71-Termination-Point-Reservoir-Access-Road-Layout.pdf [PDF]
- Figure-4.72-Overview-of-Proposed-38kV-Uprate-Works.pdf [PDF]
- Figure-4.73-4.80-Proposed-38-kV-Uprate-Works.pdf [PDF]
- Figure-4.81-Future-Connection-Point-Valve-Detail.pdf [PDF]
- Figure-4.82-Proposed-Typical-Line-Valve-Arrangement-(Incl-2-Air-Valves).pdf [PDF]
- Figure-4.83-Proposed-Typical-Line-Valve-Arrangement-(No-Air-Valves).pdf [PDF]
- Figure-4.84-Proposed-Typical-Line-Valve-Arrangement-(Incl-1-Air-Valve-Upstream).pdf [PDF]
- Figure-4.85-Proposed-Typical-Line-Valve-Arrangement (Incl-1-Air-Valve-Downstream).pdf [PDF]
- Figure-4.86-Proposed-Typical-Air-Valve-Arrangement.pdf [PDF]
- Figure-4.87-Proposed-Typical-Washout-Valve-Arrangement.pdf [PDF]
- Figure-4.88-Typical-Line-Valve-Arrangement-(Including-Embankment-Cross-Section).pdf [PDF]
- Figure-4.89-Raw-Water-Intake-and-Pumping-Station-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.90-Raw-Water-Intake-and-Pumping-Station-Proposed-Site-Access-Road-Landscape-Plan.pdf [PDF]
- Figure-4.91-Water-Treatment-Plant-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.92-Water-Treatment-Plant-Proposed-Access-Road-Landscape-Plan.pdf [PDF]
- Figure-4.93-Break-Pressure-Tank-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.94-Break-Pressure-Tank-Proposed-Access-Road-Landscape-Plan.pdf [PDF]
- Figure-4.95-Booster-Pumping-Station-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.96-Flow-Control-Valve-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.97-Termination-Point-Reservoir-Proposed-Landscape-Plan.pdf [PDF]
- Figure-4.98-Termination-Point-Reservoir-Proposed-Access-Road-Layout-Plan.pdf [PDF]
- Figure-4.99-Landscape-Specification.pdf [PDF]
- Chapter 05 Construction & Commissioning
- Figure-5.01-Raw-Water-Intake-and-Pumping-Station-Temporary-Works-Layout.pdf [PDF]
- Figure-5.02-Water-Treatment-Plant-Indicative-Site-Compound-Plan.pdf [PDF]
- Figure-5.03-Pipe-Construction-Compound-Lisgarriff.pdf [PDF]
- Figure-5.04-Break-Pressure-Tank-Indicative-Satellite-Construction-Compound-Plan.pdf [PDF]
- Figure-5.05-Booster-Pumping-Station-Indicative-Satellite-Construction-Compound-Plan.pdf [PDF]
- Figure-5.06-Pipe-Construction-Compound-Killananny.pdf [PDF]
- Figure-5.07-Pipe-Construction-Compound-Drummond.pdf [PDF]
- Figure-5.08-Termination-Point-Reservoir-Indicative-Satellite-Construction-Compound-Plan.pdf [PDF]
- Figure-5.09-Pipe-Construction-Compound-Carrigatogher.pdf [PDF]
- Figure-5.10-Pipe-Storage-Depot-Toora.pdf [PDF]
- Figure-5.11-Pipe-Storage-Depot-Boveen.pdf [PDF]
- Figure-5.12-Pipe-Storage-Depot-Fortel.pdf [PDF]
- Figure-5.13-Pipe-Storage-Depot-Derrinboy.pdf [PDF]
- Figure-5.14-Pipe-Storage-Depot-Derryweelan.pdf [PDF]
- Figure-5.15-Pipe-Storage-Depot-Rathlumber.pdf [PDF]
- Figure-5.16-Pipe-Storage-Depot-Graiguepottle.pdf [PDF]
- Figure-5.17-Pipe-Storage-Depot-Barberstown-Upper.pdf [PDF]
- Figure-5.18-5.26-Haul-Roads.pdf [PDF]
- Figure-5.27-Typical-Construction-Working-Width.pdf [PDF]
- Figure-5.28-Typical-Construction-Working-Width-Peat.pdf [PDF]
- Figure-5.29-Water-Treatment-Plant-Construction-Sequences.pdf [PDF]
