Proposed TEN-T Priority Route Improvement Project
Cineál Cáis
Forbairt Bóthair ÚÁ – Iarratas
Cinneadh
Case is due to be decided by 12/11/2026
TMTT
Tá
RTN
Tá
Páirtithe
-
Donegal County Council (Applicant)
-
Donegal County Council (Planning Authority) (Invalid)
-
Donegal County Council (Planning Authority) (Active)
Stair
-
07/05/2026
Lodged
Doiciméid
-
Case Documentation
- Féach ar dhoiciméid ghaolmhara
- Applicant Documents
- 13.05.26 - Email from DCC Re CPO Ommission.pdf [PDF]
- 13.05.26 - Email Thread from Donegal CoCo Requesting Document Ommission.pdf [PDF]
- Application Documents
- 1. OSR
- Volume A - Option Selection Report.pdf [PDF]
- Volume B - Constraints Report.pdf [PDF]
- Volume C - Non Environmental Appendices
- Volume D - Environmental Appendices
- Volume E - Drawings
- Volume F - Transport Modelling Report.pdf [PDF]
- Volume G - Stage 1 Matrices
- Volume H - Project Appraisal Balance Sheet.pdf [PDF]
- 10.Separate Document Containing all Mitigation Measures_Ch21_EIAR
- 18.05.26- Notices
- 2. NIS
- Appendices
- TEN-T PRIPD NIS Appx 01 Project Description.pdf [PDF]
- TEN-T PRIPD NIS Appx 02 Drawings
- 00 NIS Drawings Index.pdf [PDF]
- 01 NIS Section 1 General Arrangement Drawing.pdf [PDF]
- 02 NIS Section 2 General Arrangement Drawing.pdf [PDF]
- 03 NIS Section 3 General Arrangement Drawing.pdf [PDF]
- 04 NIS Overview of Major River Catchments.pdf [PDF]
- 05 NIS European Designated Sites.pdf [PDF]
- 06 NIS Section 1 Breeding Birds Surveys 2020.pdf [PDF]
- 07 NIS Section 1 Breeding Birds Surveys 2023.pdf [PDF]
- 08 NIS Section 1 Wintering Bird Surveys 2017-2018.pdf [PDF]
- 09 NIS Section 2 Wintering Bird Surveys 2017-2020.pdf [PDF]
- 10 NIS Section 2 Wintering Bird Surveys 2020-2021.pdf [PDF]
- 11 NIS Section 2 Wintering Bird Surveys 2022-2023.pdf [PDF]
- 12 NIS Section 2 Wintering Bird Survey Area 2025-2026.pdf [PDF]
- 13 NIS Section 1 Watercourse Survey Locations.pdf [PDF]
- 14 NIS Section 2 Watercourse Survey Locations.pdf [PDF]
- 15 NIS Section 3 Watercourse Survey Locations.pdf [PDF]
- 16 NIS Section 1 Otter Evidence 2023 & 2025.pdf [PDF]
- 17 NIS Section 1 Otter Evidence pre-2022.pdf [PDF]
- 18 NIS Section 2 Otter Evidence 2023 & 2025.pdf [PDF]
- 19 NIS Section 2 Otter Evidence pre-2022.pdf [PDF]
- 20 NIS Section 3 2025-2026 Windscreen Survey – Study Area.pdf [PDF]
- 21 NIS Section 3 2025-2026 Windscreen Survey - Survey results.pdf [PDF]
- 22 NIS Finn Crossing Elevations.pdf [PDF]
- 23 NIS Finn Crossing Access & Piling.pdf [PDF]
- 24 NIS Finn Crossing Construction & Temporary Works.pdf [PDF]
- 25 NIS Finn Crossing Constructive Method.pdf [PDF]
- 26 NIS Finn Crossing Constructive Sequence Sheet 1.pdf [PDF]
- 27 NIS Finn Crossing Constructive Sequence Sheet 2.pdf [PDF]
- 28 NIS Swilly Crossing Access & Piling.pdf [PDF]
- 29 NIS Swilly Crossing Construction & Temporary Works.pdf [PDF]
- 30 NIS Section 1 Road Lighting.pdf [PDF]
- 31 NIS Section 2 Road Lighting.pdf [PDF]
