An Coimisiún Pleanála - Tagairt an cháis: PAX16.324387
located within the townlands of Muingmore (An Mhoing Mhór), Doolough (Dumha Locha), Tristia (Troiste), Moneynierin (Moing an Iarainn) and Bangor (Baingear) County Mayo. (www.muingmoresid.ie)
Comhairle Contae Mhaigh Eo
Cur síos
The proposed development consists of 13 wind turbines, a 110kV substation, battery energy storage system (BESS) and all associated infrastructure
Cineál Cáis
Forbairt Phríobháideach - Iarratas RED III
Cinneadh
Case is due to be decided by 03/08/2027
TMTT
Tá
RTN
Tá
Stair
-
19/06/2026
Lodged
Doiciméid
-
Case Documentation
- View associated documents
- Applicant Documents
- Application Documents
- 1. Planning Documents
- 2. Planning Drawings
- 1. SLR
- 501.065301.00001.D01 Location Map.pdf [PDF]
- 501.065301.00001.D02 Site Notice Locations_1.pdf [PDF]
- 501.065301.00001.D02-1 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D02-10 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D02-2 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D02-3 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D02-4 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D02-5 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D02-6 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D02-7 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D02-8 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D02-9 Site Notice Locations.pdf [PDF]
- 501.065301.00001.D03 Existing Site Layout- Key Plan-A1L.pdf [PDF]
- 501.065301.00001.D03-1 Existing Site Layout-1 of 8-A1L.pdf [PDF]
- 501.065301.00001.D03-2 Existing Site Layout -2 of 8-A1L.pdf [PDF]
- 501.065301.00001.D03-3 Existing Site Layout -3 of 8-A1L.pdf [PDF]
- 501.065301.00001.D03-4 Existing Site Layout -4 of 8-A1L.pdf [PDF]
- 501.065301.00001.D03-5 Existing Site Layout -5 of 8-A1L.pdf [PDF]
- 501.065301.00001.D03-6 Existing Site Layout -6 of 8-A1L.pdf [PDF]
- 501.065301.00001.D03-7 Existing Site Layout -7 of 8-A1L.pdf [PDF]
- 501.065301.00001.D03-8 Existing Site Layout -8 of 8-A1L.pdf [PDF]
- 501.065301.00001.D04 Proposed Site Layout - Key Plan.pdf [PDF]
- 501.065301.00001.D04-1 Proposed Site Layout -1 of 8.pdf [PDF]
- 501.065301.00001.D04-2 Proposed Site Layout -2 of 8.pdf [PDF]
- 501.065301.00001.D04-3 Proposed Site Layout -3 of 8.pdf [PDF]
- 501.065301.00001.D04-4 Proposed Site Layout -4 of 8.pdf [PDF]
- 501.065301.00001.D04-5 Proposed Site Layout -5 of 8.pdf [PDF]
- 501.065301.00001.D04-6 Proposed Site Layout -6 of 8.pdf [PDF]
- 501.065301.00001.D04-7 Proposed Site Layout -7 of 8.pdf [PDF]
- 501.065301.00001.D04-8 Proposed Site Layout -8 of 8.pdf [PDF]
- 501.065301.00001.D05 Proposed Turbine & Overrun Areas.pdf [PDF]
- 501.065301.00001.D05-1 Proposed Turbine No 1.pdf [PDF]
- 501.065301.00001.D05-10 Proposed Turbine No 10.pdf [PDF]
- 501.065301.00001.D05-11 Proposed Turbine No 11.pdf [PDF]