- Figure-5.30-Water-Treatment-Plant-Details-of-Entrance-at-R445.pdf [PDF]
- Figure-5.31-Damming-and-Fluming-(Typical-Arrangement).pdf [PDF]
- Figure-5.32-Damming-and-Pumping-(Typical-Arrangement).pdf [PDF]
- Figure-5.33-Typical-Trenchless-Crossing-Arrangement.pdf [PDF]
- Figure-5.34-Typical-Construction-Working-Width-Trenchless-Crossing-Launch-Pit.pdf [PDF]
- Figure-5.35-5.85-Methods-of-Construction.pdf [PDF]
- Chapter 10 Soils, Geology and Hydrogeology
- Figure-10.1-10.4 Soils.pdf [PDF]
- Figure-10.113-10.117-Landslide-Susceptibility.pdf [PDF]
- Figure-10.118-10.122-Source-Protection-Areas.pdf [PDF]
- Figure-10.123-10.134-Groundwater-Monitoring.pdf [PDF]
- Figure-10.13-Karst-and-Groundwater-Flooding.pdf [PDF]
- Figure-10.135-to-10.149-Conceptual-Site-Model.pdf [PDF]
- Figure-10.14-10.17-Groundwater-Vulnerability.pdf [PDF]
- Figure-10.150-10.162-Proposed-Bord-na-Móna-Groundwater-Monitoring-Locations.pdf [PDF]
- Figure-10.18-10.22-Soils-Geological-Heritage.pdf [PDF]
- Figure-10.23-10.81-GI-Locations.pdf [PDF]
- Figure-10.5-10.8-Subsoils.pdf [PDF]
- Figure-10.82-10.86-Potential-Contaminated-Land.pdf [PDF]
- Figure-10.87-10.91-Geomorphology.pdf [PDF]
- Figure-10.9-10.12-Geology.pdf [PDF]
- Figure-10.92-10.112-Peat-Areas.pdf [PDF]
- Chapter 11 Agriculture
- Chapter 12 Air Quality
- Chapter 14 Population
- Chapter 15 Human Health
- Chapter 16 Landscape & Visual
- Figure-16.1-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Raw-Water-Intake-&-Pumping-Station.pdf [PDF]
- Figure-16.10-Viewpoint-Locations-Selected-for-the-Proposed-Raw-Water-Intake-&-Pumping-Station.pdf [PDF]
- Figure-16.11-Viewpoint-Locations-Selected-for-the-Proposed-Water-Treatment-Plant.pdf [PDF]
- Figure-16.12-Viewpoint-Locations-Selected-for-the-Proposed-Break-Pressure-Tank.pdf [PDF]
- Figure-16.13-Viewpoint-Locations-Selected-for-the-Proposed-Booster-Pumping-Station.pdf [PDF]
- Figure-16.14-Viewpoint-Locations-Selected-for-the-Proposed-Termination-Point-Reservoir.pdf [PDF]
- Figure-16.15-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Booster-Pumping-Station.pdf [PDF]
- Figure-16.16-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Booster-Pumping-Station.pdf [PDF]
- Figure-16.17-Viewpoint-Locations-Selected-for-the-Proposed-Flow-Control-Valve.pdf [PDF]
- Figure-16.2-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Raw-Water-Intake-&-Pumping-Station.pdf [PDF]
- Figure-16.3-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Water-Treatment-Plant.pdf [PDF]
- Figure-16.4-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Water-Treatment-Plant.pdf [PDF]
- Figure-16.5-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Break-Pressure-Tank.pdf [PDF]
- Figure-16.6-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Break-Pressure-Tank.pdf [PDF]
- Figure-16.7-Digital-Terrain-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Termination-Point-Reservoir.pdf [PDF]
- Figure-16.8-Digital-Surface-Model-Zone-of-Theoretical-Visibility-Map-Proposed-Termination-Point-Reservoir.pdf [PDF]
- Figure-16.9-Viewpoint-Locations-Selected-for-the-38kV-Uprate-Works.pdf [PDF]