- 32 NIS Section 3 Road lighting.pdf [PDF]
- 33 NIS Section 1 Drainage.pdf [PDF]
- 34 NIS Section 2 Drainage.pdf [PDF]
- 35 NIS Section 3 Drainage.pdf [PDF]
- 36 NIS Section 2 – 2025-2026 Wintering Bird Survey Results (Curlew).pdf [PDF]
- 37 NIS Section 2 – 2025-2026 Wintering Bird Survey Results (Teal).pdf [PDF]
- 38 NIS Section 2 – 2025-2026 Wintering Bird Survey Results (Greylag Goose).pdf [PDF]
- 39 NIS Section 2 – 2025-2026 Wintering Bird Survey Results (Redshank).pdf [PDF]
- 40 NIS Section 2 – 2022-2023 Wintering Bird Survey Results (Curlew).pdf [PDF]
- 41 NIS Section 2 – 2022-2023 Wintering Bird Survey Results (Greylag Goose) .pdf [PDF]
- 42 NIS Section 2 – 2022-2023 Wintering Bird Survey Results (Redshank).pdf [PDF]
- TEN-T PRIPD NIS Appx 03 Consultations.pdf [PDF]
- TEN-T PRIPD NIS Appx 04 Otter Evidence.pdf [PDF]
- TEN-T PRIPD NIS Appx 05 Wintering Bird Evidence.pdf [PDF]
- TEN-T PRIPD NIS Appx 06 Lifford Whooper Swan Monitoring Report.pdf [PDF]
- TEN-T PRIPD NIS Appx 07 Aquatic Field Survey Results.pdf [PDF]
- TEN-T PRIPD NIS Appx 08 Loughs Agency Fisheries Data 2020-2024.pdf [PDF]
- TEN-T PRIPD NIS Appx 09 Q-Value Data.pdf [PDF]
- TEN-T PRIPD NIS Appx 10 Oligotrophic Waters.pdf [PDF]
- TEN-T PRIPD NIS Appx 11 Construction Phase Impacts (Culverts).pdf [PDF]
- TEN-T PRIPD NIS Appx 12 Operation Phase Impacts (Culverts).pdf [PDF]
- TEN-T PRIPD NIS Appx 13 Invasive Species Managment Plan.pdf [PDF]
- TEN-T PRIPD Natura Impact Statement.pdf [PDF]
- Appendices
- 3. EIAR
- EIAR Vol A NTS
- EIAR Vol B Main Report
- TEN-T EIAR Ch01 Introduction.pdf [PDF]
- TEN-T EIAR Ch02 Background+Project Need.pdf [PDF]
- TEN-T EIAR Ch03 Planning+Policy.pdf [PDF]
- TEN-T EIAR Ch04 Project Description.pdf [PDF]
- TEN-T EIAR Ch05 Assessment of Reasonable Alternatives.pdf [PDF]
- TEN-T EIAR Ch06 Traffic+Transportation Assessment.pdf [PDF]
- TEN-T EIAR Ch07 Population.pdf [PDF]
- TEN-T EIAR Ch08 Human Health.pdf [PDF]
- TEN-T EIAR Ch09A Biodiversity Terrestrial.pdf [PDF]
- TEN-T EIAR Ch09B Biodiversity Aquatic.pdf [PDF]
- TEN-T EIAR Ch10 Land Soils + Hydrogeology.pdf [PDF]
- TEN-T EIAR Ch11 Water.pdf [PDF]
- TEN-T EIAR Ch12 Air Quality.pdf [PDF]
- TEN-T EIAR Ch13 Climate.pdf [PDF]
- TEN-T EIAR Ch14 Noise & Vibration.pdf [PDF]
- TEN-T EIAR Ch15 Material Assets Agriculture.pdf [PDF]
- TEN-T EIAR Ch16 Material Assets Non-Agriculture.pdf [PDF]
- TEN-T EIAR Ch17 Cultural Heritage.pdf [PDF]
- TEN-T EIAR Ch18 Landscape + Visual.pdf [PDF]
- TEN-T EIAR Ch19 Int + CIA.pdf [PDF]
- TEN-T EIAR Ch20 Risks of Major Accidents and Disasters.pdf [PDF]
- TEN-T EIAR Ch21 Schedule of Env Commitments.pdf [PDF]
- EIAR Vol C Technical Appendices
- Chapter 10 - Appendices
- Chapter 11 - Appendices
- Chapter 14 - Appendices
- Chapter 16 - Appendices
- Chapter 17 - Appendices
- Appx C17.01 Legal & Planning Framework.pdf [PDF]
- Appx C17.02_Data Inventory Cultural Heritage.pdf [PDF]
- Appx C17.03 Overview of Study Area.pdf [PDF]
- Appx C17.04a Low Resolution LiDAR.pdf [PDF]