- 501.065301.00001.D05-12 Proposed Turbine No 12.pdf [PDF]
- 501.065301.00001.D05-13 Proposed Turbine No 13.pdf [PDF]
- 501.065301.00001.D05-14a Proposed Turbine Overrun Areas.pdf [PDF]
- 501.065301.00001.D05-14b Proposed Turbine Overrun Areas.pdf [PDF]
- 501.065301.00001.D05-15a Proposed Turbine Overrun Areas.pdf [PDF]
- 501.065301.00001.D05-15b Proposed Turbine Overrun Areas.pdf [PDF]
- 501.065301.00001.D05-16 Proposed Turbine Overrun Areas.pdf [PDF]
- 501.065301.00001.D05-2 Proposed Turbine No 2.pdf [PDF]
- 501.065301.00001.D05-3 Proposed Turbine No 3.pdf [PDF]
- 501.065301.00001.D05-4 Proposed Turbine No 4.pdf [PDF]
- 501.065301.00001.D05-5 Proposed Turbine No 5.pdf [PDF]
- 501.065301.00001.D05-6 Proposed Turbine No 6.pdf [PDF]
- 501.065301.00001.D05-7 Proposed Turbine No 7.pdf [PDF]
- 501.065301.00001.D05-8 Proposed Turbine No 8.pdf [PDF]
- 501.065301.00001.D05-9 Proposed Turbine No 9.pdf [PDF]
- 501.065301.00001.D06-1 Turbine Foundation and Hardstanding Layout.pdf [PDF]
- 501.065301.00001.D06-2 Turbine Foundation and Hardstanding Layout.pdf [PDF]
- 501.065301.00001.D07 Turbine Elevation.pdf [PDF]
- 501.065301.00001.D08 Peat Rest and Habitat Mgt.pdf [PDF]
- 501.065301.00001.D09 100m Met Mast Details.pdf [PDF]
- 501.065301.00001.D10 Temporary Construction Compound.pdf [PDF]
- 501.065301.00001.D11 Site Gates and Fence Details.pdf [PDF]
- 501.065301.00001.D12 Proposed Drainage Layout - Key Plan.pdf [PDF]
- 501.065301.00001.D12-1 Proposed Drainage Layout -1 of 5.pdf [PDF]
- 501.065301.00001.D12-2 Proposed Drainage Layout -2 of 5.pdf [PDF]
- 501.065301.00001.D12-3 Proposed Drainage Layout -3 of 5.pdf [PDF]
- 501.065301.00001.D12-4 Proposed Drainage Layout -4 of 5.pdf [PDF]
- 501.065301.00001.D12-5 Proposed Drainage Layout -5 of 5.pdf [PDF]
- 501.065301.00001.D13 Site Tracks Drainage Details-A3L.pdf [PDF]
- 501.065301.00001.D14 Typical Drainage Details-Outfall.pdf [PDF]
- 501.065301.00001.D15 Typical Drainage Details-Silt Fence.pdf [PDF]
- 501.065301.00001.D16 Typical Drainage Details-Silt Trap.pdf [PDF]
- 501.065301.00001.D17 Typical Drainage Details-Culvert.pdf [PDF]
- 501.065301.00001.D18 Typical Drainage Details-Manhole.pdf [PDF]
- 501.065301.00001.D19 Typical HV Joint Details.pdf [PDF]
- 501.065301.00001.D20 Typical Cable Trench Details.pdf [PDF]
- 501.065301.00001.D21 Road Construction Details.pdf [PDF]
- 501.065301.00001.D22 Proposed Collector Cable Network to Substation.pdf [PDF]
- 501.065301.00001.D23 Site Access Location - Key Plan-A0L.pdf [PDF]
- 501.065301.00001.D23-1 Site Access Location - 1 of 3-A1L.pdf [PDF]
- 501.065301.00001.D23-2 Site Access Location - 2 of 3-A1L.pdf [PDF]
- 501.065301.00001.D23-3 Site Access Location - 3 of 3-A1L.pdf [PDF]
- 501.065301.00001.D24-1 HGV Vehicle Tracking-Junc T1_T2.pdf [PDF]
- 501.065301.00001.D24-2 HGV Vehicle Tracking-Junc T3_T5.pdf [PDF]