- Chapter 17 Cultural Heritage
- Chapter 18 Material Assets
- Chapter 21 Cumulative Effects and Interactions
- Chapter 6 Noise & Vibration
- Chapter 7 Traffic & Transport
- Figure-7.1-Project-Component-Overview.pdf [PDF]
- Figure-7.18-7.21-Collisions.pdf [PDF]
- Figure-7.2-7.8-Haul-Roads-(with-access-points).pdf [PDF]
- Figure-7.22-7.26-AADT-Do-Minimum-Do-Something.pdf [PDF]
- Figure-7.27-7.29-Pedestrians-and-Cyclists-for-Junctions.pdf [PDF]
- Figure-7.30-7.32-Public-Transport-for-Junctions.pdf [PDF]
- Figure-7.33-7.38-Public-Transport-or-Pedestrians-and-Cyclists-for-Road-Network.pdf [PDF]
- Figure-7.9-7.17-Traffic-Counts-overview.pdf [PDF]
- Chapter 8 Biodiversity
- Figure-8.1-European-Sites-Within-the-Potential-Zone-of-Influence-of-the-Proposed-Project.pdf [PDF]
- Figure-8.109-8.212-Protected-Fauna.pdf [PDF]
- Figure-8.2-Nationally-Designated-Sites-Within-the-Potential-Zone-of-Influence-of-the-Proposed-Project.pdf [PDF]
- Figure-8.3-Ramsar-Sites-and-Nature-Reserves-Within-the-Potential-Zone-of-Influence-of-the-Proposed-Project.pdf [PDF]
- Figure-8.4-8.108-Habitat-and-Flora-Map.pdf [PDF]
- Chapter 03 Consideration of Reasonable Alternatives
- Volume 6 - Appendices
- Chapter 1 Introduction
- Chapter 10 Soils, Geology and Hydrogeology
- Appendix-A10.1-Ground-Investigations.pdf [PDF]
- Appendix-A10.10-BPS-Ground-Investigations.pdf [PDF]
- Appendix-A10.11-Lot-3-Peatlands-TWC-10,000-to-TWD-29,000.pdf [PDF]
- Appendix-A10.12-Lot-3-Peatlands.pdf [PDF]
- Appendix-A10.13-TPR-Ground-Investigations.pdf [PDF]
- Appendix-A10.14-Supplemental-Ground-Investigations-for-Lot-3.pdf [PDF]
- Appendix-A10.15-Summary-of-Private-Groundwater-Supplies.pdf [PDF]
- Appendix-A10.16-Dewatering-Calculations.pdf [PDF]
- Appendix-A10.2-RWI-Ground-Investigations-2018-2019.pdf [PDF]
- Appendix-A10.3-Petrol-Station-Assessment.pdf [PDF]
- Appendix-A10.4-RWI&PS-Ground-Investigations-2022.pdf [PDF]
- Appendix-A10.5-RWRM-Ground-Investigations.pdf [PDF]
- Appendix-A10.6-WTP-Ground-Investigations.pdf [PDF]
- Appendix-A10.7-Lot-1-Treated-Water-Pipeline-TWO-WTP-BPT.pdf [PDF]
- Appendix-A10.8-BPT-Ground-Investigations.pdf [PDF]
- Appendix-A10.9-Lot-2-Pipeline-Ground-Investigations.pdf [PDF]
- Chapter 11 Agriculture
- Appendix-A11.1-Agronomy-Impact-Assessment-Farm-Survey.pdf [PDF]
- Appendix-A11.2-Table-of-Impact-Assessment-Pipeline-Infrastructure.pdf [PDF]
- Appendix-A11.3-Table-of-Impact-Assessment-Infrastructure-Sites.pdf [PDF]
- Appendix-A11.4-Summary-of-Land-Acquisition-Type.pdf [PDF]
- Appendix-A11.5-Table-of-Impact-Assessment-38kV-Uprate-Works.pdf [PDF]
- Chapter 12 Air Quality
- Chapter 14 Population
- Chapter 15 Human Health
- Chapter 16 Landscape & Visual
- Appendix-A16.1-Operational-Phase-Visual-Impact-Appraisal-at-Representative-View-Points.pdf [PDF]
- Appendix-A16.2-Photomontages-38kV-Uprate-Works.pdf [PDF]
- Appendix-A16.2-Photomontages-Booster-Pumping-Station.pdf [PDF]
- Appendix-A16.2-Photomontages-Break-Pressure-Tank.pdf [PDF]
- Appendix-A16.2-Photomontages-Flow-Control-Valve.pdf [PDF]