- Appx C17.04b Higher Resolution LiDAR.pdf [PDF]
- Appx C17.05 Geophysical Survey.pdf [PDF]
- Appx C17.06a Archaeological Testing- Drumboe.pdf [PDF]
- Appx C17.06b Archaeological Investigations Trimragh.pdf [PDF]
- Appx C17.06c Archaeological Investigations Carnshannagh.pdf [PDF]
- Appx C17.06d Archaeological Investigations Murlough.pdf [PDF]
- Appx C17.06e Arcaeological Testing Curraghalane.pdf [PDF]
- Appx C17.06f Archaeological Testing Drumgreggan.pdf [PDF]
- Appx C17.07 Site Investigations.pdf [PDF]
- Appx C17.08 S1 Summary Field Survey Results.pdf [PDF]
- Appx C17.09 S1 Detailed Survey.pdf [PDF]
- Appx C17.10 S2 Summary Field Survey.pdf [PDF]
- Appx C17.11 S2 Detailed Survey.pdf [PDF]
- Appx C17.12 S3 Summary Field Results.pdf [PDF]
- Appx C17.13 S3 Detailed Survey.pdf [PDF]
- Appx C17.14 No Predicted Impact Datasets.pdf [PDF]
- Chapter 18 - Appendices
- Chapter 19 - Appendices
- Chapter 4 - Appendices
- Chapter 5 - Appendices
- Appx C05.01 Assessment of Alternatives - Transport.pdf [PDF]
- Appx C05.02 Key Alternatives Road Layouts.pdf [PDF]
- Appx C05.03 Compound Locations Assessment.pdf [PDF]
- Appx C05.04 S1 River Finn Crossing SOR.pdf [PDF]
- Appx C05.05 S2 River Swilly Crossing SOR.pdf [PDF]
- Appx C05.06 S3 River Finn Crossing SOR.pdf [PDF]
- Appx C05.07 S3 River Finn Crossing SOR Addendum.pdf [PDF]
- Appx C05.08 Consultations Summary.pdf [PDF]
- Chapter 6 - Appendices
- Chapter 7 - Appendices
- Chapter 8 - Appendices
- Chapter 9a - Appendices
- Appx C09A.01 Biodiversity Baseline Final.pdf [PDF]
- Appx C09A.02 Ecological Evaluation Criteria.pdf [PDF]
- Appx C09A.03 Consultations.pdf [PDF]
- Appx C09A.04 Bat House Description.pdf [PDF]
- Appx C09A.05 Deer Collision Risk Assessment.pdf [PDF]
- Appx C09A.06 Bat Derogation Licenses.pdf [PDF]
- Appx C09A.07 Badger Artifical Sett Construction.pdf [PDF]
- Chapter 9b - Appendices
- Appx C09B.01 Aquatic Ecology Survey Site Descriptions.pdf [PDF]
- Appx C09B.02 Aquatic Ecology Survey Site Images.pdf [PDF]
- Appx C09B.03 Aquatic Ecology Q value Data.pdf [PDF]
- Appx C09B.04 Aquatic Ecology Construction Phase Impacts (Culverts).pdf [PDF]
- Appx C09B.05 Aquatic Ecology Operation Phase Impacts (Culverts).pdf [PDF]
- Appx C09B.06 Loughs Agency Fisheries Data 2020-2024.pdf [PDF]
- Appx C09B.07 Road De-icing Examination.pdf [PDF]
- EIAR Vol D Drawings
- Chapter 10 - Drawings
- 10.01 Bedrock Geology S1.pdf [PDF]
- 10.02 Bedrock Geology S2.pdf [PDF]
- 10.03 Bedrock Geology S3.pdf [PDF]
- 10.04 Aggregate Potential S1.pdf [PDF]
- 10.05 Aggregate Potential S2.pdf [PDF]
- 10.06 Aggregate Potential S3.pdf [PDF]
- 10.07 Geological Heritage Sites (Communal).pdf [PDF]
- 10.08 Quaternary Geology S1.pdf [PDF]
- 10.09 Quaternary Geology S2.pdf [PDF]
- 10.10 Quaternary Geology S3.pdf [PDF]
- 10.11 Corine 2018 Land Cover S1.pdf [PDF]
- 10.12 Corine 2018 Land Cover S2.pdf [PDF]
- 10.13 Corine 2018 Land Cover S3.pdf [PDF]
- 10.14 Quarries and Waste Facilites (Communal).pdf [PDF]