- 501.065301.00001.D24-3 HGV Vehicle Tracking-Junc T8_T9_T10_T11_T12&T13 .pdf [PDF]
- 501.065301.00001.D25-1 Swept Path long blade.pdf [PDF]
- 501.065301.00001.D25-2 Swept Path long blade.pdf [PDF]
- 501.065301.00001.D25-3 Swept Path long blade.pdf [PDF]
- 2. TLI - Subs_BESS
- 300101402-C-DR-0002-P7_Overall Site Layout Plan.pdf [PDF]
- 300101402-C-DR-0003-P4_Substation Site Layout Plan.pdf [PDF]
- 300101402-C-DR-0004-P4_Substation Compound Elevations_Sh 1 of 2.pdf [PDF]
- 300101402-C-DR-0005-P4_Substation Compound Elevations_Sh 2 of 2.pdf [PDF]
- 300101402-C-DR-0006-P4_Substation Compound Section A-A.pdf [PDF]
- 300101402-C-DR-0007-P6_Substation Drainage Layout Plan.pdf [PDF]
- 300101402-C-DR-0008-P1_Site Drainage Attenuation Basins Layout Plan.pdf [PDF]
- 300101402-C-DR-0020-P4_Compound Cut and Fill Plan.pdf [PDF]
- 300101402-C-DR-0021-P5_Compound Cut and Fill Sections.pdf [PDF]
- 300101402-C-DR-0030-P4_Substation Swept Path Analysis - Fire Truck.pdf [PDF]
- 300101402-C-DR-0100-P4_Eirgrid Control Building Details.pdf [PDF]
- 300101402-C-DR-0200-P4_MV Switchgear Building Details.pdf [PDF]
- 300101402-C-DR-0301-P0_Typical Compound Details.pdf [PDF]
- 300101402-C-DR-0302-P0_Typical Access Road Details.pdf [PDF]
- 300101402-C-DR-0303-P0_Typical Drainage Details_Sheet 1 of 2.pdf [PDF]
- 300101402-C-DR-0304-P1_Typical Drainage Details_Sheet 2 of 2.pdf [PDF]
- 300101402-C-DR-0306-P1_Concrete Post & Rail Fence Details_A3.pdf [PDF]
- 300101402-C-DR-0307-P0_Substation Palisade Fence Details.pdf [PDF]
- 300101402-C-DR-0308-P0_Substation Palisade Gate Details.pdf [PDF]
- 300101402-C-DR-0400-P0_Substation Lightning Monopole Foundation Details.pdf [PDF]
- 300101402-C-DR-1003-P5_BESS Site Layout Plan.pdf [PDF]
- 300101402-C-DR-1004-P4_BESS Compound Elevations_Sh 1 of 2.pdf [PDF]
- 300101402-C-DR-1005-P4_BESS Compound Elevations_Sh 2 of 2.pdf [PDF]
- 300101402-C-DR-1006-P4_BESS Compound Section B-B.pdf [PDF]
- 300101402-C-DR-1007-P8_BESS Drainage Layout Plan.pdf [PDF]
- 300101402-C-DR-1030-P5_BESS Swept Path Analysis - Fire Truck.pdf [PDF]
- 300101402-C-DR-1200-P4_BESS MV Switchgear Building Details.pdf [PDF]
- 1. SLR
- 3. Volume 1 - EIAR NTS
- 4. Volume 2 - EIAR
- 01 Introduction
- 02 Description of the Development
- 03 Site selection Alt, EIA Scope, Consult Key Issues
- 04 Population and Human Health
- 05 Biodiversity
- 06 Land, Soils and Geology
- 07 Hydrology & Water
- 08 Air Quality and Climate
- 09 Noise and Vibration
- 10 Landscape and Visual
- 11 Shadow Flicker
- 12 Cultural Heritage
- 13 Material Assets telecommunications and aviation
- 14 Traffic and transportation
- 15 Major Accidents and Disasters
- 16 Interactions
- 17 Schedule of Mitigation Measures
- 5. Volume 3 - EIAR Tech. Appendices
- 02 Description of the Development
- 03 Site Selection and Alternatives
- Technical Appendix 3-1 Proposed Muingmore Wind Farm Brochure.pdf [PDF]