- Appendix-A16.2-Photomontages-Raw-Water-Intake-&-Pumping-Station.pdf [PDF]
- Appendix-A16.2-Photomontages-Termination-Point-Reservoir.pdf [PDF]
- Appendix-A16.2-Photomontages-Water-Treatment-Plant.pdf [PDF]
- Chapter 17 Cultural Heritage
- Appendix-A17.1a-Archaeological-Geophysical-Survey-Ballyannymore,-Ballyanny-Lower-and-Tonagh-Curralanty.pdf [PDF]
- Appendix-A17.1b-Archaeological-Geophysical-Survey-Loughtown-Upper.pdf [PDF]
- Appendix-A17.2-Plates.pdf [PDF]
- Appendix-A17.3-Legislation-Protecting-the-Archaeological-Heritage-Resources.pdf [PDF]
- Appendix-A17.4-Legislation-Protecting-the-Architectural-Heritage-Resources.pdf [PDF]
- Appendix-A17.5-Impact-Assessment-and-the-Cultural-Heritage-Resource.pdf [PDF]
- Appendix-A17.6-Mitigation-Measures-and-the-Cultural-Heritage-Resource.pdf [PDF]
- Chapter 18 Material Assets
- Chapter 2 The EIA Process
- Chapter 21 Cumulative Effects and Interactions
- Chapter 3 Consideration of Reasonable Alternatives
- Chapter 4 Proposed Project Description
- Chapter 5 Construction & Commissioning
- Chapter 6 Noise & Vibration
- Chapter 7 Traffic & Transport
- Chapter 8 Biodiversity
- Appendix-A8.1-Parteen-Basin-Habitat-Assessment.pdf [PDF]
- Appendix-A8.10-Lepidoptera-Survey-Report.pdf [PDF]
- Appendix-A8.11-Vertigo-Survey-Report.pdf [PDF]
- Appendix-A8.12-Parteen-Basin-Mollusc-Survey-Report.pdf [PDF]
- Appendix-A8.13-Water-Treatment-Plant-Mollusc-Survey-Report.pdf [PDF]
- Appendix-A8.14-Watercourse-Crossing-Data.pdf [PDF]
- Appendix-A8.15-National-Research-Programme-Lakes-2016-Parteen-Basin-(Lower-Lough-Derg),-Inland-Fisheries-Ireland-Report.pdf [PDF]
- Appendix-A8.16-National-Research-Programme-Lakes-2016-Lough-Derg,-Inland-Fisheries-Ireland-Report.pdf [PDF]
- Appendix-A8.17-Aquatic-Ecological-Survey-at-the-Proposed-Parteen-Basin-Abstraction-Site-(August-2017).pdf [PDF]
- Appendix-A8.18-Aquatic-Ecological-Survey-at-the-Proposed-Parteen-Basin-Abstraction-Site-(August-2019).pdf [PDF]
- Appendix-A8.19-Aquatic-Invasive-Species-Survey-Report-2021.pdf [PDF]
- Appendix-A8.2-Assessment-of-the-Woodland-Near-Parteen-Weir.pdf [PDF]
- Appendix-A8.20-Underwater-Noise-Modelling-Report.pdf [PDF]
- Appendix-A8.21-Breeding-Bird-Summary-Report.pdf [PDF]
- Appendix-A8.22-Winter-Bird-Summary-Report.pdf [PDF]
- Appendix-A8.23-Aquatic-Invasive-Species-and-Macrophyte-Survey-at-Lough-Derg-and-Parteen-Basin.pdf [PDF]
- Appendix-A8.24-Bat-Derogation-Licence-Application.pdf [PDF]
- Appendix-A8.25-Otter-Derogation-Licence-Application-Final.pdf [PDF]
- Appendix-A8.3-Site-Description-of-Coagh-Upper-Fen,-County-Offaly.pdf [PDF]
- Appendix-A8.4-Targeted-Habitat-Surveys-Report.pdf [PDF]
- Appendix-A8.5-Rare-Plant-Surveys-Report.pdf [PDF]
- Appendix-A8.6-Fungi-Survey-Report.pdf [PDF]
- Appendix-A8.7-Lichen-Survey-Report.pdf [PDF]
- Appendix-A8.8-Bryophyte-Survey-Report.pdf [PDF]
- Appendix-A8.9-Bat-Surveys-Report.pdf [PDF]
- Chapter 9 Water
- Appendix-A9.1-Abstraction-Assessment.pdf [PDF]
- Appendix-A9.2-Pipeline-Assessment.pdf [PDF]
- Appendix-A9.3-Non-linear-Principal-Infrastructure-and-38kV-Uprate-Works-Assessment.pdf [PDF]