- 10.15 Landslide Vulnerability S1.pdf [PDF]
- 10.16 Landslide Vulnerability S2.pdf [PDF]
- 10.17 Landslide Vulnerability S3.pdf [PDF]
- 10.18 Groundwater Aquifer S1.pdf [PDF]
- 10.19 Groundwater Aquifer S2.pdf [PDF]
- 10.20 Bedrock Aquifer S3.pdf [PDF]
- 10.21Groundwater Vulnerability S1.pdf [PDF]
- 10.22 Groundwater Vulnerability S2.pdf [PDF]
- 10.23 Groundwater Vulnerability S3.pdf [PDF]
- 10.24 Groundwater Wells and Springs S1.pdf [PDF]
- 10.25 Groundwater Wells and Springs S2.pdf [PDF]
- 10.26 Groundwater Wells and Springs S3.pdf [PDF]
- 10.27 S1 GI Plans.pdf [PDF]
- 10.28 S2 GI Plans.pdf [PDF]
- 10.29 S3 GI Plans.pdf [PDF]
- Chapter 11 - Drawings
- 11.01 Catchment Layout Section 1.pdf [PDF]
- 11.02 Catchment Layout Section 2.pdf [PDF]
- 11.03 Catchment Layout Section 3.pdf [PDF]
- 11.04 OPW Arterial Drainage Schemes, Benefiting Lands & Drainage Districts Section 2.pdf [PDF]
- 11.05 OPW Arterial Drainage Schemes Benefiting Lands & Drainage Districts Section 3.pdf [PDF]
- 11.06 OPW Historical Flood Events Map Section 1.pdf [PDF]
- 11.07 OPW Historical Flood Events Map Section 2.pdf [PDF]
- 11.08 OPW Historical Flood Events Map Section 3.pdf [PDF]
- 11.09 CFRAM & NIFM Flood Extents Fluvial - Current Scenario S1.pdf [PDF]
- 11.10 CFRAM & NIFM Flood Extents Fluvial - Current Scenario S2.pdf [PDF]
- 11.11 CFRAM & NIFM Flood Extents Fluvial - Current Scenario S3.pdf [PDF]
- 11.12 CFRAM & NIFM Flood Extents Fluvial - MRFS S1.pdf [PDF]
- 11.13 CFRAM & NIFM Flood Extents Fluvial - MRFS S2.pdf [PDF]
- 11.14 CFRAM & NIFM Flood Extents Fluvial MRFS S3.pdf [PDF]
- 11.15 CFRAM & NIFM Flood Extents Fluvial - HEFS S1.pdf [PDF]
- 11.16 CFRAM & NIFM Flood Extents Fluvial - HEFS S2.pdf [PDF]
- 11.17 CFRAM & NIFM Flood Extents Fluvial HEFS S3.pdf [PDF]
- 11.18 CFRAM Flood Extents Coastal - Current Scenario S2.pdf [PDF]
- 11.19 CFRAM Flood Extents Coastal - Current Scenario S3.pdf [PDF]
- 11.20 CFRAM Flood Extents Coastal - MRFS S2.pdf [PDF]
- 11.21 CFRAM Flood Extents Coastal - MRFS S3.pdf [PDF]
- 11.22 CFRAM Flood Extents Coastal - HEFS S2.pdf [PDF]
- 11.23 CFRAM Flood Extents Coastal - HEFS S3.pdf [PDF]
- 11.24 Flood Zone Maps - CFRAM & NIFM S1.pdf [PDF]
- 11.25 Flood Zone Maps - CFRAM & NIFM S2.pdf [PDF]
- 11.26 Flood Zone Maps - CFRAM & NIFM S3.pdf [PDF]
- 11.27 Wastewater Discharges & Water Abstraction Locations S1.pdf [PDF]
- 11.28 Wastewater Discharges & Water Abstraction Locations S2.pdf [PDF]
- 11.29 Wastewater Discharges & Water Abstraction Locations S3.pdf [PDF]
- 11.30 Water Quality Map Section 1.pdf [PDF]
- 11.31 Water Quality Map Section 2.pdf [PDF]
- 11.32 Water Quality Map Section 3.pdf [PDF]
- 11.33 Water Framework Directiv 3rd Cycle 2021-2027 Risk Map S1.pdf [PDF]
- 11.34 Water Framework Directive 3rd Cycle 2021-2027 Risk Map S2.pdf [PDF]
- 11.35 Water Framework Directive 3rd Cycle 2021-2027 Risk Map S3.pdf [PDF]
- 11.36 Location of Bridge Crossings and Drainage Outfalls S1.pdf [PDF]