- Technical Appendix 3-2 First Residents Letter.pdf [PDF]
- Technical Appendix 3-3 Scoping Report.pdf [PDF]
- Technical Appendix 3-4 Minutes of Meeting with Mayo County Council on 16.01.2025.pdf [PDF]
- Technical Appendix 3-5 Meeting Records with An Coimisiún Pleanála.pdf [PDF]
- Technical Appendix 3-6 Minutes of Meeting with NPWS.pdf [PDF]
- Technical Appendix 3-7 Community Consultation Report.pdf [PDF]
- Technical Appendix 3-8 Log of Non-Substantive Statutory and Non-statutory Scoping.pdf [PDF]
- 04 Population and Human Health
- 05 Biodiversity
- Technical Appendix 5-1 Technical Habitat Report.pdf [PDF]
- Technical Appendix 5-2 Bird survey report.pdf [PDF]
- Technical Appendix 5-3 Bat Survey Report.pdf [PDF]
- Technical Appendix 5-4 Triturus Ltd Aquatic Baseline & Fisheries Assessment.pdf [PDF]
- Technical Appendix 5-5 Peatland Restoration Plan (PRP) & Habitat Management Plan (HMP).pdf [PDF]
- Technical Appendix 5-6 Habitat Condition Assessment Report.pdf [PDF]
- Technical Appendix 5-7 Marsh Fritillary Survey Report.pdf [PDF]
- Technical Appendix 5-8 Avian Collision Risk Model Report.pdf [PDF]
- 06 Land, Soils and Geology
- 07 Hydrology & Water
- Technical Appendix 7-1 EU Directives, National Legislation and Regulations, Guidelines,Technica.pdf [PDF]
- Technical Appendix 7-2 Site Visit Details.pdf [PDF]
- Technical Appendix 7-3 TDR and Cable Route.pdf [PDF]
- Technical Appendix 7-4 Water Framework Directive.pdf [PDF]
- Technical Appendix 7-5 Surface Water Laboratory Results.pdf [PDF]
- Technical Appendix 7-6 Rating of Existing Environmental Significance, Sensitivity (IGI, 2013 .pdf [PDF]
- Technical Appendix 7-7 Description of Effects (EPA, 2022).pdf [PDF]
- Technical Appendix 7-8 Classification of the Significance of Effects (EPA, 2022).pdf [PDF]
- 09 Noise and Vibration
- Technical Appendix 9-1 Glossary of Terms.pdf [PDF]
- Technical Appendix 9-2 Copy of 2025 Wind Energy Ireland Position Paper on AM Conditions.pdf [PDF]
- Technical Appendix 9-3 Baseline Noise Survey Details.pdf [PDF]
- Technical Appendix 9-4 Alternative Turbine Calculations.pdf [PDF]
- Technical Appendix 9-5 Background Noise Survey Measurement Data.pdf [PDF]
- Technical Appendix 9-6 Grid Connection Route (GCR) Construction Noise Levels.pdf [PDF]
- Technical Appendix 9-7 Operational Wind Turbine Noise Assessment Graphs.pdf [PDF]
- 10 Landscape and Visual
- 11 Shadow Flicker
- Technical Appendix 11-1 Shadow Flicker Modelling Input Data.pdf [PDF]
- Technical Appendix 11-2 Shadow Flicker Scenario 1 Shutdown Times by Turbine.pdf [PDF]
- Technical Appendix 11-3 Shadow Flicker Scenario 3 Shutdown Times by Turbine.pdf [PDF]
- Technical Appendix 11-4 Shadow Flicker Scenario 1 Shutdown Times by Turbine.pdf [PDF]
- 12 Cultural Heritage
- 13 Material Assets telecommunications and aviation
- 14 Traffic and transportation
- 6. Volume 4 - Photomontages