- Appendix-A9.4-Flood-Risk-Assessment.pdf [PDF]
- Appendix-A9.5-Baseline.pdf [PDF]
- Appendix-A9.6-Laboratory-Analysis-and-In-Situ-Results.pdf [PDF]
- Appendix-A9.7-EPA-Monitoring-Information.pdf [PDF]
- Water Status Impact Assessment Report
- Application Documents
- Commission Documents
- Third Party Documents
- Invalid Submissions
- Submissions
- Submission - A.M.R Limited - 25.02.26.pdf [PDF]
- Submission - An Taisce - 25.02.26.pdf [PDF]
- Submission - Ballymore Eustace Trout and Salmon Anglers' Association - 05.02.26.pdf [PDF]
- Submission - Brian Farrell - 10.02.26.pdf [PDF]
- Submission - Brian Leddin - 24.02.26.pdf [PDF]
- Submission - Bridget Ginnity - 18.02.26.pdf [PDF]
- Submission - Carol Killeen - 25.02.26.pdf [PDF]
- Submission - Carol-Anne Murphy - 25.02.26.pdf [PDF]
- Submission - Caroline & Mark Eldridge - 24.02.26.pdf [PDF]
- Submission - Castleconnell Boat Club - 25.02.26.pdf [PDF]
- Submission - Castleconnell River Association (CRA) - 25.02.26.pdf [PDF]
- Submission - Chambers Ireland - 24.02.26.pdf [PDF]
- Submission - Christopher Campion - 24.02.26.pdf [PDF]
- Submission - Cllr Fiona Bonfield, Alan Kelly TD, & Cllr Louise Morgan Walsh - 25.02.26.pdf [PDF]
- Submission - Cllr Rita McInerney - 23.02.26.pdf [PDF]
- Submission - Cllr Seán Hartigan - 23.02.26.pdf [PDF]
- Submission - Cllr. Dr. Phyll Bugler - 25.02.26.pdf [PDF]
- Submission - Cllr. Séamie Morris - 25.02.26.pdf [PDF]
- Submission - Danny Janssens - 05.02.26.pdf [PDF]
- Submission - Derg Open Water Swim School & Lively Wimmin Swimmin - 25.02.26.pdf [PDF]
- Submission - Development Applications Unit - 25.02.26.pdf [PDF]
- Submission - Diarmuid O'Crowley - 25.02.26.pdf [PDF]
- Submission - Dr. John Galvin - 23.02.26.pdf [PDF]
- Submission - Dublin Chamber - 25.02.26.pdf [PDF]
- Submission - Eamonn Dooley - 24.02.26.pdf [PDF]
- Submission - Edward Frayne - 25.02.26.pdf [PDF]
- Submission - Eileen Mc Namara - 25.02.26.pdf [PDF]
- Submission - EirGrid - 25.02.26.pdf [PDF]
- Submission - Environmental Protection Agency - 24.02.26.pdf [PDF]
- Submission - Environmental Trust Ireland - 25.02.26.pdf [PDF]
- Submission - Eric Conroy - 25.02.26.pdf [PDF]
- Submission - Eva Killeen - 24.02.26.pdf [PDF]
- Submission - Fergal Hayes - 24.02.26.pdf [PDF]
- Submission - Fight the Shannon Pipeline Petition - 29.01.26.pdf [PDF]
- Submission - Fintan Dunne - 24.02.26.pdf [PDF]
- Submission - Fonsell Ltd - 18.02.26.pdf [PDF]
- Submission - Friends of the Irish Environment - 25.02.26.pdf [PDF]
- Submission - Futureproof Clare Environmental CLG - 25.02.26.pdf [PDF]
- Submission - Fáilte Ireland - 25.02.26.pdf [PDF]
- Submission - Garrett O'Neill - 25.02.26.pdf [PDF]
- Submission - Garrett Reil and Cliona Geary - 25.02.26.pdf [PDF]
- Submission - Geological Survey Ireland - 16.02.26.pdf [PDF]
- Submission - Gordon Beattie and Leslie Beattie - 06.02.26.pdf [PDF]
- Submission - HSA - 13.01.26.pdf [PDF]
- Submission - Ibec - 25.02.26.pdf [PDF]
- Submission - Inland Fisheries Ireland - 23.02.26.pdf [PDF]
- Submission - James Crowley - 25.02.26.pdf [PDF]