- 11.37 Location of Bridge Crossings and Drainage Outfalls S2.pdf [PDF]
- 11.38 Drainage Features Location Map S3.pdf [PDF]
- 11.39 Section 1 EPA Delineated Watercourse Interactions.pdf [PDF]
- 11.40 Section 2 EPA Delineated Watercourse Interactions.pdf [PDF]
- 11.41 Section 3 EPA Delineated Watercourse Interactions.pdf [PDF]
- 11.42 River Swilly Crossing - OSI Six inch Cassini Historical mapping Section 2.pdf [PDF]
- 11.43 Donegal Catchment Map.pdf [PDF]
- 11.44 Groundwater Flood Risk Map S3.pdf [PDF]
- Chapter 12 - Drawings
- Chapter 14 - Drawings
- 14.01 Section 1 Baseline Noise Monitoring Locations.pdf [PDF]
- 14.02 Section 2 Baseline Noise Monitoring Locations.pdf [PDF]
- 14.03 Section 3 Baseline Noise Monitoring Locations.pdf [PDF]
- 14.04 Section 1 Noise Barrier Locations.pdf [PDF]
- 14.05 Section 2 Noise Barrier Locations.pdf [PDF]
- 14.06 Section 3 Noise Barrier Locations.pdf [PDF]
- 14.07 Section 1 Roads Traffic Links included in Noise Model.pdf [PDF]
- 14.08 Section 2 Roads Traffic Links included in Noise Model.pdf [PDF]
- 14.09 Section 3 Roads Traffic Links included in Noise Model.pdf [PDF]
- Chapter 16 - Drawings
- 16.01 S1 Land Holdings.pdf [PDF]
- 16.02 S2 Land Holdings.pdf [PDF]
- 16.03 S3 Land Holdings.pdf [PDF]
- 16.04 S1 Existing Utilities.pdf [PDF]
- 16.05 S2 Existing Utilities.pdf [PDF]
- 16.06 S3 Existing Utilities.pdf [PDF]
- 16.07 S1 Proposed ESB Diversion.pdf [PDF]
- 16.08 S2 Proposed ESB Diversion.pdf [PDF]
- 16.09 S3 Proposed ESB Diversion.pdf [PDF]
- 16.10 S1 Proposed Irish Water Diversion.pdf [PDF]
- 16.11 S2 Proposed Irish Water Diversion.pdf [PDF]
- 16.12 S3 Proposed Irish Water Diversion.pdf [PDF]
- 16.13 S1 Proposed E-Net Diversion.pdf [PDF]
- 16.14 S2 Proposed E-Net Diversion.pdf [PDF]
- 16.15 S1 Proposed EIR Diversion.pdf [PDF]
- 16.16 S2 Proposed EIR Diversion.pdf [PDF]
- 16.17 S3 Proposed EIR Diversion.pdf [PDF]
- 16.18 S2 Proposed Fibre Optic Project Kelvin Diversion.pdf [PDF]
- 16.19 S3 Proposed Fibre Optic Project Kelvin Diversion.pdf [PDF]
- 16.20 Waste Facilities Map.pdf [PDF]
- Chapter 17 - Drawings
- Chapter 18 - Drawings
- 18.01 Landscape Character Areas-Designations - Section 1.pdf [PDF]
- 18.02 Landscape Character Areas-Designations - Section 2.pdf [PDF]
- 18.03 Landscape Character Areas-Designations - Section 3.pdf [PDF]
- 18.04 Scenic Amenity Areas - Section 1.pdf [PDF]
- 18.05 Scenic Amenity Areas - Section 2.pdf [PDF]
- 18.06 Scenic Amenity Areas - Section 3.pdf [PDF]
- 18.07 Rural Area Types - Section 1.pdf [PDF]
- 18.08 Rural Area Types -Section 2.pdf [PDF]
- 18.09 Rural Area Types - Section 3.pdf [PDF]
- 18.10 Viewpoint Location Plan- Section 1.pdf [PDF]
- 18.11 Viewpoint Location Plan - Section 2.pdf [PDF]
- 18.12 Viewpoint Location Plan - Section 3.pdf [PDF]
- 18.13 Residential Visual Impact Assessment 1.pdf [PDF]
- 18.14 Residential Visual Impact Assessment Section 2.pdf [PDF]
- 18.15 Residential Visual Impact Assessment Section 3.pdf [PDF]