- Email - Notification letter reissued to HSE (correct address).pdf [PDF]
- Application Documents
- Commission Documents
- Third Party Documents
- Submissions - 7th August 2026
- Observers
- Adrian Tinniswood.pdf [PDF]
- Agnes & PJ Carey.pdf [PDF]
- Alan Coyle.pdf [PDF]
- Alan Lynch.pdf [PDF]
- Alison Hickey.pdf [PDF]
- An Even Better Place To Work - Brian Bakeberg.pdf [PDF]
- Angela Gallagher.pdf [PDF]
- Ann Ruddy.pdf [PDF]
- Anna Gallagher.pdf [PDF]
- Anne Barrett.pdf [PDF]
- Anne Mangan.pdf [PDF]
- Annemarie Doherty.pdf [PDF]
- Annette Kelly.pdf [PDF]
- AnnMarie Keegan.pdf [PDF]
- Anthony Leneghan & Caroline Martin.pdf [PDF]
- Anthony Leneghan.pdf [PDF]
- Aoife Hickey.pdf [PDF]
- Aoife Howard.pdf [PDF]
- Audrey Geraghty.pdf [PDF]
- Audrey Lambert.pdf [PDF]
- Barbara & Alan Burke.pdf [PDF]
- Brendan O'Sullivan.pdf [PDF]
- Brian & Katherine Monaghan.pdf [PDF]
- Brian Bakeberg.pdf [PDF]
- Brian Barrett.pdf [PDF]
- Bridget & Stuart Trotter.pdf [PDF]
- Bridget Keady.pdf [PDF]
- Bridget Mangan.pdf [PDF]
- Bridget O'Sullivan.pdf [PDF]
- Caitriona Sweeney.pdf [PDF]
- Caoimhe Howard.pdf [PDF]
- Caroline & David Lally.pdf [PDF]
- Caroline & JT McDonagh.pdf [PDF]
- Caroline Carroll.pdf [PDF]
- Caroline Flynn.pdf [PDF]
- Catherine Clarke & Ian Williams.pdf [PDF]
- Catherine Howard.pdf [PDF]
- Christina Barrett.pdf [PDF]
- Ciara Hickey.pdf [PDF]
- Ciaran Leneghan.pdf [PDF]
- Ciaran O'Hara.pdf [PDF]
- Cllr Gerry Coyle.pdf [PDF]
- Colin Holmes.pdf [PDF]
- Collette Sweeney.pdf [PDF]
- Colm Leneghan.pdf [PDF]
- Corbin Bakeberg.pdf [PDF]
- Cáit O'Sullivan.pdf [PDF]
- Damien Langan.pdf [PDF]
- Daniel & Aaron Lally.pdf [PDF]
- Danny Howard.pdf [PDF]
- David Barrett.pdf [PDF]
- David Gunning.pdf [PDF]
- Deborah O'Sullivan.pdf [PDF]
- Deirdre Ruddy.pdf [PDF]
- Denise Murphy.pdf [PDF]
- Doireann O'Hara & Fran McNulty.pdf [PDF]
- Donald Teskey.pdf [PDF]
- Edel Thompson.pdf [PDF]
- Edward Noel Coyle.pdf [PDF]
- Edward Shevlin.pdf [PDF]
- Eimear Holmes.pdf [PDF]
- Eithne Holmes.pdf [PDF]
- Elizabeth Bradshaw & William Duffy.pdf [PDF]
- Ellen O'Donoghue.pdf [PDF]
- Emer Lindsay.pdf [PDF]
- Emma Gaughan.pdf [PDF]
- Erris Action Group.pdf [PDF]
- Erris Chamber of Commerce and Industry - Brian Bakeberg.pdf [PDF]
- Erris Coast Hotel John Joyce.pdf [PDF]
- Erris Coast Hotel.pdf [PDF]
- Erris Family & Community Support Centre CLG.pdf [PDF]
- Eva Cassidy.pdf [PDF]
- Evelyn Goonan.pdf [PDF]
- Evita Coyle.pdf [PDF]
- Finola Geraghty.pdf [PDF]
- Fiona McKeniry.pdf [PDF]
- Fr. James Cribben.pdf [PDF]
- Frances Moran.pdf [PDF]
- Francis & Joan Lindsay.pdf [PDF]
- Gary Lindsay.pdf [PDF]
- Geesala National School- Caroline Scanlon.pdf [PDF]
- Geoff Loane.pdf [PDF]
- George Sweeney.pdf [PDF]
- Geraldine Conroy.pdf [PDF]
- Geraldine Geraghty.pdf [PDF]
- Geraldine Howard.pdf [PDF]
- Gerard Murphy.pdf [PDF]
- Gerry & Ann Lindsay.pdf [PDF]