- Submission - James Cullen Snr. - 24.02.26.pdf [PDF]
- Submission - James Waldron (Agent = Corr Property Consultants Ltd.) - 16.02.26.pdf [PDF]
- Submission - James Waldron (Agent = McEnteggart Consultancy) - 16.02.26.pdf [PDF]
- Submission - Joanne Skehan - 24.02.26.pdf [PDF]
- Submission - Joe Mayo - 24.02.26.pdf [PDF]
- Submission - John & Georgina Ringrose - 24.02.26.pdf [PDF]
- Submission - John Baker - 25.02.26.pdf [PDF]
- Submission - John Fingleton - 24.02.26.pdf [PDF]
- Submission - John Hensey - 19.02.26.pdf [PDF]
- Submission - John Quinn & Sandra Frayne - 25.02.26.pdf [PDF]
- Submission - John Sadlier - 25.02.26.pdf [PDF]
- Submission - Judith Kohler - 16.02.26.pdf [PDF]
- Submission - Keith Ball - 25.02.26.pdf [PDF]
- Submission - Kieran O'Connor - 24.02.26.pdf [PDF]
- Submission - Killaloe Ballina District Angler's Association - 25.02.26.pdf [PDF]
- Submission - Laois County Council - 25.02.26.pdf [PDF]
- Submission - Laura Kavanagh - 25.02.26.pdf [PDF]
- Submission - Liam Minehan - 25.02.26.pdf [PDF]
- Submission - Lough Derg Mermaids - 25.02.26.pdf [PDF]
- Submission - Lucy Murphy - 25.02.26.pdf [PDF]
- Submission - Mark Kinsella - 25.02.26.pdf [PDF]
- Submission - Martina Mangan - 16.02.26.pdf [PDF]
- Submission - Mattie McGrath TD - 23.02.26.pdf [PDF]
- Submission - McKeogh's Hardware Ltd - 25.02.26.pdf [PDF]
- Submission - Melina Sharp & Michael Eversen - 25.02.26.pdf [PDF]
- Submission - Melissa Anne Kenny - 19.01.26.pdf [PDF]
- Submission - Michael and Mary Kinsella - 25.02.26.pdf [PDF]
- Submission - Michael Barker & Company - 25.02.26.pdf [PDF]
- Submission - Michael Hoey - 25.02.26
- Submission - Michael Hoey - 25.02.26.pdf [PDF]
- Submission - Michael Hoey - Appendices
- 1715 2 Geo 1 Chapter 12 To encourage the draining and improving of bogs.pdf [PDF]
- Cover letter to ABP 2026.pdf [PDF]
- exhibit Brendan Slattery joins Barry Doyle 2013 -profile from web site.pdf [PDF]
- exhibit 2 b. John McKeown and the closure of the Barrow Navigation.pdf [PDF]
- exhibit MH 1 g. Arthur Cox & Procedure for Provisional Order.pdf [PDF]
- exhibit MH 25 Extract of the Memorandum of Understanding -(Appendix 8 of the Memorandum).pdf [PDF]
- exhibit -MH single photo of dredging at Gas pipe for document.pdf [PDF]
- exhibit M H 2 f Yevonne Scannell & Arthur Cox + to Nicholas O'Dwyer May 2002 -breakdown of my objection.PDF [PDF]
- exhibit M H 9 Section 68 of the Charter for the Royal and Grand Canals.pdf [PDF]
- exhibit MH 1 a Interference Notice 10 March 2003.pdf [PDF]
- exhibit MH 1 N Notification to Commercial Boat Operators - Navigation authorities for the purposes of section 21 of the WSA 1942.PDF [PDF]
- exhibit MH 7 b Letter from Waterways Ireland 9th August 2002 acknowledging formal notification of abstractions No 2 and 7.PDF [PDF]
- exhibit MH 1 Interference Notice no 1 -18 Jan 2002.pdf [PDF]
- exhibit MH 1 b. Canalways Ireland Interference Notice 10 03 2003 & Parrallel strand.PDF [PDF]
- exhibit MH 1 d An Taisce Interference Notice - 20 day of June 2003.pdf [PDF]