- 18.16 Landscape Mitigation - Section 1.pdf [PDF]
- 18.17 Landscape Mitigation - Section 2.pdf [PDF]
- 18.18 Landscape Mitigation - Section 3.pdf [PDF]
- 18.19 Landscape and Habitat Design.pdf [PDF]
- 18.20 Landscape and Habitat Design.pdf [PDF]
- 18.21 Landscape and Habitat Design.pdf [PDF]
- Chapter 4 - Drawings
- 4.01 S1 General Arrangement.pdf [PDF]
- 4.02 S2 General Arrangement.pdf [PDF]
- 4.03 S3 General Arrangement.pdf [PDF]
- 4.04 S1 Mainline Plan & Profile.pdf [PDF]
- 4.05 S2 Mainline Plan & Profile.pdf [PDF]
- 4.06 S3 Mainline Plan & Profile.pdf [PDF]
- 4.07 Side Road Plan & Profile.pdf [PDF]
- 4.08 Side Road Plan & Profile.pdf [PDF]
- 4.09 S3 Side Road Plan & Profile.pdf [PDF]
- 4.10 Link Road Plan & Profile.pdf [PDF]
- 4.11 Link Road Plan and Profile.pdf [PDF]
- 4.12 S1 Structure Location Plan.pdf [PDF]
- 4.13 River Finn Crossing.pdf [PDF]
- 4.14 River Finn Access and Piling.pdf [PDF]
- 4.15 River Finn Construction & Temporary Works.pdf [PDF]
- 4.16 Cloghroe River.pdf [PDF]
- 4.17 Backlees River Bridge.pdf [PDF]
- 4.18 S2 Structure Location Plan.pdf [PDF]
- 4.19 River Swilly Crossing.pdf [PDF]
- 4.20 River Swilly Access and Piling.pdf [PDF]
- 4.21 River Swilly Construction & Temporary Works.pdf [PDF]
- 4.22 Existing Underpass N13A016 GA.pdf [PDF]
- 4.23 Existing Underpass N13A016 GA.pdf [PDF]
- 4.24 Active Travel Footbridge GA.pdf [PDF]
- 4.25 S3 Structure Location Plan.pdf [PDF]
- 4.26 River Deele.pdf [PDF]
- 4.27 River Deele Sections.pdf [PDF]
- 4.29 Swilly Burn.pdf [PDF]
- 4.30 Typical Overbridge.pdf [PDF]
- 4.31 Typical Skewed Overbridge.pdf [PDF]
- 4.32 Typical High Skew Underbridge.pdf [PDF]
- 4.33 Typical High Skew Underbridge Elevations.pdf [PDF]
- 4.34 Buried Box.pdf [PDF]
- 4.35 N14 N15 to A5 Link.pdf [PDF]
- 4.36 N14 N15 Construction methodology.pdf [PDF]
- 4.37 N14 N15 Construction Sequence 1.pdf [PDF]
- 4.38 N14 N15 Construction Sequence 2.pdf [PDF]
- 4.39 RC Abutment.pdf [PDF]
- 4.40 S1 Drainage Layout.pdf [PDF]
- 4.41 S2 Drainage Layout.pdf [PDF]
- 4.42 S3 Drainage Layout.pdf [PDF]
- 4.44 Principal Geometric Parameters.pdf [PDF]
- 4.47 S1 Proposed Haulage Route.pdf [PDF]
- 4.48 S2 Proposed Haulage Route.pdf [PDF]
- 4.49 S3 Proposed Haulage Routes.pdf [PDF]
- 4.50 S1 Park and Share Cycle Facility.pdf [PDF]
- 4.51 S2 Park and Share Cycle Facility.pdf [PDF]
- 4.52 S3 Park and Share Cycle Facility.pdf [PDF]
- 4.54 S1 Proposed Road Lighting Network.pdf [PDF]
- 4.55 S2 Proposed Road Lighting Network.pdf [PDF]
- 4.56 S3 Proposed Road lighting Network.pdf [PDF]
- 4.57 S1 Fencing and Environmental Barrier.pdf [PDF]
- 4.58 S2 Fencing and Environmental Barriers.pdf [PDF]
- 4.59 S3 Fencing and Environmental Barriers.pdf [PDF]
- 4.60 GI & Earthworks S1 Mainline.pdf [PDF]
- 4.61 GI & Earthworks S2 Mainline.pdf [PDF]
- 4.62 S3 GI & Earthworks S3 Mainline.pdf [PDF]
- 4.63 S1 Confirmatory GI.pdf [PDF]
- 4.64 S2 Confirmatory GI.pdf [PDF]
- 4.65 S3 Confirmatory GI.pdf [PDF]