- Gerry and Elaine Monaghan.pdf [PDF]
- Gráinne Leneghan.pdf [PDF]
- Helen Rogers.pdf [PDF]
- Helen Wims.pdf [PDF]
- Henry Peter Coyle.pdf [PDF]
- Holly McAndrew and Anthony Coyle.pdf [PDF]
- Ian Sweeney.pdf [PDF]
- Irene Keegan.pdf [PDF]
- Isla Grace Lee.pdf [PDF]
- Jack & Patricia Coyle.pdf [PDF]
- James King.pdf [PDF]
- James Mangan.pdf [PDF]
- Jan Thorpe.pdf [PDF]
- Jason O'Neill.pdf [PDF]
- Javier Arroyo Mangan.pdf [PDF]
- Jennifer Gaughan.pdf [PDF]
- Jimmy Gilheany.pdf [PDF]
- Joe & Jack Lindsay.pdf [PDF]
- John and Mary Lindsay.pdf [PDF]
- John Callaghan.pdf [PDF]
- John Lambert.pdf [PDF]
- John O'Donoghue.pdf [PDF]
- John reilly.pdf [PDF]
- John Vaughan.pdf [PDF]
- Joseph Clowry - Irish.pdf [PDF]
- Josephine, Sadie & Martin Ruddy.pdf [PDF]
- Julie Lynch.pdf [PDF]
- Justin Cassidy.pdf [PDF]
- Karen Moran.pdf [PDF]
- Karen Munnelly.pdf [PDF]
- Kathleen Gaughan.pdf [PDF]
- Kathleen Munnelly.pdf [PDF]
- Kathleen Nurena.pdf [PDF]
- Katie Munnelly.pdf [PDF]
- Kay Goonan.pdf [PDF]
- Keith & Aine Barrett.pdf [PDF]
- Kelly McGowan.pdf [PDF]
- Kelly Sweeney.pdf [PDF]
- Kevin Munnelly.pdf [PDF]
- Kyle & Carla Holmes.pdf [PDF]
- Lacken Ballycastle Community Landscape Protection Group.pdf [PDF]
- Larry Howard.pdf [PDF]
- Lauren Howard.pdf [PDF]
- Laurence Howard.pdf [PDF]
- Lisa Carey.pdf [PDF]
- Lorraine Brady.pdf [PDF]
- Lorraine Carolan.pdf [PDF]
- Lorraine Haran.pdf [PDF]
- Madison Lindsay Lee.pdf [PDF]
- Maebh Mullan - Invalid.pdf [PDF]
- Maisie McMaster.pdf [PDF]
- Marcella Butler.pdf [PDF]
- Margaret & Harry Kerrigan.pdf [PDF]
- Margaret & Sean Bilbow.pdf [PDF]
- Margaret Roche.pdf [PDF]
- Marian Gaughan.pdf [PDF]
- Marion Sweeney.pdf [PDF]
- Martin & Ann Marie Munnelly.pdf [PDF]
- Martin & Eithne Cosgrove.pdf [PDF]
- Martin Anthony Munnelly.pdf [PDF]
- Martin Butler.pdf [PDF]
- Martin Cosgrove.pdf [PDF]
- Martin Coyle.pdf [PDF]
- Martin Harrington.pdf [PDF]
- Martin O Malley.pdf [PDF]
- Mary Barrett.pdf [PDF]
- Mary Conroy.pdf [PDF]
- Mary Deane Snee & Barbara McNulty.pdf [PDF]
- Mary Finlay.pdf [PDF]
- Mary Joesphine Moss.pdf [PDF]
- Mary Kathleen Cronin.pdf [PDF]
- Mary Leneghan.pdf [PDF]
- Mary Martina Cronin.pdf [PDF]
- Mary Monaghan.pdf [PDF]
- Mary Murphy.pdf [PDF]
- Mary Ruddy.pdf [PDF]
- Maura Harrington.pdf [PDF]
- Maura McDonagh.pdf [PDF]
- Mayo Defective Concrete Action Group - Margaret Walsh.pdf [PDF]
- Mervyn Corway.pdf [PDF]
- Michael Barrett.pdf [PDF]
- Michael Leneghan.pdf [PDF]
- Michael Munnelly.pdf [PDF]
- Michelle Barrett.pdf [PDF]
- Michelle Gaughan.pdf [PDF]
- Natalie Lindsay.pdf [PDF]
- Natalie Sweeney.pdf [PDF]
- Natasha Walsh Gaughan.pdf [PDF]
- Niamh Leneghan.pdf [PDF]
- Nora Cosgrove.pdf [PDF]
- Nora Gaughan.pdf [PDF]
- Noreen Vaughan.pdf [PDF]
- Norma Summers.pdf [PDF]
- Nuala Bryan.pdf [PDF]
- Occupational Therapy Observation Report - Eva Cassidy.pdf [PDF]