- exhibit MH 1 e. Petition of Michael Hoey to ABP - Boyne abstraction 2003 -Meath Eastern Regional Water Supply Provisional Order CW0502.PDF [PDF]
- exhibit MH 1 f Navigation Authority & Arthur Cox advice to Council.pdf [PDF]
- Exhibit MH 1 h Requesting Uisce Eireann to be Notified of proposal for Water Supply Project 2025 under section 21 of the WSA.PDF [PDF]
- exhibit MH 1 i. photos of dredging at Gas Pipe with boat stuck above.pdf [PDF]
- exhibit MH 1 J. Formal Notice to Navigation Authorities 19 Feb 2003.pdf [PDF]
- exhibit MH 1 k . letter of 19 Feb 2003 from KCC highlighting the need to issue an Interference Notice.PDF [PDF]
- exhibit MH 1 L ABP to Taidgh O'Cruadalaoicht stating that KCC said that 'it is not proposed to abstract water at Kildare Town.PDF [PDF]
- exhibit MH 1 m Notification to 9 Commercial operators.pdf [PDF]
- Exhibit MH 1 p - Pumping water .log [LOG]
- Exhibit MH 1 p - Pumping water for the Royal Canal at the Boyne Aquaduct 31 August 2025.pdf [PDF]
- Exhibit MH 12 ABP & No legslative provision to allow adjudication on Ancillary works.pdf [PDF]
- exhibit MH 14 EPA & Draft of Barrow Navigation & Waterways Ireland's responsibility.pdf [PDF]
- exhibit MH 14 a Waterways Ireland to MH - KCC to provide a new source for the Grand Canal.pdf [PDF]
- exhibit MH 14 b Nicholas O'Dwyer to John McKeown of WI re an additional 300 mm to draft of Barrow navigation.PDF [PDF]
- exhibit Mh 14 c Mr EIS - Conor Skehans advice to EPA and carrying our EIA 15 08 00.pdf [PDF]
- exhibit MH 14 d Report of Mr Dom Hegarty to ABP on the Barrow Abstraction proposal & the draft of the Barrow Navigation.PDF [PDF]
- exhibit MH 15 Komex Report on the Kildare Water Strategy.pdf [PDF]
- exhibit MH 16 MH submission on Bord Na Mona & substitute consent for historic peat removal.pdf [PDF]
- exhibit MH 16 a, Duchas submission to EPA re Daingean Rathdrum bog, 27 September 1999.pdf [PDF]
- Exhibit MH 2 ABP & No legslative provision to allow adjudication on Ancillary works.pdf [PDF]
- exhibit MH 2 a Table 1. abstractions from the Barrow catchment (last Updated 13 07 2015).pdf [PDF]
- exhibit MH 2 ABP dont do cumulative effects in 2003.pdf [PDF]
- exhibit MH 2 c extract from the conservation Plan for Pollardstown Fen P 37 draft 1.pdf [PDF]
- exhibit MH 2 d Letter to Waterways Ireland 05 08 2002 notifying them of seven proposed abstractions 004.PDF [PDF]
- exhibit MH 2 e Letter from Waterways Ireland 9th August 2002 acknowledging formal notification of abstractions No 2 and 7.PDF [PDF]
- exhibit MH 24 Provisional Order 151 CA 2004 Justice Abbot's Order 26th May 2005.pdf [PDF]
- exhibit MH 25 a. Carbal Report - 2007 Carbon gas balances in industrial cutaway for Bord Na Mona.PDF [PDF]
- exhibit MH 3 Letter to Irish Water 24th January 2022.pdf [PDF]
- exhibit MH 4 Class 35 A & B Planning Exemption Regs 2024.pdf [PDF]
- exhibit MH 5 Navigation Authority - UK Land Drainage Act 1930.pdf [PDF]
- exhibit MH 6 ACP have no new procedures and are prohibited from adjudicating on section 21 of WSA.PDF [PDF]
- exhibit MH 7 a Brendan slattery UCC - LA Water supply 2005 -source.pdf [PDF]
- exhibit MH 7 Arthur Cox denying my status.pdf [PDF]