- 4.66 Typical Material Extraction and Deposition Areas.pdf [PDF]
- 4.67 GI & Earthworks S1 SideRoads.pdf [PDF]
- 4.68 GI & Earthworks S2 SideRoads.pdf [PDF]
- 4.69 GI & Earthworks S3 SideRoads.pdf [PDF]
- Chapter 7 - Drawings
- Chapter 8 - Drawings
- 8.01 - Human Health Study Area.pdf [PDF]
- 8.02 - Pobal Deprivation Map by Electoral Division (Pobal, 2022).pdf [PDF]
- 8.03 - Section 1 Health Assessment Indicative Community Location.pdf [PDF]
- 8.04 - Section 2 Health Assessment Indicative Community Locations.pdf [PDF]
- 8.05 - Section 3 Health Assessment Indicative Community Locations.pdf [PDF]
- 8.06 - Section 1 Health Equity and Inequalities Assessment.pdf [PDF]
- 8.07 - Section 2 Health Equity and Inequalities Assessment.pdf [PDF]
- 8.08 - Section 3 Health Equity and Inequalities Assessment.pdf [PDF]
- Chapter 9a - Drawings
- 9A.01 European Sites (Irl) – Overview.pdf [PDF]
- 9A.02 European Sites (Irl) – All Sections Breakdown.pdf [PDF]
- 9A.03 European_Sites_UK_Overview.pdf [PDF]
- 9A.04 European Sites (UK) – All Sections Breakdown.pdf [PDF]
- 9A.05 Lough Foyle Ramsar Site – Overview.pdf [PDF]
- 9A.06 Nationally Designated Sites (Irl) – Overview.pdf [PDF]
- 9A.07 Nationally Designated Sites (Irl) – All Sections Breakdown.pdf [PDF]
- 9A.08 Nationally Designated Sites (UK) – Overview.pdf [PDF]
- 9A.09 Nationally Designated Sites (UK) – All Sections Breakdown .pdf [PDF]
- 9A.10 Habitat Mapping – Section 1.pdf [PDF]
- 9A.11 Habitat Mapping – Section 2.pdf [PDF]
- 9A.12 Habitat Mapping – Section 3.pdf [PDF]
- 9A.13 Key Ecological Receptors – Section 1.pdf [PDF]
- 9A.14 Key Ecological Receptors – Section 2.pdf [PDF]
- 9A.15 Key Ecological Receptors - Section 3.pdf [PDF]
- 9A.16 Globeflower – Section 1.pdf [PDF]
- 9A.17 Invasive Alien Plant Species – Section 1.pdf [PDF]
- 9A.18 Invasive Alien Plant Species – Section 2.pdf [PDF]
- 9A.19 Invasive Alien Plant Species – Section 3.pdf [PDF]
- 9A.20 Section 1 – Otter Evidence (pre-2022).pdf [PDF]
- 9A.21 Section 1 – Otter Evidence (2023–2025).pdf [PDF]
- 9A.22 Section 2 - Otter Evidence (pre-2022).pdf [PDF]
- 9A.23 Section 2 - Otter Evidence (2023+2025).pdf [PDF]
- 9A.24 Section 1 – Trail Camera Locations.pdf [PDF]
- 9A.25 Section 2 - Trail Camera Locations.pdf [PDF]
- 9A.26 Pre-2022 Bat Surveys – Section 1 Transects.pdf [PDF]
- 9A.27 Pre-2022 Bat Surveys – Section 2 Transects.pdf [PDF]
- 9A.28 Pre-2022 Bat Surveys – Section 1 Structure Surveys.pdf [PDF]
- 9A.29 Pre-2022 Bat Surveys – Section 2 Structure Surveys.pdf [PDF]
- 9A.30 Pre-2023 Bat Surveys – S3 Buildings.pdf [PDF]
- 9A.31 Pre-2023 Bat Surveys – S3 Bridge Surveys.pdf [PDF]
- 9A.32 Pre-2023 Bat Surveys – S3 Tree Surveys.pdf [PDF]
- 9A.33 Pre-2022 Bat Surveys – Section 1 Static Detector Locations.pdf [PDF]
- 9A.34 Pre-2022 Bat Surveys – Section 2 Static Detector Locations.pdf [PDF]
- 9A.35 Pre-2023 Bat Surveys – Section 3 Static Detector Locations.pdf [PDF]
- 9A.36 2025 Bat Surveys – Section 1 Structures Preliminary Roost Assessment.pdf [PDF]