- Olive Moran.pdf [PDF]
- Olivia Munnelly.pdf [PDF]
- Orla Bakeberg.pdf [PDF]
- Orla O'Kane.pdf [PDF]
- Orla Photography - Orla Bakeberg.pdf [PDF]
- P.J. Nallen & Others.pdf [PDF]
- Paddy Corrigan.pdf [PDF]
- Partick & Nora Monaghan.pdf [PDF]
- Pat Monaghan.pdf [PDF]
- Patricia Gaughan.pdf [PDF]
- Patricia McGann.pdf [PDF]
- Patrick Carty.pdf [PDF]
- Patrick McDonagh.pdf [PDF]
- Patrick Sweeney.pdf [PDF]
- Paul Evans.pdf [PDF]
- Paula Keegan.pdf [PDF]
- Peter Gaughan Jnr.pdf [PDF]
- Peter Gaughan.pdf [PDF]
- Phyllis Moran.pdf [PDF]
- PJ Goonan.pdf [PDF]
- Reynagh Keane.pdf [PDF]
- Ronan & Helen Cuffe.pdf [PDF]
- Rural West Environmentalists Limited.pdf [PDF]
- Ruth Sweeney.pdf [PDF]
- Sabina Barrett Munnelly.pdf [PDF]
- Samantha Lindsay.pdf [PDF]
- Sandra Brogan.pdf [PDF]
- Sara & Andrew Kerrigan.pdf [PDF]
- Sarah Donohoe.pdf [PDF]
- Sarah Moran.pdf [PDF]
- Scott Appleford.pdf [PDF]
- Sean & Hannah O'Donoghue.pdf [PDF]
- Sean & Patricia Ginty.pdf [PDF]
- Sean Barrett.pdf [PDF]
- Sean Conroy.pdf [PDF]
- Sean Gaughan.pdf [PDF]
- Sean Howard - Muingmore.pdf [PDF]
- Sean Howard.pdf [PDF]
- Sean Keegan.pdf [PDF]
- Sean Munnelly.pdf [PDF]
- Seán Murphy.pdf [PDF]
- Seán Ó Conraoi -Irish.pdf [PDF]
- Shane Lindsay.pdf [PDF]
- Sheamus Gerard Goonan.pdf [PDF]
- Sinead Sweeney.pdf [PDF]
- Siobhan & Martin Cafferkey.pdf [PDF]
- Stephen Sweeney.pdf [PDF]
- Susan Cosgrove & Michael Gaynard.pdf [PDF]
- Susan Reilly.pdf [PDF]
- Séamus & Anne Frances O'Hara.pdf [PDF]
- Tara Munnelly.pdf [PDF]
- Temerity Wine Estate - Brian Bakeberg.pdf [PDF]
- Teresa Lally.pdf [PDF]
- Thomas McAndrew.pdf [PDF]
- Thomas Scanlon.pdf [PDF]
- Tom Mangan.pdf [PDF]
- Tomas J Ó Maonghaile - Irish.pdf [PDF]
- Tricia Doherty.pdf [PDF]
- TurasóIreacht IorraIs Teo.pdf [PDF]
- Vera Carey.pdf [PDF]
- Veronica Coyle.pdf [PDF]
- Vincent Monaghan.pdf [PDF]
- Violet Mangan.pdf [PDF]
- William Harvey.pdf [PDF]
- Yvie Sweeney.pdf [PDF]
- Zoe Cosgrove.pdf [PDF]
- Áine Ní Chiaráin - Irish.pdf [PDF]
- Áine O'Sullivan.pdf [PDF]
- PA reports
- Prescribed Bodies
- Department of Defence.pdf [PDF]
- Department of Housing, Local Goverment and Heritage - 324387.pdf [PDF]
- Donegal County Council.pdf [PDF]
- Fáilte Ireland.pdf [PDF]
- Geological Survey Ireland- Department of Climate, Energy and the Enviroment.pdf [PDF]
- Inland Fisheries Ireland.pdf [PDF]
- Irish Aviation Authority.pdf [PDF]
- National Environmental Health Service.pdf [PDF]
- Transport Infrastructure Ireland.pdf [PDF]
- Uisce eireann.pdf [PDF]
- Observers
- Submissions - 7th August 2026
- Applicant Documents
- View associated documents
Is féidir tuairimí maidir leis an iarratas nó maidir leis an achomharc a thaisceadh laistigh den tréimhse ama chuí anseo.
Finscéal Léarscáil
- Cás Beo
- Deonaithe
- Diúltaithe
- Neamhbhailí
- Tarraingthe siar
- Féach Cás le haghaidh tuilleadh sonraí
Firefox
Safari
Chrome
Opera
Edge