- exhibit MH 8 Liam Cashman 12 Jan 2005 explaining the Need to assess the strategic needs if drawing from the same source.PDF [PDF]
- exhibit MH 8 a 04 02 2025 Response from Irish Water Uisce Eireann - alternatives considered bones of email.PDF [PDF]
- exhibit MH 8 letter from Liam Cashman European Commission.pdf [PDF]
- exhibit MH 9 March 2003 ABP clarify that there was no communications between the EPA & ABP.pdf [PDF]
- exhibit MH 9 a Charter - & extract from The Canals of the South of Ireland -Ruth Delaney.pdf [PDF]
- Interference Notice 2026 the Water Supply Project 2025 -final 24 02 2026.pdf [PDF]
- List of exhibits and their status 24 02 2026.pdf [PDF]
- Water Supplies Act of 1942.pdf [PDF]
- Submission - Michael McKeogh - 11.02.26.pdf [PDF]
- Submission - Michael Reidy - 20.02.26.pdf [PDF]
- Submission - Michelle Keary - 23.02.26.pdf [PDF]
- Submission - Michelle McNamara - 25.02.26.pdf [PDF]
- Submission - Mountshannon Community Council - 25.02.26.pdf [PDF]
- Submission - National Office for Environmental Health Services - 25.02.26.pdf [PDF]
- Submission - National Transport Authority - 25.02.26.pdf [PDF]
- Submission - Office of Public Works - 23.02.26.pdf [PDF]
- Submission - Pamela Quirke O'Meara - 24.02.26.pdf [PDF]
- Submission - Peamount Healthcare - 25.02.26.pdf [PDF]
- Submission - Port Omna Beo - 25.02.26.pdf [PDF]
- Submission - Portumna & District Angling & Boatimg Association - 25.02.26.pdf [PDF]
- Submission - Richard Cahill - 19.02.26.pdf [PDF]
- Submission - River Shannon Environmental Protection Alliance Company Ltd - 24.02.26.pdf [PDF]
- Submission - Robert Frayne - 25.02.26.pdf [PDF]
- Submission - Samuel Norris - 25.02.26.pdf [PDF]
- Submission - Sarah Conroy - 25.02.26.pdf [PDF]
- Submission - Seamus Cullen - 25.02.26.pdf [PDF]
- Submission - Senator Dee Ryan - 25.02.26.pdf [PDF]
- Submission - Shane Mathews - 16.02.26.pdf [PDF]
- Submission - St. Flannans Fishing Club - 24.02.26.pdf [PDF]
- Submission - Stefan and Olivia Hahne - 22.02.26.pdf [PDF]
- Submission - Suzanne Noble - 24.02.26.pdf [PDF]
- Submission - Terry Forristal - 23.02.26.pdf [PDF]
- Submission - The Heritage Council - 24.02.26.pdf [PDF]
- Submission - The Local Authority Waters Programme (LAWPRO) - 25.02.26.pdf [PDF]
- Submission - The Lough Derg Anglers Association - 25.02.26.pdf [PDF]
- Submission - Tom & Mary Scully - 25.02.26.pdf [PDF]
- Submission - Tony O Brien - 23.02.26.pdf [PDF]
- Submission - Transport Infrastructure Ireland 20.02.26.pdf [PDF]
- Submission - Waterways Ireland - 25.02.26.pdf [PDF]
- Submission - William Lawrence Hodges - 24.02.26.pdf [PDF]
- Submission - Yvonne Moloney - 12.02.26.pdf [PDF]
- Submission - Éadaoin Kiely & Darren Kirwan - 24.02.26.pdf [PDF]
- Applicant Documents
- Féach ar dhoiciméid ghaolmhara
Is féidir tuairimí maidir leis an iarratas nó maidir leis an achomharc a thaisceadh laistigh den tréimhse ama chuí anseo.
Finscéal Léarscáil
- Cás Beo
- Deonaithe
- Diúltaithe
- Neamhbhailí
- Tarraingthe siar
- Féach Cás le haghaidh tuilleadh sonraí
Firefox
Safari
Chrome
Opera
Edge