- 9A.37 2025 Bat Surveys – Section 1 Structures Emergence Surveys.pdf [PDF]
- 9A.38 2025 Bat Surveys – Section 2 Structures Preliminary Roost Assessment.pdf [PDF]
- 9A.39 2025 Bat Surveys – Section 2 Structures Emergence Surveys.pdf [PDF]
- 9A.40 2025 Bat Surveys – Section 1 Tree Roost Surveys.pdf [PDF]
- 9A.41 2025 Bat Surveys – Section 2 Tree Roost Surveys.pdf [PDF]
- 9A.42 2023–2025 Bat Surveys – S3 Buildings.pdf [PDF]
- 9A.43 2023–2025 Bat Surveys – S3 Bridge Surveys.pdf [PDF]
- 9A.44 2025 Bat Surveys – S3 Tree Surveys.pdf [PDF]
- 9A.45 2025 Bat Surveys – Section 1 Static Detector Locations.pdf [PDF]
- 9A.46 2025 Bat Surveys – Section 2 Static Detector Locations.pdf [PDF]
- 9A.47 2023-2025 Bat Surveys S3 Static Detector Locations.pdf [PDF]
- 9A.48 Breeding Birds Surveys 2020.pdf [PDF]
- 9A.49 Breeding Birds Surveys 2023.pdf [PDF]
- 9A.50 Kingfisher Surveys.pdf [PDF]
- 9A.51 Breeding Raptor Survey Locations.pdf [PDF]
- 9A.52 Section 1 – Raptor VP Survey Results.pdf [PDF]
- 9A.53 Section 1 – 2017-2018 Wintering Bird Survey Vantage Points.pdf [PDF]
- 9A.54 Section 2 – 2017-2020 Wintering Bird Survey Study Area.pdf [PDF]
- 9A.55 Section 2 – 2020-2021 Wintering Bird Survey Area.pdf [PDF]
- 9A.56 Section 2 – 2022-2023 Wintering Bird Survey Study Area.pdf [PDF]
- 9A.57 Section 2 – 2022-2023 Wintering Bird Windscreen Survey Results.pdf [PDF]
- 9A.58 Section 2 – 2025-2026 Wintering Bird Survey Area.pdf [PDF]
- 9A.59 Section 2 – 2025 Wintering Bird Survey Primary flightline locations.pdf [PDF]
- 9A.60 Section 2 – 2025 Wintering Bird Survey Results.pdf [PDF]
- 9A.61 S3 Pre-2025 Winter Bird Survey Locations.pdf [PDF]
- 9A.62 2023 Bat Surveys - Section 3 Transects.pdf [PDF]
- 9A.63 Pre-2023 Bat Survey - Section 3 Transects.pdf [PDF]
- 9A.64 Section 2 – 2022-2023 Wintering Bird Survey Results (Curlew).pdf [PDF]
- 9A.65 Section 2 – 2022-2023 Wintering Bird Survey Results (Greylag Goose).pdf [PDF]
- 9A.66 Section 2 – 2022-2023 Wintering Bird Survey Results (Redshank).pdf [PDF]
- 9A.67 Section 2 – 2025-2026 Wintering Bird Survey Results (Curlew).pdf [PDF]
- 9A.68 Section 2 – 2025-2026 Wintering Bird Survey Results (Teal).pdf [PDF]
- 9A.69 Section 2 – 2025-2026 Wintering Bird Survey Results (Greylag Goose).pdf [PDF]
- 9A.70 Section 2 – 2025-2026 Wintering Bird Survey Results (Redshank).pdf [PDF]
- 9A.71 Section 3 - 2025-2026 Windscreen Survey – Study Area.pdf [PDF]
- 9A.72 Section 3 - 2025 -2026 Survey results.pdf [PDF]
- Chapter 9b - Drawings
- Index
- Chapter 10 - Drawings
- 4. Biodiversity No Net Loss Report
- 5. AA Screening Report & Determination
- 7. Location Maps
- 8. CEO Application to ACP
- 9. EIA Portal Notification
- Cover Letter.pdf [PDF]
- 1. OSR
- Commission Documents
- Applicant Documents
- Féach ar dhoiciméid ghaolmhara
Is féidir tuairimí maidir leis an iarratas nó maidir leis an achomharc a thaisceadh laistigh den tréimhse ama chuí anseo.
Firefox
Safari
Chrome
Opera
Edge